Arrangement ZOT
Arrangement ZOT
Plant#1 Press
Body
Frame -TPM ED Frame 7 Hours during non prod -Set up 1 working day as non production day
-TPM Jig & Robot 2 Hours/Day -Set Time Over daily & Add MP
-CKD overtime -???
Toso -Prep prod 30 minutes before start - Arrange start-Stop Production (7.45-15.00)
-PGD Toso Overtime - Provide 3 Shift operation to support ZOT
Inspection
Toso ‘- TPM & maint day 7hrs when weekend ‘- Set up working day(Monday) as NPD for TPM ti
-Prep prod 30 minutes before start - Arrange start-Stop Production (7.45-15.00)
‘- when teiji, top coat & repair almost OT ‘- Set up 2 Shift operation to support ZOT
Assy -WIP Fill in
Inspection Repair
Logistic
Confidential (Draft)