Plant Client Contract Code Document ID UAN No.

NPK PVFCCo PVFCCo-NPK PIN-EQS-7010-EC-0018 66-0194

Technical Specification
[Material Requisition for Order]
For
Rev 01 Page 10 of 11
De-Dusting Air Heater

Item 70E2002 Specification


Nº Required 1 Manufacturer
Service DEDUSTING AIR HEATER Model Finned tubes heat exchanger
1 DESIGN DATA
2 Heat exchanged (design) kcal/h 170,000 [197.71 KW]
2 2o
3 Transfer rate / finned kcal/m hºC 10.78 [0.013 KW/m C] (3)
4 LMTD ºC 85.8
2
5 Finned surface m 184 (3)
2
6 Frontal area (free pass) m 1.58 (1.25 m x 1.26 m)
7 AIR (shell)
3
8 Flow (normal / design) Am /h 7,500 - 7,600 / 8,000 // 8,000 - 9,000 kg dry air/h (5)
9 Inlet temperature (normal/design) ºC-% H.R. 18 - 36.7 ºC - 80-100% H.R. / 18ºC-100% / 30ºC-80% / 32ºC-100%
10 Outlet temperature (normal/design) ºC 90-105 / 95 for calculation
11 Pressure drop allowance mm.w.c. 25
2o
12 Fouling factor m C / W 0.0001797 m2 oC / W
13 Speed m/s 1.45
14 STEAM (tubes)
15 Flow (normal / design) kg/h 260-340 / 500
16 Inlet temperature ºC 148.0
17 Outlet temperature ºC 148.0
18 Operating pressure bar(g) 3.0
19 Pressure drop allowance bar 0..2
20 Calculated pressure drop mm.w.c.
2 2o
21 Fouling factor m hC/kcal 0.0001 [0.000086m C / W]
3
22 Density kg/m 2.16
23 Viscosity cP
24 Latent heat kcal/kg 508
25 Speed m/s
26 CONSTRUCTION (1) (3) (5)
27 WORKING DATA FINS
28 Design pressure bar(g) 10 / FV Dimensions mm Round / 57
29 Design temperature ºC 200 Pitch mm 2.82
30 Test pressure bar(g) (2) Material mm Aluminium
31 Nº of passes 1 Bond type ‘G’ Type Embeded
32 TUBES HEADERS
33 Diameter mm 25.4 Type ET
34 Wall thickness mm 2.54 Material SS316L
35 Length mm 1,250 Connection tube / tube sheet Welded
36 Nº tubes 105 Gasket material PTFE
37 Nº tubes per bundle / Nº bundles 105 / 1 Corrosion allowance 1.0 (3)
38 Nº rows per bundle 6 Inlet nozzles 2 x 2"
39 Material SS 316L Outlet nozzles 1 x 1"
40 Flanges according ANSI 150#
41
42 NOTES.-
43 (1) Design code ASME section VIII, Division 1 and API 661
44 (2) According to Design Code.
45 (3) To be confirmed by Vendor / Detail Engineering. Calculated based on 1.40 m2 of exchange surface / m linear of finned tube.
46 (4) Weight: 400 kg (empty) / 500 kg (full of water) (to be confirmed by Vendor).
47 (5) Thermal design shall be carried out considering 9000 kg/hr dry air flow rate