You are on page 1of 7

PT DAGO ENERGI NUSANTARA

TIME SHEET BULANAN KARYAWAN (26 Mar 2022 sd 22 Apr 2022)

Nama Muchamad Luthfi Ali


Nomor Karyawan 3204370709960001
Periode Mulai 26-Mar-2022
Periode Akhir 22-Apr-2022
Jumlah hari Kerja 0

Hari Tanggal Kode Proyek A

Senin 28 Mar 20 3-200-306 Preparation and Meeting with External Team


Selasa 29 Mar 20 4-259 6.c Initial Development of methodology and calculation sheet level-2
Selasa 29 Mar 20 4-298 Calculate Anode Remaining Life
Rabu 30 Mar 20 4-298 Calculate Anode Remaining Life
kamis 31 Mar 20 4-298 Calculate Anode Remaining Life
Jumat 01 Apr 2021-600 Kebersamaan
Senin 04 Apr 2023-200-306 Calculate Impact Energy for 3 Impact Scenarios (Buried (Bucket Impact); Internal V
Senin 04 Apr 2023-200-306 Calculate Impact Energy for 3 Impact Scenarios (Buried (Bucket Impact); Internal V
Selasa 05 Apr 2023-200-306 Calculate Impact Energy for 3 Impact Scenarios (Buried (Bucket Impact); Internal V
Selasa 05 Apr 2024-259 6.c Initial Development of methodology and calculation sheet level-2
Rabu 06 Apr 2023-200-306 Calculate Impact Energy and Failure Frequencies
kamis 07 Apr 2024-259 6.c Initial Development of methodology and calculation sheet level-2
kamis 07 Apr 2023-200-306 Calculate Failure Frequency
Jumat 08 Apr 2024-259 6.c Initial Development of methodology and calculation sheet level-2
Senin 11 Apr 2023-200-306 Calculate Failure Frequency for 12, 20, 24, 42 inch PHM's Pipeline
Selasa 12 Apr 2023-200-306 Calculate Failure Frequency for HDD Construction Type
Rabu 13 Apr 2023-200-306 External Meeting
Rabu 13 Apr 2024-259 6.c Initial Development of methodology and calculation sheet level-2
kamis 14 Apr 2023-200-306 External Meeting (Progress Meeting 50%)
kamis 14 Apr 2024-259 6.c Initial Development of methodology and calculation sheet level-2
Senin 18 Apr 2024-259 6.c Initial Development of methodology and calculation sheet level-2
Senin 18 Apr 2023-200-306 Create Draft Final Report
Selasa 19 Apr 2023-200-306 Create Draft Final Report
Rabu 20 Apr 2023-200-306 Re-Calculate for PHM's pipeline, Update Draft Final Report, Meeting Coordination

Jumlah Jam Kerja Per


Kode Proyek Nama Proyek
Proyek (dalam Jam)
3-200-306 Risk Assessment Pembangunan 0
4-298 Jasa Konsultan FEED TLPG Kola 0
4-259 RBI Assessment and Implementa 0
1-600 Support/Overhead 0
Total 0
Catatan :
1. Kode dan Nama Proyek diisi sesuai dengan list yang disiapkan oleh Fungsi Keuangan yang bisa dilihat pada papan
2. Aktifitas diisi kegiatan spesifik dari proyek yang sedang dijalankan
3. Setiap aktifitas di paraf oleh Sr. Drafter/PM/Sr.PM setiap hari
4. Sakit harus disertai surat keterangan sakit dari pihak yang berwenang
5. Cuti dari jatah hari cuti yang diketahui PM/Sr. Pm dan disetujui DIC
6. Alpha adalah tidak masuk kerja tanpa ijin dan/atau jumlah jatah cuti telah habis
7. Time sheet ini harus diisi oleh semua karyawan kecuali supporting staff, sekretaris dan OB/Driver dan diserahkan
8. Jika supporting staff dalam periode tersebut diinstruksikan terlibat dalam proyek, maka yang bersangkutan harus
pr 2022)

