WEEKLY ACTIVITY REPORT

TRAINEE: JAY MARK S. GICALE WEEK NO.: 3


PROJECT:

“CONSTRUCTION OF FOUR-STOREY SEAIT SCHOOL BUILDING”


BRGY. CROSSING RUBBER, TUPI, SOUTH COTABATO

DATE ACTIVITY RATING


 Observing the installation of reinforcement bars for
SEPTEMBER ground floor stair
01, 2021  Observing the installation of tie wires for the top and
bottom rebar on stair
 Observing the fabrication of stair nosing
 Observing the installation of phenolic boards for
ground floor stairs
 Observing the installation of stair nose
SEPTEMBER  Observing the installation of spacers at bottom bars
02, 2021 of ground floor stair
 Observing the installation of stair beams
 Estimating the volume of cement, sand and gravel
SEPTEMBER for ground floor stair
03, 2021  Estimating the required cement bags use for
concrete mixing
 Observing the installation of ground floor stair

Comments:

APPROVED BY:

ERIC R. SANCHEZ
Project Foreman
WEEKLY ACTIVITY REPORT

TRAINEE: JAY MARK S. GICALE WEEK NO.: 4


PROJECT:

“CONSTRUCTION OF FOUR-STOREY SEAIT SCHOOL BUILDING”


BRGY. CROSSING RUBBER, TUPI, SOUTH COTABATO

DATE ACTIVITY RATING


 Observing the mixing of cement, sand, and gravel on
SEPTEMBER the concrete mixer
06, 2021  Observing the pouring of concrete for ground floor
stair
 Observing the pouring of concrete for stair beams
 Observing the drying period of the poured concrete
SEPTEMBER on stair
07, 2021  Observing the installation of scaffolds for the second
floor slab
 Observing the installation of stirrups for second
floor beams
 Observing the installation of top and bottom bars for
SEPTEMBER second floor slab
08, 2021  Observing the installation phenolic boards for
second floor slab
 Checking the spacing of reinforcement bars for slab
 Observing the installation of spacers for second
SEPTEMBER floor slab
10, 2021  Observing the installation of electrical wirings on
the slab
 Observing the splicing of steel bars for beams and
slabs

Comments:

APPROVED BY:

ERIC R. SANCHEZ
Project Foreman
WEEKLY ACTIVITY REPORT

TRAINEE: JAY MARK S. GICALE WEEK NO.: 5


PROJECT:

“CONSTRUCTION OF FOUR-STOREY SEAIT SCHOOL BUILDING”


BRGY. CROSSING RUBBER, TUPI, SOUTH COTABATO

DATE ACTIVITY RATING


 Observing the installation of top and bottom
SEPTEMBER reinforcement bars on slab
13, 2021  Observing the installation of tie wires for slab bars
 Observing the installation phenolic boards on other
slab sections
 Observing the installation of dowels for second floor
SEPTEMBER walls
14, 2021  Observing the installation electrical wirings
 Observing the concrete pouring for second floor slab
SEPTEMBER  Observing the pouring of concrete using concrete
15, 2021 pump machine
 Observing the concrete pouring using concrete
vibrator
 Observing the levelling of poured concrete floor slab
 Observing the concrete drying period for second
SEPTEMBER floor slab
16, 2021  Observing the installation of lateral ties and hooks
for second floor columns
 Observing the installation of concrete hollow blocks
SEPTEMBER for ground floor walls
17, 2021  Observing the plastering of walls

Comments:

APPROVED BY:

ERIC R. SANCHEZ
Project Foreman