You are on page 1of 2

Annex 4: Engineer Performance Evaluation Sheet

Engineer Performance Evaluation Sheet

SUBCONTRACTOR  EUNATEL NIGERIA LTD

Engineer Name OMAKOR SAMUEL

Engineer Dispatching PO No.  S2NG2020060501WBF1-7

Dispatching Dispatching Total work


Start End days

Scores on the Performance of the Dispatched Engineer

Designated
Score Remark
No. Scoring Item Score

1 Scenario analysis 20  

Communication &
2 20  
Cooperative

3 Adjust the antenna 50  

4 Complaint DT 10  

Deduction score
5 Compliance
(-100,0)

Deduction score
6 Information
(-100,0)

Total Score:

CONTRACTOR Line Date
Manager Signature

You might also like