STORAGE OF RAW MATERIALS/COMPONENTS/ACCESSORIES

STANDARD OPERATING PROCEDURE

1. Receive the materials as per the specification in PO


along with DC
2. Check the quantity
3. Check the quality of the received material
4. Once the quality check is over, then make GRN
entry
5. Once GRN is made, then prepare the BIN card and
store the material in the Racks/Pallets
6. The materials should not be stored without BIN card
7. The materials should always store in Pallets or
Racks
8. The materials should not touch the wall directly
9. The materials should be covered for safe and avoid
dust

PREPARED BY APPROVED BY