Posisi Engineer
3204370709960001 Divisi Material Engineer
15/Apr/2022
Hari ibur pada hari kerja

Aktivitas

am
nd calculation sheet level-2

narios (Buried (Bucket Impact); Internal Vehicle Impact, External Vehicle Impact
narios (Buried (Bucket Impact); Internal Vehicle Impact, External Vehicle Impact
narios (Buried (Bucket Impact); Internal Vehicle Impact, External Vehicle Impact, and Drop Object
nd calculation sheet level-2
uencies
nd calculation sheet level-2

nd calculation sheet level-2


, 42 inch PHM's Pipeline
truction Type

nd calculation sheet level-2

nd calculation sheet level-2


nd calculation sheet level-2

Draft Final Report, Meeting Coordination

Persentase Jam Kerja Jumlah Jam Kerja Per Bulan Jumlah Hari Kerja Jumlah Kerja di hari
Per Proyek (%) (Dalam Jam) (Hari) libur (Hari)
0
0
0 0 17
0
0

Prepared By Approved By
si Keuangan yang bisa dilihat pada papan pengumuman, jika tidak ada dalam list maka harus dikonfirmasikan ke fungsi Keuangan

sekretaris dan OB/Driver dan diserahkan ke fungsi HC paling lambat tgl. 27 tiap bulannya
m proyek, maka yang bersangkutan harus mengisi time sheet tersebut
Jam Mulai Jam Selesai Jam kerja Output Status

8:00 16:00 8 Clear OutpFinish


8:00 10:00 2 Revision Wo Finish
10:00 17:00 7 Collect andIn-Progress
9:30 18:00 8.5 Study RefeIn-Progress
8:00 16:00 8 Anode Rema In-Progress
8:00 11:15 3.25 - Finish
9:30 16:00 6.5 CalculationIn-Progress
20:00 21:30 1.5 CalculationIn-Progress
2. Report
t 7:35 15:00 7 3. AppendixFinish
15:00 16:00 1 Update TabIn-Progress
9:00 17:00 8 Document Finish
7:30 9:00 1.5 Update tabIn-Progress
9:00 15:45 6.75 Excel Doc Finish
9:00 18:00 8 Update tabIn-Progress
8:00 17:00 8 SpreadsheeIn-Progress
8:00 18:00 9 Document Finish
7:30 11:00 3.5 New Data Finish
11:00 15:52 4 Update TabIn-Progress
7:30 11:00 3.5 New Task Finish
11:00 15:30 4.5 Update TabIn-Progress
8:31 15:00 6 General LeFinish
15:00 17:00 2 Draft Final In-Progress
10:00 16:00 6 Draft Final In-Progress
8:00 16:00 8 Document In-Progress

Sakit (Hari) Cuti (Hari) Alpha (Hari)


onfirmasikan ke fungsi Keuangan
Keterangan Approval Summary Jam Kerja
Tgl Jumlah Jam Kerja/Hari
Mochamad Irvan Maulana 2022-03-28 8
Arin P 2022-03-29 9
Musthofa Kamal 2022-03-30 8.5
Musthofa Kamal 2022-03-31 8
Musthofa Kamal 2022-04-01 3.25
HRD 2022-04-04 8
Mochamad Irvan Maulana 2022-04-05 8
Mochamad Irvan Maulana 2022-04-06 8
Mochamad Irvan Maulana 2022-04-07 8.25
Arin P 2022-04-08 8
Mochamad Irvan Maulana 2022-04-11 8
Arin P 2022-04-12 9
Mochamad Irvan Maulana 2022-04-13 7.5
Arin P 2022-04-14 8
Mochamad Irvan Maulana 2022-04-18 8
Mochamad Irvan Maulana 2022-04-19 6
Mochamad Irvan Maulana 2022-04-20 8
Arin P
Mochamad Irvan Maulana
Arin P
Arin P

You might also like