Report On

Reinforcement Scanning Work Of


Saidpur Airport.

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Dear Sir,
We are enclosing the NDT reports for the scanning work that has been performed at your site

The scans have been done using PS250 details are mentioned below:

PS250 Scans:

1. Please note that the dimensions per scan is maximum 600mm X 600mm (1 scan)
2. The scan will give an estimate of the following parameters:
 Rebar Layout.
 Rebar Dia.
 Rebar Spacing.
 Others
3. The Scan surface should be as smooth as possible for optimal results.

Operating range Depends on scan mode, rebar spacing and diameter.


Position / diameter:
to resolve single bars min. spacing 36mm or spacing : coverage (s:c) = min. 2 : 1
whichever is greater.
Depth:
Min. depth 10 mm for depth reading.
Depth: depends on scan mode, rebar spacing and diameter.

Typical accuracy Bar diameter: ±1 standard diameter (s:c ≥ 2:1)(Up to 60mm depth)
Bar location: bar center ±3mm / ±1in (s:c ≥ 1.5:1).

4. There should not be any ferrous material/pipes nearby at a distance of at least 30mm which can cause a deviation in the
magnetic waves.
5. Results are mentioned, however scans were not clear for accurate estimation of diameter

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Project Name: Saidpur Airport.

Project Address: Saidpur, Nilphamari, Bangladesh.

Scanner Operate By:


Md. Al-amin
Specification Engineer
RE-Tech Associates

Report Checked By:


Engr. Biprojit Hore
Technical Director
RE-Tech Associates
Call: +8801714545272

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
LETTER OF DECLARATION

We do hereby declare that this report is prepared based on the scanning data from different location in the structure
as suggested by the engineer/consultant using Hilti PS 200 under the guidance and supervision of us. We will be
responsible for rationality and verification of any data presented in this report based on scanning only. While scanning
and analyzing, civil engineering knowledge and judgment was applied where necessary.

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Image of Used Apparatus

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: Corner Column (06-20Ømm)
 Location: Ground Floor Ring: Ø10 mm @ 9.51” c/c
 Ferro scanning no.- 01

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: Corner Column (06-20Ømm)
 Location: Ground Floor Ring: Ø10 mm @ 10.0” c/c
 Ferro scanning no.- 02

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Slab (Bottom)  Main Reinforcement:
 Member Type: Mid Slab X direction: Ø10 mm @ 5.4” c/c (Average)
 Location: Ground Floor
Y direction: Ø10 mm @ 5.91” c/c (Average)
 Ferro scanning no.- 03

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: Corner Column (06-20Ømm)
 Location: Ground Floor Ring: Ø10 mm @ 9.91” c/c
 Ferro scanning no.- 04

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Beam  Main Reinforcement:
 Member Type: Beam Top (03-16Ømm)
 Location: 1st Floor Remarks: Beam top from slab.
 Ferro scanning no.- 05

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Beam  Main Reinforcement:
 Member Type: Mid Beam (02-20Ømm)
 Location: 1st Floor Ring: Ø10 mm @ 9.20” c/c
 Ferro scanning no.- 06 Remarks: Extra clear covering.

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019
Member Details: Finding & Remarks:
 Member: Slab  Main Reinforcement:
 Member Type: Slab Top X direction: Ø10 mm @ 3.27” c/c (Average)
 Location: 1st Floor
Y direction: Ø10 mm @ 3.64” c/c (Average)
 Ferro scanning no.- 07

This report is prepared based on images can and quick scan only.
Date of reporting: September 2019