This document outlines the process for receiving and storing materials at a store. It involves unloading materials from trucks, inspecting and testing shipments against documentation, storing materials in designated areas, preparing materials for production based on plans, issuing materials on an hourly basis to production areas, and preparing finished goods for shipment. Key steps include unloading, inspecting, testing, storing, reserving, and issuing materials, as well as preparing finished goods for shipment.
This document outlines the process for receiving and storing materials at a store. It involves unloading materials from trucks, inspecting and testing shipments against documentation, storing materials in designated areas, preparing materials for production based on plans, issuing materials on an hourly basis to production areas, and preparing finished goods for shipment. Key steps include unloading, inspecting, testing, storing, reserving, and issuing materials, as well as preparing finished goods for shipment.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
This document outlines the process for receiving and storing materials at a store. It involves unloading materials from trucks, inspecting and testing shipments against documentation, storing materials in designated areas, preparing materials for production based on plans, issuing materials on an hourly basis to production areas, and preparing finished goods for shipment. Key steps include unloading, inspecting, testing, storing, reserving, and issuing materials, as well as preparing finished goods for shipment.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
1 Truck arrives at the unit 2 The MM in charge goes down to the truck 3 Material is unloaded 4 Material checked against the packing list and the invoice 5 Send Invoice to security for sealing Sealing should be done at the arrival of RM
6 Material is loaded to a trolley
7 Material moved to the lift 8 Material moved to the inward area from the lift 9 Unloading from the trolley 10 Collect Invoice from security Sealing should be done at the arrival of RM
11 Random checking of the quantity by referring the BOM Reduce checking time by setting standards of checking
12 Material waiting for inspection in the inward area
13 Inspecting the material (Assortment according to the grades) 14 Counting/ physically checking the material Reduce time by standardising the counting qty according to lot size 15 The material is then moved to the testing area Rreduce movement by reducing distance 16 In-house Tests are performed and 10% of the material is sent to CLRI 17 Waiting till the test reports are prepared Authentic test reports should be requested from the supplier 18 Variations in the material to be reported to CIL 19 The Goods receipt note is prepared 20 Prepare DC for Leather Re-measurement 21 10 % Leather to sent for Re-measurement 22 Receipt of Re-measurement leather 20 Prepare DC for Leather Re-measurement 21 10 % Leather to sent for Re-measurement 22 Receipt of Re-measurement leather 23 DCM variations to be reported 24 Store Material as per the BOM qty in racks 25 Place sticker according to customers 26 Receipt of Production Plan 27 Check details in production plan 28 Prepare bundles of raw material according to the carton/ issuable lot size 29 Reserve materials according to planned lot size 30 Move Leather to the respective rack 31 Consumption trial run (leather cutting) 32 Waiting for coach inspector Coach inspector should be intimated 2 days prior to specified date
33 Verification of consumption, leather defects by coach inspector
34 Approval by inspector 35 Making approval and the acceptable standards chart 36 Prepare the job card and the kanban racks according to the production plan 37 Every hour requirement checked (The material is issued on receipt of the FG) 38 Material is issued and FG is collected cell wise based on job card 39 Material moves to FG area 39 Material handler walks to reservation area 40 Picks up the material and issues it using the job card every hour 41 Walks to the cell 42 Delivers the material 43 Come back to the store 44 Update the RM issue register and the FG Received register 45 Maintain Stock of FG 46 Request for the bar code stickers from MWC 5 day in advance 47 Receive the bar code stickers 48 Stick bar code stickers to the cartons 49 Provide atleast 80% of the shipment qty to buyer for AQL audit 50 Receive Packing List from MWC 51 Preparing the DC and Invoice 52 Security verification 53 Loading of the cartons on the trolley 54 Move the trolley to the ground floor 55 Loading FG Cartons in truck for shipment 56 Sealing the cartons