TIME TABLE

No PROSES Target Date

Asphalt Tiles

Clading

Paint
1 Material Sampel Approval 5/8/2023
Vinyl Parquet

WPC balcony

Cable NYY HY Jembo

MCU 3/15/2023

Permit Submittal 5/9/2023

2 Preparation Manpower ManPower QTY 5/8/2023

Vaksin Boster MP 5/10/2023

Training Internal 5/11/2023

Preparation Tool 5/9/2023

Preparation APD 5/9/2023


3 Preparation Material & Tools
Preparation Material support 5/9/2023

Training Internal 5/11/2023

Preparation Accesoris 5/21/2023

Preparation Electrical 5/21/2023

Preparation Plumbing 5/21/2023


4 Preparation Unit
QC before delivery 5/22/2023

Stuffing & Packing 23

Delivery unit 24
Delivery unit 24

Delivery unit to surabaya 5/26/2023

CKB to PT Amman 6/1/2023


5 Delivery

Cordination to PT. Amman PIC 6/5/2023

QC project modhouse in site PT .


6/7/2023
Amman
TABLE

Target Date FINISH REMARK

Waiting approval By PT.


5/8/2023 5/12/2023
Amman Mineral 3 0r 4 Day

3/15/2023 3/18/2023 MCU data received in 3 days

Waiting approval By PT.


5/9/2023 TBA
Amman

5/8/2023 09-052023 Check List Manpower

5/10/2023 5/10/2023 Team checks on vaccines

5/11/2023 5/11/2023 Process Training Internal

Preparation Check
5/9/2023 5/20/2023
completeness
Preparation Check
5/9/2023 5/20/2023
completeness
Preparation Check
5/9/2023 5/20/2023
completeness

5/11/2023 5/11/2023 Process Training Internal

5/21/2023 5/24/2023 Check Preparation Material

5/21/2023 5/24/2023 Check Preparation Material

5/21/2023 5/24/2023 Check Preparation Material

5/22/2023 23 Check Unit Modhouse

23 24 Proces Stuffing & Packing

24 25 Proces Delivery
24 25 Proces Delivery

5/26/2023 5/29/2023 Proces Delivery

Delays in delivery from CKB


6/1/2023 6/4/2023 can cause delays in the work
process

6/5/2023 6/6/2023 Cordination To PIC PT. Amman

6/7/2023 6/8/2023 Check Unit Modhouse in site