MTP Main Document
MTP Main Document
After MTP
No. Action Item
1 Ensure prod access of Robotic User has been granted
2 Operational Procedure Update if needed by PDD (fully updated)
3 Hand Over Training
4 Release Package and Release Notes
5 Rx Prod Access Check
6 Finalize PDD schedule with SME
7 SME contact details
8 MAT Summary – Approval
9 Go-live Date
10 MTP Sign Off Meeting with Nestle SSC
11 Assess which workstation to schedule the robot
12 Approval of PDD schedule in BP
13 Update Processing Calendar with approved schedule and list of SMEs
14 Technical Move to Production (MTP)
15 Debug Run
16 Check with SME if Debug Run was successful as defined in PDD requirements
17 Add PDD in BP Scheduler
18 Post Go-live control file – reminder to them
19 Control Center run and Monitoring
20 Set-up BP Scheduler to be triggered automatically
Owner Target Completion Date Status
Configurator 23-05-2018 Completed
Configurator 28-05-2018 Completed