Logbook A PROPOSED TWO-STOREY CONTAINER VAN OFFICE
PROJECT NAME: A PROPOSED TWO-STOREY CONTAINER VAN OFFICE
PROJECT LOCATION:
OWNER:
NOVEMBER 16, 2021
Ground Breaking Site clearing NOVEMBER 16, 17, 18, 19, 2021 Lay out of Comfort room Construction of comfort room at the back. Cutting of Container Van NOVEMBER 20, 22, 23, 2021 Welding of steel frames for window opening NOVEMBER 24, 25, 26, 27, 29, 30, 2021 Erection of steel columns for second floor Installation of electrical rough ins Concrete pouring of floor slab on ground floor DECEMBER 1, 2, 3, 2021 Welding of steel beams for second floor DECEMBER 4, 6, 7, 2021 Welding of Steel trusses for second floor DECEMBER 8, 9, 10, 2021 Installation of Roof and spandrels DECEMBER 11, 13, 14, 15, 16, 17, 18, 2021 Construction of steel stairs Concrete pouring of floor slab on second floor DECEMBER 20, 21, 22, 23, 2021 Production and Installation of aluminum frames and glass window DECEMBER 24-25, 2021 Christmas Holiday DECEMBER 27,28, 29, 30, 2021 Construction of interior walls on ground floor DECEMBER 31, 2021- JANUARY 1, 2022 New Year JANUARY 3, 4, 5, 2022 Welding of Steel Canopy Construction of interior walls on ground floor JANUARY 6, 7, 8, 2022 Ceiling works on ground floor Tiling works on ground floor Painting Works exterior JANUARY 10, 11, 12, 13, 14, 15, 2022 Ceiling works on second floor Tiling works on second floor Continuation of painting works interior and exterior Installation of polycarbonate roof on canopy. Carpentry works. JANUARY 17,18, 19, 20, 2022 Continuation of carpentry works. Painting works interior and exterior final coat. JANUARY 21 AND 22, 2022 General cleaning. Retouching of Damaged Paints at Interior and Exterior. JANUARY 24, 2022 Turnover. Prepared By:
The Construction of the Small House: A Simple and Useful Source of Information of the Methods of Building Small American Homes, for Anyone Planning to Build