You are on page 1of 11

ecoloko corporation

O
LOK
EC
"S
T
AN ORE
D
CO
F
SH FEE
OP
"

boo
k
b o o m a rk
km s
a rk p a p e
sp r
ap e b ags
rb c
a gs o ffe
co f e t e a
fe e c
t ea ake b
ca k re
e b ad b o
rea okm
db
ook ar ks
ma p

r k s a pe r
pa p ba g
er s
ba g c o f f
sc ee
o ff tea
ee c
tea ake b
ca k re
e b ad
rea
d
Table of Contents
--------------------------------------------
ORDER: 8 05/ 27/ 2022
HOST: GROUP 5 11:11
--------------------------------------------
Cover Page 0:01
Table of Contents 0:02
Executive Summary 0:03
Project Background 0:04
Project Approach 0:05
Project Design Specification 0:06
Process and Time 0:07
Authors 0:08
--------------------------------------------
0:08
ITEM: 0:11
PAGE:

THANK YOU!

@ECOLOKORECEIPTS
s
Executive
ummary
The organization's structure project has only one floor.
This undertaking will add to the climate as this building
will be one of the organizations that will create harmless
to the ecosystem items. It will be one of the foundations
that will impressively assist with diminishing plastic
creation by various organizations. It might add to the
personal satisfaction, living in overflow in harmony, and
developing a country that the cutting edge can treasure and
esteem.

Throughout developing, the building was analyzed and


researched in an effort to identify areas that could
benefit. The objective of the venture is to develop a
building where the people participate in and work the
business endeavor in a business or modern limit the making
part; we will conceptualize the organization's structure.
The task includes the phases of development where we the
contract signing, financing, site work, and build. In
planning, it is for the presence of the structure where
laborers would agreeable work. The structure will be made to
be more advantageous where the representatives and bosses
work. The objective of the venture is to develop a business
where the people can franchise and rent the place business
endeavor in a business or modern limit. Moreover, to create
quality items to fulfill future buyers. Proposition for a
development project comprising of a one huge floor working
for the organization.

Project Background
EcoLoko Corporation is a firm founded by a group of entrepreneurs
with diverse backgrounds and skills who have come together to create
an alternative paper for the future of the environment and the next
generation. EcoLoko Corporation's Papel de Hierba Verde: Venture to
the Future is created from various grasses in the Philippines.

Papel de Hierba Verde: Venture to the Future is a product and one of


the main raw materials that is utilized for producing various
products made from grass paper, such as, Paper bag and Bookmark.
Papel de Hierba Verde's grass paper is created from a variety of
grasses that are carefully selected to meet the company's high
standards for paper quality.

Papel de Hierba Verde: Venture to the Future is a line of high-


quality grass paper products offered by the EcoLoko Corporation. On
the main branch of the company, the company also offers free product
quality testing.

The goal of this project is to form a profit organization to manage,


maintain, and operate particular Grass Paper equipment, systems, and
facilities. The corporation is also expected to qualify and be
exempted from state and federal taxes utilizing this strategy.
Project
Appr ach
o
The Beginning Phase
A gathering of individuals at a
conference table.
One of the most crucial components
of building project management is
the start phase. It includes all the
stages that must be completed before
a project can be approved and
planning may begin.

This initial design stage typically


consists of three steps:
Programming and feasibility considerations: A feasibility study
or business case is used by the planning team to establish the
project's objectives and goals. The size of the structure, how
much space will be used, and how many rooms will be required are
all decisions made at this stage. A project initiation document
(PID) is prepared once these decisions have been taken.

Designing a schematic: The team creates a sketch that depicts


the location as well as materials, colors, and textures at this
stage. This information will be utilized to research the
necessary equipment and materials during the design process.

