Date: 27 April 2023

OBSERVATION REPORT

Project: Ohana polystyrene manufacturing @ ICAD III


Project ID: B1N-2022-002721
Plot No; 93SR44, Sector ICAD III
Date: 27 April 2023

S.No DESCRIPTION LOCATION PHOTOS


1. Finishing Pump Room
Required

2. Finishing Pump Room


Required

3. Finishing Pump Room


Required

4. Paint Boundary wall


Finishing
Required
Date: 27 April 2023

5. Finishing Fire water tank


Required

6. Finishing Domestic tank


Required

7. Finishing Window near boiler


Required room
Date: 27 April 2023

8. Concrete Boiler Room


Finishing
Required

9. Concrete Boiler Room


Finishing
Required

10. Paint finishing Corridor near GF


required toilet
Date: 27 April 2023

11. Filling Prayer room


required

12. Finishing Canopy Foundation


Required

13. Finishing Canopy foundation


Required
Date: 27 April 2023

14. Paint finishing Ground floor


required Corridor

15. Paint finishing First Floor Corridor


required

16. Paint finishing Roof floor staircase


required landing area
Date: 27 April 2023

17. Paint finishing Roof floor staircase


required landing area

18. Filling Parapet wall


required

19. Filling Roof Floor


required
Date: 27 April 2023

20. Filling Parapet wall


required

21. Paint finishing Roof Floor


required

22. Filling Roof Floor


required
Date: 27 April 2023

23. Finishing Roof Floor


Required

24. Paint finishing Guard Room


required

25. Finishing Warehouse area


Required
Date: 27 April 2023

26. Filling required Warehouse Area

27. Filling required Backside of


warehouse

28. Filling Warehouse Area


required
Date: 27 April 2023

29. Cable pulling Warehouse Area


and concrete
work required

30. Paint finishing Warehouse Area


required

31. Finishing Warehouse Area


Required
Date: 27 April 2023

32. Finishing Loading Area


Required

33. Finishing Loading Area


Required

34. Block work Loading Area


Filling
required
Date: 27 April 2023

35. Filling Work station Work


required station