5. Which views in the material master are valid for all organizational units?
(More than one correct answer is correct.)
A. Basic data 1 and sales data
B. Basic data 2
C. Accounting and MRP 1
D. Sales and purchasing view
E. Basic data 1 and 2
6. An organizational unit facilitating differentiation between the various stocks of a material
within a plant ?
(Only one answer is correct.)
A. Shipping point
B. Storage location
C. Transportation planning point
D. Shipping condition
E. Plant
7. When you enter a sales order you don’t need to specify the sales area immediately. If you
don’t, where does the system automatically derive the sales area?
(Only one answer is correct.)
A. Material master
B. Customer master
C. Implementation guide (IMG)
D. Customer-material info record
E. Condition record
8. When you are creating a sales order, the system tries to determine the plant from several
sources. When checking the customer master data, which partner function does the system
check for plant determination?
(Only one answer is correct.)
A. Sold-to party
B. Ship-to party
C. Payer
D. Bill-to party
9. What part of the company is responsible for the type of shipping, the necessary shipping
materials and the means of transport?
(Only one answer is correct.)
A. Sales Organization
B. Transportation planning point
C. Shipping condition
D. Shipping point
E. Warehouse
10. Which of the following statements about organizational structures are correct?
(More than one correct answer is correct.)
A. Relationship between sales organization & plants: 1 to Many
B. Relationship bet. sales organization & company code = Many to Many
C. Relationship between plant & company code: Many to 1
D. Relationship bet. sales organization & company codes: Many to 1
E. Relationship bet. plant & shipping point: many to many
11. Which of the following statements are true about Sales Organization?
(More than one correct answer is correct.)
A. Assigned to only one company code
B. Assigned to one or more plants
C. Provides a general structure for the distribution of goods
D. Responsible for product liability and other customer rights of recourse
E. In the SD module, the use of this organizational unit is optional
16. Which of the following forms part of the scope of availability check?
(More than one correct answer is correct.)
A. Safety stock
B. Blocked stock
C. Replenishment leadtime
D. Transportation planning leadtime
E. Transit time
17. When system checks for material availability, which of the following does it consider?
(More than one correct answer is correct.)
A. Reservations False
B. Planned orders False
C. Replenishment leadtime False
D. Transportation planning time False
E. Loading time
18. In availability check, what enterprise structure does the system use as basis?
(Only one answer is correct.)
A. Shipping point
B. Plant
C. Company code
D. Sales organization
E. Distribution channel
19. During order entry, which of the following about scheduling are true?
(More than one correct answer is correct.)
A. System does a forward scheduling if backward scheduling is not configured (mark
“blank” on configuration)
B. System does not do a forward scheduling if replenishment leadtime is set up
C. System does a forward scheduling if material availability date is in the past
D. Scheduling can be turned off by configuring it per sales item category
E. System does a forward scheduling if backward scheduling is configured (mark “X” on
configuration)
20. During order entry, which of the following about scheduling are true?
(More than one correct answer is correct.)
A. In scheduling, the system considers the transit time from the route earlier determined
B. The system considers the replenishment leadtime from the shipping point
C. Delivery scheduling can be turned off per sales document type
D. Pick / pack time refers to the lead times taken from the shipping point
E. Transportation planning lead time is taken from the route as well as the shipping point
22. When creating sales orders, which of the following statements apply?
(More than one correct answer is correct.)
A. Every order is clearly assigned to a sales area
B. Data at header level always applies to all items.
C. A delivery block can be set at schedule line level.
D. During order entry you can also work with the individual material numbers from the
ordering party
E. Data which is determined automatically during order entry from the customer or
material master record cannot be changed manually.
23. Shipping point can be determined automatically using which of the following?
(More than one correct answer is correct.)
A. Sales document type
B. Storage condition
C. Plant
D. Transportation group
E. Material master
28. To be able to create the delivery from a sales order, you need the following organisation unit
to be specified in the order?
(Only one answer is correct.)
A. Plant
B. Distribution channel
C. Shipping point
D. Sales organisation
E. Company code