This document contains a production schedule for a student film project titled "Time Freeze". It includes a list of tasks to be completed for pre-production, production, and post-production, along with expected start and completion dates. Some of the key tasks include finishing the script, securing equipment and locations, filming on set, and editing footage together. The final deadline for submission is May 19th.
This document contains a production schedule for a student film project titled "Time Freeze". It includes a list of tasks to be completed for pre-production, production, and post-production, along with expected start and completion dates. Some of the key tasks include finishing the script, securing equipment and locations, filming on set, and editing footage together. The final deadline for submission is May 19th.
This document contains a production schedule for a student film project titled "Time Freeze". It includes a list of tasks to be completed for pre-production, production, and post-production, along with expected start and completion dates. Some of the key tasks include finishing the script, securing equipment and locations, filming on set, and editing footage together. The final deadline for submission is May 19th.
Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:
Student Names: Joey Tilbury Sheet
Production Title: Time freeze 1 of 1
DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?
Begin working on pre-production paperwork (as
well continuing to work on production schedule.) 17/04/2023 Pre-production 01/05/2023 n/a Start working on the script first to have a foundation to build the other documents on top of. Email Ben about availability of green screen, 19/04/2023 Pre-production cameras, slow motion cameras, dollies, all used 19/04/2023 n/a for production. Talk with Paul and/or Trevor about how I could 20/04/2023 Pre-production incorporate 3D animation through Blender into 20\04\2023 n/a my FMP. Talk about liquid sim. Figure out a location/locations I would like to film at, this can then be used in my location recce, which will bring me closer to completing all my 25/04/2023 Pre-production 25/04/2023 n/a pre-production documents. Also, verify my Siso account so I am able to book out equipment for filming which will be done the day after. Book out necessary equipment for filming next Monday (01/05/2023) and Friday (05/05/2023). On Monday I will be filming scenes 1,2,3 at Poole 26/04/2023 Pre-production Park. On Friday I will be filming the scenes in the 26/04/2023 n/a studio (making use of the greenscreen, these cover scenes 1,2,3 since the footage filmed will merge together) Finish all pre-production documents so I am 28/04/2023 Pre-production ready for filming on the 1st of May (next week, 31/04/2023 n/a Monday.) Film outside shots of characters being pranked by the person who can move in stopped time, I 01/05/2023 Production 01/05/2023 n/a chose a Monday since it’s a bank holiday so I can include friends from other schools. Compile footage together and begin putting it in 02/05/2023 Post-production order, colour correcting, preparing it for 03/05/2023 n/a greenscreen footage Film footage in the studio of main character walking about normally in stopped time. This 05/05/2023 Production 05/05/2023 n/a footage will be incorporated with the footage shot on 01/05/2023. Begin editing the footage through Adobe 08/05/2023 Post-production Premiere Pro. This should take me long enough 12/05/2023 YES that it is finished by the end of the week. Finish the final edit and have it uploaded to 12/05/2023 Post-production YouTube, use Adobe Premiere Pro and other 16/05/2023 n/a software if needs be. Go over all written work to double check things 13/05/2023 Pre/Post-production 19/05/2023 n/a like need for more detail and SPaG. Hand in day, do final checks before final hand in 19/05/2023 Pre/Prod/Post 19/0/2023 n/a submission time.