You are on page 1of 7

PT DAGO ENERGI NUSANTARA

TIME SHEET BULANAN KARYAWAN (26 Dec 2020 sd 25 Jan 2021)

Nama Muchamad Luthfi Ali


Nomor Karyawan 3204370709960001
Periode Mulai 26-Dec-2020
Periode Akhir 25-Jan-2021
Jumlah hari Kerja 0

Hari Tanggal Kode Proyek A

Senin 28 Dec 2024-1143 Mempersiapkan report dan dokumen Admin untuk proses penagihan
Senin 28 Dec 2024-1149 Verifikasi Gap Support Segment C dan Suport load Segment E
Selasa 29 Dec 2024-1149 Review alignment sheet/long section Segment C
Rabu 30 Dec 2024-1149 Update dan revisi alignment sheet
Senin 04 Jan 2021-600 Stand by (Waiting For Revision Supreme Project) / Study PSA MBE, WWA, MBI we
Senin 04 Jan 2021-600 Update and Compile Material Selection for Flowline Pertamina EP Asset 3 Data
Selasa 05 Jan 2021-600 Stand by (Waiting For Revision Supreme Project) / Study PSA MBE, WWA well testi
Rabu 06 Jan 2023-200 Stand by (Waiting For Revision Supreme Project) / Study PSA WWA, MBI well testi
kamis 07 Jan 2023-200 Waiting For Revision Supreme Project / Modelling WWA-8 for preparation well tes
Jumat 08 Jan 2023-200 Waiting For Revision Supreme Project / Modelling MBE-6 and WWA-8 for prepara
Senin 11 Jan 2023-200 Waiting For Revision Supreme Project / Modelling Update MBE-6 for preparation w
Selasa 12 Jan 2023-200 Waiting For Revision Supreme Project / Running model MBE-6 for preparation we
Rabu 13 Jan 2023-200 Waiting For Revision Supreme Project / Running model MBE-6 and listing data nee
kamis 14 Jan 2024-1143 Membuat draft report MBE-6
kamis 14 Jan 2021-600 Study about Well Testing Method and Slug Force & Lip Pressure Calculation for Pr
Jumat 15 Jan 2024-1143 Membuat draft report MBE-6
Jumat 15 Jan 2023-200 Create Slug Force and Thrust Force Calculation for Well Test PSA Preparation at St
Senin 18 Jan 2024-1143 Optimasi Model PSA MBE-6
Selasa 19 Jan 2024-222 Optimasi Model PSA MBE-6
Selasa 19 Jan 2021-600 Waiting For Internal Revision PSA Well Test Star Energy / Study about Lip Pressure
Rabu 20 Jan 2024-222 Optimasi Model PSA MBE-6
Rabu 20 Jan 2024-222 Optimasi Model PSA MBE-6
kamis 21 Jan 2024-222 Membuat model PSA MBE-9
Jumat 22 Jan 2024-222 Membuat model PSA MBE-9
Senin 25 Jan 2024-222 Optimasi Model PSA MBE-9

Jumlah Jam Kerja Per


Kode Proyek Nama Proyek
Proyek (dalam Jam)
4-1143 PSA WWA-9 & 10, MBE-6, 8 & 9 0
4-1149 Pipe Stress Analysis for Modifi 0
1-600 Support/Overhead 0
3-200 Marketing 0
4-222 Pipe Stress Analysis for Well 0
Total 0
Catatan :
1. Kode dan Nama Proyek diisi sesuai dengan list yang disiapkan oleh Fungsi Keuangan yang bisa dilihat pada papan
2. Aktifitas diisi kegiatan spesifik dari proyek yang sedang dijalankan
3. Setiap aktifitas di paraf oleh Sr. Drafter/PM/Sr.PM setiap hari
4. Sakit harus disertai surat keterangan sakit dari pihak yang berwenang
5. Cuti dari jatah hari cuti yang diketahui PM/Sr. Pm dan disetujui DIC
6. Alpha adalah tidak masuk kerja tanpa ijin dan/atau jumlah jatah cuti telah habis
7. Time sheet ini harus diisi oleh semua karyawan kecuali supporting staff, sekretaris dan OB/Driver dan diserahkan
8. Jika supporting staff dalam periode tersebut diinstruksikan terlibat dalam proyek, maka yang bersangkutan harus
n 2021)

