Professional Documents
Culture Documents
INCIDENT DESCRIPTION
The contractor team (Al-Karrar) was conducting hot work activity ( five groups ) and they have only two Gas detectors
one of those two was not calibrated, and the Gas cylinders were not secured or inside the cage.PTW Number: DS4-
S HWN-0070978
E
C
T
I
O
N
S PRELIMINARY CAUSE(S)
E
C 1- Lack of supervision on site.
T
I
2- PA and Work Team didn't follow the ROO CoW/HSE Procedures for Hot Work activites.
O 3- Noncompliance with the Safety Rules.
N
D
IMMEDIATE ACTION TAKEN
S Work has been Stopped Immediately By myself and GCMC HSE Team Lead.
E
C
T
I
O
N
E
Stop Work Authority used for observing unsafe condition / behaviour: Yes
PICTURES
S
E
C
T
I
O
N