This production schedule outlines the tasks needed to create a podcast called "The Mythcast – Final Major Product" over several weeks from March 23rd to May 26th. It includes pre-production tasks like creating a PowerPoint and website, production tasks like recording the podcast and editing clips, and post-production tasks like ensuring documentation is on the website and writing a conclusion. All tasks are assigned start and due dates to keep the project on schedule.
This production schedule outlines the tasks needed to create a podcast called "The Mythcast – Final Major Product" over several weeks from March 23rd to May 26th. It includes pre-production tasks like creating a PowerPoint and website, production tasks like recording the podcast and editing clips, and post-production tasks like ensuring documentation is on the website and writing a conclusion. All tasks are assigned start and due dates to keep the project on schedule.
This production schedule outlines the tasks needed to create a podcast called "The Mythcast – Final Major Product" over several weeks from March 23rd to May 26th. It includes pre-production tasks like creating a PowerPoint and website, production tasks like recording the podcast and editing clips, and post-production tasks like ensuring documentation is on the website and writing a conclusion. All tasks are assigned start and due dates to keep the project on schedule.
Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:
Student Names: Lennon Woods Sheet
Production Title: The Mythcast – Final Major Product 0 of 0
DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?
Create PowerPoint explaining our Podcast and
17/03/23 Pre-Production 27/03/23 create the website for our fmp Clean up PowerPoint and set up the sponsor of 20/03/23 Pre-Production 27/03/23 choice Pitch Presentation and put recording onto our 27/03/23 Pre-Production 27/03/23 website Create Risk Assessment, assess documents to 28/03/23 Pre-Production 22/05/23 complete during the two-week break Complete Statement of Aims page on website, 29/03/23 Pre-Production 29/03/23 practice multi camera editing
18/04/23 Production Record Podcast 18/04/23
Editing compiled clips into the correct positions 21/04/23 Production 25/04/23 using Multi Camera editing Find and utilise trailers of the games as they present the key features of the game 25/04/23 Production on release, these will be used in the 25/04/23 podcast as we talk about a games release. Find and use a substantial number of clips for my 26/04/23 Production advertisement work, apply all main clips for the 03/05/23 podcast Ensure the pages of my website are to a 02/05/23 Pre-Production 24/05/23 presentable level Complete the advertisement work, upload draft 03/05/23 Production 03/05/23 onto website, finish final topic editing 05/05/23 Post-Production Ensure documentation is placed onto the website 05/05/23 Place my final format for my topic research and 09/05/23 Post-Production compiled clips onto my website to a presentable 09/05/23 standard. 10/05/23 Production Finish the main editing of the entire podcast 24/05/23 Check the entire website and ensure it is all 12/05/23 Post-Production 12/05/23 presentable and in the correct order. Have a lecturer review my podcast and apply any 16/05/23 Production 24/05/23 advice given Export Podcast and upload to the Final Piece 17/05/23 Production page, update the format of my daily reflection 17/05/23 blog page 19/05/23 Post-Production Write my Conclusion of the overall project 26/05/23 Add justification to the work on my website and 22/05/23 Post-Production discuss how each part of my work has been 24/05/23 helpful.