Professional Documents
Culture Documents
Identifying Information
Region : IV-A
Barangay : MAYMANGGA
City/Municipality : AMADEO
Province : CAVITE
INDICATORS DATA REQUIREMENTS DATA SOURCE HOW TO ASSIGNED PASSING SCORE DOCUMENT
DETERMINE THE SCORE SCORE SCORE OBTAINED SUBMITTED
BY THE
BARANGAY
1. Functionality of the Functionality of BADAC Barangay If the result is: 8 4 8 EXECUTIVE
Barangay Anti-Drug based on DILG-DDB JMC Secretary • High = 8 ORDER
Abuse Council (BADAC) No. • Moderate = 4
2018-01 and DILG MC DILG • Low = 2
No. 2018-135 City/Municipal • No data = 0
Office
4. Maintenance of Record of RBI or similar system Barangay Secretary With RBI = 2 1 1 1 RBI FORMS WITH
Barangay Inhabitants Date of last update: Without RBI = 0 HOUSEHOLD AND
(RBI) DEC. 2022 INDIVIDUALS
TOTAL 20 13 20
SGLGB Form No. 1
INDICATORS DATA REQUIREMENTS DATA SOURCE HOW TO PERFECT PASSING SCORE DOCUMENT
DETERMINE THE SCORE SCORE OBTAINED BY SUBMITTED
SCORE THE
BARANGAY
1. Compliance with the BFDP Monitoring Form 1 DILG Presence of BFDP 2 2 2 DISCLOSURE BOARD
Barangay Full and Form 2 pursuant to City/Municipal Board DOCUMENTATIONS
Disclosure Policy DILG MC Office • Yes = 2
(BFDP) No. 2014-81 • No = 0
Onsite Inspection Compliance to the design 3 3 3 3 FULL DISCLOSURE
CY 2022, 4th Qtr pursuant to Annex 8 of BOARDS
compliance: the DILG MC No. 2014-
______________________ 81:
• Yes = 3
Location of the BFD • No = 0
Board: If the result of CY 2022, 8 6 8 DOCUMENTATON
4th Qtr compliance is: OF FULL
1.BRGY. MULTI – ●Full Compliance = 8 DISCLOSURE
PURPOSE HALL ●Partial Compliance: BOARDS
( COVERED COURT) o 7 financial documents
2. WAITING SHED posted = 7
3. BRGY. HEALTH o 5-6 financial documents
CENTER posted = 6
o 3-4 financial documents
posted = 4
o 1-2 financial documents
posted = 2
●Non-compliance = 0
●No data = 0
2. Percentage Increase in local Barangay Budget Barangay With increase? 3 3 3 BARANGAY
resources Preparation Form No. Treasurer • Yes = 3 BUDGET
2: Actual Income and • No = 0
Expenditure
CY 2021
PhP 2,448,837.42
CY 2022
PhP 3,334,928.00
Difference :
PhP
Percentage increase: _____
3. Conduct of Barangay Monitor report on the Barangay Secretary Conducted Barangay 4 4 4 MINUTES /
Assembly for the first and compliance of the Assembly : ATTENDANCE
second semester of CY 2022 barangays to conduct 1st Semester = 2 DOCUMENTATIONS
barangay assembly to be 2nd Semester = 2
submitted thru shared No Data = 0
google drive
TOTAL 20 18 20
EXECUTIVE
ORDER
BDRRM PLAN
LISTO
PLAN
NOTICE OF
THE
MEETING
MINUTES
INDICATORS DATA REQUIREMENTS DATA SOURCE HOW TO ASSIGNED PASSING SCORE DOCUMENT
DETERMINE THE SCORE SCORE OBTAINED BY SUBMITTED
SCORE THE
BARANGAY
Utilization Report Utilization of the 70% 1 1 1 AIP / BUDGET
BDRRM Fund
50% and above = 1
Less than 50% = 0.5
• No = 0
• No data = 0
2. Accomplishment rate of the • Approved BDRRM Barangay Rate ofAccomplishment: 3 2 3 AIP / BUDGET
activities/projects reflected Plan Secretary • 60% and above = 3
in the • Accomplishment • 40 – 59% = 2
Barangay Disaster Risk Report • 20 – 39% = 1
Local Disaster Risk
Reduction and • 19% and Below = 0
How to compute? Reduction
Management (BDRRM) • No BDRRM Plan = 0
and Management
Plan or similar plan Officer
Accomplishment rate = (LDRRMO)
o A = Total number of
activities/projects
accomplished in the
BDRRM plan
o B= Total number of
activities/projects in