Posisi Engineer
3204370709960001 Divisi Material Engineer
Hari ibur pada hari kerja

Aktivitas

min untuk proses penagihan


port load Segment E
ment C

roject) / Study PSA MBE, WWA, MBI well testing Star Energy
r Flowline Pertamina EP Asset 3 Data
roject) / Study PSA MBE, WWA well testing Star Energy
roject) / Study PSA WWA, MBI well testing Star Energy
odelling WWA-8 for preparation well testing project at Star Energy
odelling MBE-6 and WWA-8 for preparation well testing project at Star Energy
odelling Update MBE-6 for preparation well testing project at Star Energy
unning model MBE-6 for preparation well testing project at Star Energy
unning model MBE-6 and listing data needed for preparation well testing project at Star Energy

ug Force & Lip Pressure Calculation for Preparation PSA Well Test Star Energy

ation for Well Test PSA Preparation at Star Energy

st Star Energy / Study about Lip Pressure on ASME B31.1

Persentase Jam Kerja Jumlah Jam Kerja Per Bulan Jumlah Hari Kerja Jumlah Kerja di hari
Per Proyek (%) (Dalam Jam) (Hari) libur (Hari)
0
0
0
0 19
0
0
0

Prepared By Approved By
si Keuangan yang bisa dilihat pada papan pengumuman, jika tidak ada dalam list maka harus dikonfirmasikan ke fungsi Keuangan

sekretaris dan OB/Driver dan diserahkan ke fungsi HC paling lambat tgl. 27 tiap bulannya
m proyek, maka yang bersangkutan harus mengisi time sheet tersebut
Jam kerja Output Status

1 PSA MBE 6, 8, 9 and WWA 8, 9 FRinish


7 Gap Support for Segment C andFinish
8 Update Alignment Sheet basedFinish
8 Gap Support Segment D Based Foinish
3 Knowledge / Document In-Progress
6 Folder / Document Finish
8 Knowledge / Document In-Progress
8 Knowledge / Document In-Progress
8 Modelling document In-Progress
8 Modelling document In-Progress
8 Modelling Document In-Progress
8 Modelling Document In-Progress
8 Modelling Document & List Da In-Progress
5.5 Document Finish
2.5 Knowledge Finish
3 Document Finish
5 Document In-Progress
8 Model and Draft Report DocumFinish
4 Draft Report Document In-Progress
4 Knowledge In-Progress
1.75 Add and Combine MBE 9 at MBIn-Progress
6.25 Draft Report MBE-6, Slug ForceFinish
8 Modelling document In-Progress
8 Modelling Document In-Progress
8 PSA Modelling MBE-9 Update In-Progress

Sakit (Hari) Cuti (Hari) Alpha (Hari)


onfirmasikan ke fungsi Keuangan
Keterangan Approval Summary Jam Kerja
Tgl Jumlah Jam Kerja/Hari
Arin P 2020-12-28 8
Arin P 2020-12-29 8
Arin P 2020-12-30 8
Arin P 2021-01-04 9
HRD 2021-01-05 8
HRD 2021-01-06 8
HRD 2021-01-07 8
Iman Rohendi 2021-01-08 8
Iman Rohendi 2021-01-11 8
Iman Rohendi 2021-01-12 8
Iman Rohendi 2021-01-13 8
Iman Rohendi 2021-01-14 8
Iman Rohendi 2021-01-15 8
Arin P 2021-01-18 8
HRD 2021-01-19 8
Arin P 2021-01-20 8
Iman Rohendi 2021-01-21 8
Arin P 2021-01-22 8
Arin P 2021-01-25 8
HRD
Arin P
Arin P
Arin P
Arin P

You might also like