The document provides a list of materials, quantities, and costs for an awning project including tubular frames, panels, glass, handles, and other components. The total cost of materials is ₱1,197.66 and additional costs for labor at 30% and markup at 20% bring the total charge to ₱1,796.49 with an estimated profit of ₱239.53.
The document provides a list of materials, quantities, and costs for an awning project including tubular frames, panels, glass, handles, and other components. The total cost of materials is ₱1,197.66 and additional costs for labor at 30% and markup at 20% bring the total charge to ₱1,796.49 with an estimated profit of ₱239.53.
The document provides a list of materials, quantities, and costs for an awning project including tubular frames, panels, glass, handles, and other components. The total cost of materials is ₱1,197.66 and additional costs for labor at 30% and markup at 20% bring the total charge to ₱1,796.49 with an estimated profit of ₱239.53.
PERIMETER 2.4 m. x ₱66.67 = ₱160.00 PANEL 2.4 m. x ₱92.86 = ₱222.86 S. MOULDING 2.4 m. x ₱33.33 = ₱80.00 1/4 thk. GLASS 4 ft2 x ₱44.00 = ₱176.00 FOREBAR 12" 2 pcs. x ₱55.00 = ₱110.00 CAM HANDLE 1 pcs. x ₱50.00 = ₱50.00 BUBBLE RUBBER 3.6 m. x ₱8.00 = ₱28.80 SEALANT 2 pcs. x ₱135.00 = ₱270.00 CONSUMABLES 1 lot x ₱100.00 = ₱100.00 TOTAL: = ₱1,197.66 Labour 30% = ₱359.30 Mark Up 20% = ₱239.53 CHARGE = ₱1,796.49 ₱35,929.71 PROFIT = ₱239.53