LEVEL 3 – FMP- Production Schedule

Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Names: Joey Tilbury Sheet

Production Title: Time freeze 1 of 1

DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?

Begin working on pre-production paperwork (as


well continuing to work on production schedule.)
17/04/2023 Pre-production 01/05/2023 n/a
Start working on the script first to have a
foundation to build the other documents on top of.
Email Ben about availability of green screen,
19/04/2023 Pre-production cameras, slow motion cameras, dollies, all used 19/04/2023 n/a
for production.
Talk with Paul and/or Trevor about how I could
20/04/2023 Pre-production incorporate 3D animation through Blender into 20\04\2023 n/a
my FMP. Talk about liquid sim.
Figure out a location/locations I would like to film
at, this can then be used in my location recce,
which will bring me closer to completing all my
25/04/2023 Pre-production 25/04/2023 n/a
pre-production documents. Also, verify my Siso
account so I am able to book out equipment for
filming which will be done the day after.
Book out necessary equipment for filming next
Monday (01/05/2023) and Friday (05/05/2023).
On Monday I will be filming scenes 1,2,3 at Poole
26/04/2023 Pre-production Park. On Friday I will be filming the scenes in the 26/04/2023 n/a
studio (making use of the greenscreen, these
cover scenes 1,2,3 since the footage filmed will
merge together)
Finish all pre-production documents so I am
28/04/2023 Pre-production ready for filming on the 1st of May (next week, 31/04/2023 n/a
Monday.)
Film outside shots of characters being pranked
by the person who can move in stopped time, I
01/05/2023 Production 01/05/2023 n/a
chose a Monday since it’s a bank holiday so I can
include friends from other schools.
Compile footage together and begin putting it in
02/05/2023 Post-production order, colour correcting, preparing it for 03/05/2023 n/a
greenscreen footage
Film footage in the studio of main character
walking about normally in stopped time. This
05/05/2023 Production 05/05/2023 n/a
footage will be incorporated with the footage shot
on 01/05/2023.
Begin editing the footage through Adobe
08/05/2023 Post-production Premiere Pro. This should take me long enough 12/05/2023 YES
that it is finished by the end of the week.
Finish the final edit and have it uploaded to
12/05/2023 Post-production YouTube, use Adobe Premiere Pro and other 16/05/2023 n/a
software if needs be.
Go over all written work to double check things
13/05/2023 Pre/Post-production 19/05/2023 n/a
like need for more detail and SPaG.
Hand in day, do final checks before final hand in
19/05/2023 Pre/Prod/Post 19/0/2023 n/a
submission time.