Working Title: Sugar Cane Bagasse Ash as Partial Sand or Cement Replacement in Non-Load Bearing Concrete
Hollow Blocks use for Masonry Works in Sapangbato, Angeles City.
WASHED SAND
B. OVEN DRIED
1. CLOCK TIME
a. Time Started 9:52 am
b. Initial Set 10:57 am
c. Final Set 11:57 am
2. TIME OF SETTING
a. Initial Set, (b) - (a) 65 minutes
b. Final Set, (c) - (a) 125 minutes
Table 2: Setting time of sample with SCBA as partial replacement of cement (5% SCBA)
1. CLOCK TIME
a. Time Started 9:52 am
b. Initial Set 10:57 am
c. Final Set 11:57 am
2. TIME OF SETTING
a. Initial Set, (b) - (a) 65 minutes
b. Final Set, (c) - (a) 125 minutes
Table 3: Setting time of sample with SCBA as partial replacement of cement (10% SCBA)
1. CLOCK TIME
a. Time Started 10:36 am
b. Initial Set 11:41 am
c. Final Set 12:32 pm
2. TIME OF SETTING
a. Initial Set, (b) - (a) 65 minutes
b. Final Set, (c) - (a) 116 minutes
Table 4: Setting time of sample with SCBA as partial replacement of cement (15% SCBA)
1. CLOCK TIME
a. Time Started 10:36 am
b. Initial Set 11:46 am
c. Final Set 12:45 am
2. TIME OF SETTING
a. Initial Set, (b) - (a) 70 minutes
b. Final Set, (c) - (a) 129 minutes
Design Mix
MATERIALS
28.8 144.2 0 16
Table 7: Design mix quantity of CHB with SCBA as partial replacement of cement
MATERIALS
Percentage of SCBA Cement (kg) Sand (kg) SCBA (kg) Water (kg)
Table 8: Design mix quantity of CHB with SCBA as partial replacement of sand
MATERIALS
Percentage of SCBA Cement (kg) Sand (kg) SCBA (kg) Water (kg)
20% 28.8 115.36 28.84 16
0 2
5 2
10 2
15 2
Table 10: Compressive Strength of CHB with SCBA as partial replacement of sand
0 2
20 2
30 2
40 2
Table 11. Compositions of Waste Materials that can be partially replace to Cement