the BDRRM Plan
3. Extent of risk assessment Post activity report of the Barangay Conducted drills 1 1 1
and Early Warning System drills conducted Secretary • Earthquake/Fire/
(EWS) (Earthquake, fire, etc.) Others = 1 DRILL/
Local Disaster Risk • No = 0 DOCUMENTATION
Date of drill/s conducted: Reduction SEMINARS
_____________________ and Management With Post-Activity Report: 1 1
______ Officer 1
• Yes = 1
(LDRRMO) • No = 0
TOTAL 20 17 19
INDICATORS DATA REQUIREMENTS DATA SOURCE HOW TO ASSIGNED PASSING SCORE DOCUMENT
DETERMINE THE SCORE SCORE OBTAINED SUBMITTED
SCORE BY THE
BARANGAY
1. Functionality of the Functionality of the Barangay If the result is: 1 1 1 EXECUTIVE
Violence Against Violence Against Women Secretary • Ideal = 1 ORDER
Women (VAW) Desk (VAW) Desk based on • Mature = 0.5
MC No. 2017-114 dated Local Social • Basic
30 August 2017 Welfare and Progressive = 0.25
Development • No Functionality
Officer =0
VAWC Cases Quarterly Submission of 2 1 2 QUARTERLY
Reports Quarterly Reports on REPORT TO
• 1st Qtr submitted: VAWC Cases DILG
MARCH 2022 • 1st Qtr report submission DSWD
• 2nd Qtr submitted: = 0.5
JUNE 2022 • 2nd Qtr report
• 3rd Qtr submitted: submission = 0.5
SEPTEMBER 2022 • 3rd Qtr report submission
= 0.5
• 4th Qtr submitted:
DECEMBER 2022 • 4th Qtr report submission
= 0.5
Certificate of VAW Desk Person is 1 1 1 CERTIFICATE
Attendance/Participation trained DOCUMENTATION
and Date of Yes = 1
Training/Seminar No = 0
____________
6. Functionality of Barangay DILG MC No. 2008-126 Barangay If the result is : 1 1 1 EXECUTIVE ORDER
Council for the LCPC Form 1-A Secretary Ideal = 1 MEETINGS
Protection of Children Mature = 0.5 DOCUMENTATION
(BCPC)
Basic –
Progressive = 0.5
No
Functionalty = 0
7. Allocation for the Annual PCW , DILG, DBM and Barangay With approved Barangay 1 1 1 AIP/BRGY. BUDGET
Gender and Development NEDA JMC No. 2016-01 Secretary Annual Plan and Budget
( GAD) Plan and Budget Annex D-1 Yes = 1
No = 0
TOTAL 15 13 15
SEAL OF GOOD LOCAL GOVERNANCE FOR BARANGAY
Assessment Period: CY 2022
Data Capture Form
INDICATORS DATA REQUIREMENTS DATA SOURCE HOW TO ASSIGNED PASSING SCORE DOCUMENT
DETERMINE THE SCORE SCORE OBTAINED BY SUBMITTED
SCORE THE
BARANGAY
1. Enactment of Barangay Tax Barangay Tax Ordinance Barangay Presence of Barangay Tax 5 5
Ordinance Secretary Ordinance:
• Yes = 5
Barangay • No = 0
Treasurer
2. Issuance of Barangay Record book Barangay Timeliness of issuance of 10 8
Clearance Treasurer barangay clearance (within
7 working days):
• 90%-100% of
applications met = 10
• 80%-89% of
applications met = 8
• 70%-79% of
applications met = 6
• 60%-69% of
applications met = 4
• 50%-59% of
applications met = 2
• 49% below of
applications met = 0
TOTAL 15 13
INDICATORS DATA REQUIREMENTS DATA SOURCE HOW TO ASSIGNED PASSING SCORE DOCUMENT
DETERMINE THE SCORE SCORE OBTAINED BY SUBMITTED
SCORE THE
BARANGAY
1. Presence of a Materials • MRF (check the Onsite inspection Presence of MRF: 3 2
Recovery Facility corresponding answer) • Yes = 3
(MRF) pursuant to R.A. ____ Barangay owned • None but with other
9003 ____ Clustered Brgys materials recovery
scheme = 2
• None = 0
• Location of MRF
• MOA
____________________________________
Chairperson
____________________________________
Vice-Chairperson
____________________________________
Member
____________________________________
Member