METHOD STATMENT
FOR MANUAL AND MECHANICAL EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 1 /7
METHOD STATMENT
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
PP 1 - ANG - rev. 2
ALGIERS REFINERY
REHABILITATION AND ADAPTATION
METHOD STATMENT
FOR MANUAL AND MECHANICAL
EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 2/ 7
SOMMAIRE
1. PURPOSE
2. RESPONSIBILITIES
SITE MANAGER
HSE MANAGER
CONSTACTION MANAGER
SAFETY MANAGER
AREA MANAGER
CIVIL SUPERVISOR
EQUIPMENTS/TOOLS.
MATRIALS(IF REQURED).
4. WORK METHODOLOGY.
PREMIT.
EXCAVATION
MECHANICAL EXCAVATION.
MANUAL EXCAVATION.
5. SAFETY
6. ATTACHEMENT
ALGIERS REFINERY
REHABILITATION AND ADAPTATION
METHOD STATMENT
FOR MANUAL AND MECHANICAL
EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 3/ 7
1. PURPOSE:
The propose of this work method statement is to outline the general requirement define
the methodology for mechanical and manual excavation works.
2. RESPONSIBILITES
SITE MANAGER
Site Manager is responsible for the execution of the site all activities as to concrete
pouring, which includes compliance with drawing, procedures and specification.
HSE MANAGER
CONSRUCTION MANAGER
He has the overall responsibilities for work management in accordance with the
contract requirements of work and safety with support of HSE Manager as to all area
and Quality requirement.
He shall control the execution of the work in compliance with this method of statement
plan, JSA and HSE project requirements, he coordinates with contractor and asset
holders.
SAFETY OFFICER
He is assigned to an area under Site HSE Manager and is responsibility for the
implementation of all safety measures, procedures which is required for the proper
ALGIERS REFINERY
REHABILITATION AND ADAPTATION
METHOD STATMENT
FOR MANUAL AND MECHANICAL
EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 4/ 7
execution of the work defined under in this Method statement (HSE Plan & JAS). He
coordinates with civil supervisor for mitigation of all hazard related to the area.
CIVIL SUPERVISOR.
He has the responsibility for the proper excavation in accordance with this MS and
JAS (JOB OF ANALYSYS).
• He arranges the manpower. Equipment and materials needed at the site area.
• He is in charge of preparation and submission of the permit to work.
• He will report to the area manager
• He will supervise the work on the site.
Constraction manager
CIVIL SUPERVISER
METHOD STATMENT
FOR MANUAL AND MECHANICAL
EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 5/ 7
EQUIPMENTS/TOOLS.
• Pick-Axe
• Excavator
• Backhoe Excavator.
• Loader.
• Dump Truck.
4. WORK METHOLOGY
PERMIT
approval by SONATRACH.
permit.
METHOD STATMENT
FOR MANUAL AND MECHANICAL
EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 6/ 7
and provide elevation of the existing top level to the civil supervisor.
EXCAVATION
MECHANICAL EXCAVATION
• Hard Barricade have be placed around the marked area to be excavated leaving
• In case of non-availability of dump track .soil will be temporary stoked in the site .
• Stair and hard barricade will be provide immediately upon completed excavation
MANUAL EXCAVATION
• Shovel and digger will be the used by the excavation .digger has to be used
METHOD STATMENT
FOR MANUAL AND MECHANICAL
EXCAVATION
Document Class : Project N° - Unit Doc Type Serial Number Rev. Page
CLASS 1
9952C 000 MS 006 A 7/ 7
5. SAFETY
• Safety Control
• Proper PPE
6. ATTACHEMENT
under weight.
1.1.4 Ensu re ali unexpected U/G services
activity must stop and lnform TP.
1.1.5 Mechanical excavation will be stopped and shifted to
manual excavation at lm around existing f acilities.
1.1.6 100% supervision by subcontractor during excavation
above existing facilities.
1.1.7 Tool box ta l k ta be held prior ta start activi ty
addressing presence of underg round facilities.
1.2 Collapse of walls. 1.2.1
Shoring 4S•angle or step excavation if not possible, 1.2.1.1 Ensure to main tain
ar tarpolin installation on wall side inside excavation. shoring. Particularly alter
1.1.2
Spoil and equipment kepi at !east 1meter away from incle ment weather.
the edge of
Excavation,
1.3 Personnel or machines falling 1.3.1 Provides suitable stairs for safe access into and out of 1.3.1.1 Practice 3 points contact when ascending and descend1ng
th e excavation. to ladders.
1.3.2
Provide warning signs.
1.3.3
Ensure there are suitable crossing poin ts with hard
guard rail.
1
Keangnam JOB SAFETY ANALSYS SCOPE : Excavation Works
2
IKeangnam JOB SAFETY ANALSYS SCOPE · Excavation Works
Equ i pment/Vehicle inspection. 3.l.l Ali equipment shall have TP equipment stkker as per
3 Mobilizing earth moving project requirements.
machinery ta worksite. 3.1.2 The inspection certiflcates shall be kept on the vehicles at
ali times.
Vehicles movement can cause crash 3.2.1 Ail drivers shall have valid Algerian drivlng licenses, ali
injuries. opera tors shall have 3•• party certifications .
The area where heavy equlpments are working shall be
clearly marked on site.
Reverse alarm.
Sale access shall be milintained at site for vehicles and
equipment
Provide competent banks man with HiVi vest around operating equipment
when necessary in controlling the worksites.
3
(.'lt !l<eangnam JOB SAFETY ANALSYS SCOPE : Excavation Works
4
Keangnam JOB SAFETY ANALSYS SCOPE : Excavation Works
3 Mobilizing
earth 3.3 lmproper use of 3.3.6 Persans shall not remain on a vehicle cab
moving machinery Excavator equipments. that is being loaded with loose mate rials.
to worksite. 3.3.7 Overhangs shall be avoided at a high
workface. The wheels or tracks of the
machine shall be at 90o ta the workface, to
enable quick withdrawal if necessary.
3.3.8 TP inspection sticker for the equipment.
Wheel loader 3.4.1 Ensure enough number of competent 3.4.1.1 Safe access shall be maintained at site for veh icles
Movement during hauling of banksmen wearing HiVi vest in controlling and equipment.
topsoil. the vehicle movement in the area. 3.4.1.2 E mployees on the site shall be aware of the
Ensure loader equipment shall be provided of strobe machines established blind spots before the
light in working condition operators start the ma chi ne.
Ensure the operator positioned the Ensure no driver inside the truck cab during
machinery at a safe distance from excavation 3.4.1.3 loading of materials.
such as trenches.
Superviser shall ensure that the site workers ta
recognize and avoid unsafe conditions and
to follow required safe work practices that
apply ta their work environments.
5
B<eangnam JOB SAFETY ANALSYS SCOPE : Excavation Works
6
Keangnam JOB SAFETY ANALSYS SCOPE : Excavation Works
7
IKeangnam JOB SAFETY ANALSYS SCOPE: Excavation Works
5.3 Excavated materials 5.3.1 Disposai pits shall be placed at !east l.Om away from
Close to the edge of the edge excavation Pit.
Trench. 5.3.2 Ensu re banksman in place and Controlling excavation
activi ty close to The edge of the trench !ines.
5.3.3 No storage of excavated materials
Along the edge.
5.4 Heat stress. 5.4.1 Cold drinking water and sunshades Wil l be proved.
Add itional precaution Will be informed th rough daily
TBT