Contract paperwork: The final designs and specifications are


contained in these documents. Those submitting bids to work on
the project will use these materials.
The Phase Before
Construction The Acquisition Stage
The next stage of a
At a computer, a project
construction project occurs
manager is working.
once the bidding process is
completed, and a contractor
The project team orders,
has been selected to
purchases, or rents all the
complete the work. The
materials, tools, and
project team is assembled
services required to finish
before they 'break ground,'
the project during this
as the industry term goes.
phase. Depending on the
The following team members
magnitude of the project,
are frequently included:
the availability of
resources, and the start
date, this stage of the
Administrator of building project might be
contracts challenging.
Project supervisor
Superintendent
Engineer-in-Charge
Manager of health and
safety

A project team prepares the construction site at this stage


before work begins. The construction site must be ready,
which may entail dealing with environmental issues such as
soil testing. The city authorities will assess all plans and
conclusions after the site examination is completed. The
project team begins gathering the manpower and resources
required for construction once the strategic plan has been
developed and the budget, design, and timeframe have been
finalized.
The Phase of
Construction
A construction site project
manager
The Closeout/Post-
This is the stage of the
project where all your
Construction Phase
planning will pay off. The
The project closure phase is
project manager, design, and
the final step in the lengthy
engineering teams have already
process of planning,
put in a lot of effort to make
constructing, and executing a
a project successful before
construction project. The
any construction begins. The
project will be finished now
contractor and subcontractors
that all the work on the job
take center stage throughout
site has been done.
the construction phase.

More than merely finishing the


The construction manager and
punch list is involved in
contractor will transfer the
project close-out. The
project into actual
project's resources are
construction as the project's
demobilized, equipment rentals
communications hub. Quality
are returned, the jobsite is
control inspections are
cleaned up, and subcontractors
performed by the architect,
who have finished their work
engineers, and project
go on to other projects.
manager, who also respond to
RFIs and examine and approve
From the perspective of
technical submittals. The
project management, this is an
first responsibility is to
excellent time to do a post-
verify that the contractor
project review, which may help
completes the project as
identify any tasks that were
planned.
left unfinished, assess any
obstacles, and compile a list
of useful insights for the
future.
Project
Design
Specification
SITE TRACE
andLEVELING
Si Survey crews, who are experts

T
in this subject, use grading
devices and laser technology.

E These tasks include tracing


regions and directing
earthworks workforce to ensure
the

that the project grades are

W fulfilled
covered by
in
the
every
scope
area
of

0
operation (substation pad,

rK
sidewalks, power meter booth,
dock yard, parking, and
driveways). This will be done
in accordance with a grading
plan that has been approved.

SITE CLEARING
Worked on the property with

machinery (bulldozer and grader)


to remove the organic topsoil.
This process also considers
natural ground ripping and
compaction in order to meet 95%
of the Proctor test when
preparing the site for
constructing pad works and the
embankment for trucks and
vehicle highways.
BUILDING PAD
The structure must be dock high.

These embankments will be made up of layers of "imported


bank material" that have been moistened and compacted to
pass the Procter compaction test by 95%. The number of
layers of "imported bank material" will be determined by the
final grading standards. The building grade is determined by
a dock height design that includes both current and future
dock sites (dock area expansion capability). Consider a
positive slope to the property line with a concrete flume
(if needed) for rainwater superficial drainage; the water
must be routed outside the property to allowed locations.

BASE - BANKMENT
A mix of fine material and grinded gravel material will be
used on the building pad, and it will be tested and
guaranteed to meet the project's requirements.
YEAR
ime 2022 - 2023

JANUARY
___ Contract Writing

FEBRUARY

___ Contract Signing

MARCH

___ Secure Financing

___
T

APRIL Secure Financing


___
and

MAY Obtain Permits


___
rocess

JUNE Obtain Permits

___

Site Work
JULY

AUGUST

___ Site Work, Plumbing

SEPTEMBER

___ Site Work, Plumbing

___
Electrical

OCTOBER Electrical, Roof



___
P

NOVEMBER Roof, Inspection

DECEMBER

___ Move -in


uthors
A

Harvey Avelino Dynese Avellana Vince Miranda


Passionate boy bestfriend Aesthetic GenChem Courageous leader that
of Tondopitpockets. Minor. Regional Representative fulfills his vision into
Project Approach that learns from her passion. Brainy yarn?
Project Design 579 mistakes. 3D Model
Specifications Executive Summary

Ely Misa Tristan Peras Chromwella Parcon


Builds his reputation as “Daddy issues are not the Blueprint of the Group.
much as he body builds reason to only love yourself Apolinario Mabini in the
himself. Gym Borta. forever, sometimes it’s your making.
Process and Time friend’s annoying love lyf.” Table of Contents
Floorplan Authors

Portfolio

Samantha Vila
Not only does she highlights
the important things but
also her whole face.
Not the favorite child.
Project Background

You might also like