PPE’s (Clothing Fire Resistive Work Shirt, Rubber gloves, Rubber Boot, Face Shield / Hard Hat
6.01 A
/ Hood and clear class inside the building.
Power Discharge Arc Flash Push and Pull stick must be available and it shall be made of wood
6.02 A
or fiber glass
ID Card system for the visitor to be provided and implemented prior to pre-commissioning and
6.03 A
commissioning.
Permanent Safety Signage as per PCH new specification is Missing some area, need to be
6.04 B
provided as per Drawing, including Switchyard and Transformer Area.
Fire Extinguisher Box require to be Fix on the Ground at All areas inside & outside the
6.07 B
Building
6.8 Test Report of Smoke Detector & Fire Alarm System to be provided. A
Appropriate signage “DANGER—HIGH VOLTAGE” need to be provide on the Fence at Cellar under
6.9 B
the Substation building. and Switchyard & Transformer area.
Housekeeping on the ground surface in Cable Cellar area observed very bad condition which need
6.11 B
to be Clean up properly.
Eyewash station to be functional in the Battery Room with sufficient Water provided, and
6.12 B
surplus material need to be remove from the Battery Room.
Only One Small size Key Box has been provided need to be arrange proper LOTO Station, which
6.13 need to be accommodate all Keys and adequate Pad lock and Tags must be available prior to Pre- B
Commissioning.
First Aid Sticker has been provided But missing First Aid Kit need to be provided at All the
6.14 B
Building Rooms with relevant Materials
Cable Tray & cable entry Point require to be shield properly inside Building All the opening
6.15 B
Point.
In the First Floor All Main Door (Entrance to the Building Both side) shall have the Safety
6.16 B
Bar to open the Door from In-side in case of Emergency
Fire Extinguisher Instruction and operation Manual require to be posted on each Fire
6.17 B
Extinguisher Point area.
Deficiency of Fire Extinguisher Cabinet are missing inside LV Switchgear Room require to be
6.18 arrange and Missing of Fire Extinguisher inside Air Lock Room need to be verify & arrange as B
per Approved Drawing is essential.
As per Approved Drawing the Quantity of Fire Extinguisher need to be verify and provided as
6.19 B
per Drawing with sufficient number and Type of Fire Extinguisher.
Emergency Exit / Escape Route Light are Not provided it must be arrange as per Approved
6.21 B
Drawing.
Unwanted materials inside the substation and its rooms should be removed, and the entire area
6.22 should be cleaned and tidied up. A