LOGISTICS HANDBOOK
DOCUMENT CONTROL
Manual Number: 02
Title of Holder: Office
Issue Date: 17th November 2020
Last Revision Date: 19th March 2020
Authorized By: Director
2
VERSION 2
INDEX
DESCRIPTION PAGE NO.
REVISION SHEET..........................................................................02
OBJECTIVE..................................................................................04
3
VERSION 2
OBJECTIVE
4
VERSION 2
CHAPTER 1:
CONTAINER SHIPMENT
VERSION 2
Deal Concluded
6
VERSION 2
Appoint Custom
CHA to arrange trucks & coordinate
House Agent
with the transporters
(CHA)
Train/Road
7
VERSION 2
- Loading of the containers on the ship (Usually 5 days after GATE IN)
- Generation of Ocean Bill of Lading
9
VERSION 2
Import party’s CHA shall arrange all the clearance, import duties,
documents (Usually takes 7 days)
NOTE – After discharge of cargo, the empty containers are returned to EMPTY YARD. This has
to be done within the Free Days Allowed. Usually 14 Free Days are Allowed i.e. from time
container is discharged from ship, till empty container returned.
10
VERSION 2
Procurement of Cargo
11
VERSION 2
12
VERSION 2
13
VERSION 2
14
VERSION 2
15
VERSION 2
16
VERSION 2
17
VERSION 2
CHAPTER 2:
BREAK-BULK SHIPMENT
VERSION 2
Deal Concluded
19
VERSION 2
Trucks Rake
Train/Road
Port
20
VERSION 2
Opt 1: Stevedore to
reserve space at
Direct Loading
self-owned/leased
of cargo to the Trucks reach the warehouse at stock
barge, in case warehouse (WH) (either in management
cargo directly the port area or other charges
reaches the jetty rented godowns nearby) Opt 2: Exporter can
instead of WH
rent warehouse
space on a per sq. ft.
per month basis
21
VERSION 2
The surveyor to
keep the tally of
bags/cargo
Transportation of the unloaded at the
cargo to the Jetty WH, loaded from
the WH to leave
for Jetty, unloaded
at the barge and
loaded on the
Cargo is unloaded vessel hold
at the barge & the barges
leave the shore to the
anchorage point of the
operating vessel
22
VERSION 2
23
VERSION 2
24
VERSION 2
Break-bulk Shipment :
25
VERSION 2
Barge Loading
26
VERSION 2
27
VERSION 2
28
VERSION 2
DOCUMENTS INVOLVED IN
SHIPMENT
VERSION 2
CONTRACT SAMPLE
30
VERSION 2
31
VERSION 2
32
VERSION 2
33
VERSION 2
WEIGH-BRIDGE SLIPS
34
VERSION 2
INSURANCE SAMPLE
35
VERSION 2
36
VERSION 2
INVOICE SAMPLE
37
VERSION 2
38
VERSION 2
BILL OF LADING
39
VERSION 2
40
VERSION 2
PHYTOSANITARY CERTIFICATE
41
VERSION 2
CERTIFICATE OF ORIGIN
42
VERSION 2
FUMIGATION CERTIFICATE
43
VERSION 2
44
VERSION 2
45
VERSION 2
46
VERSION 2
CERTIFICATE OF WEIGHT
47
VERSION 2
48
VERSION 2
CERTIFICATE OF QUALITY
49
VERSION 2
50
VERSION 2
MATE RECEIPT
51
VERSION 2
52
VERSION 2
53