The document contains a production schedule for a student podcast project titled "Foods with dudes". It lists the tasks required to complete the project with start and end dates. Key tasks include PowerPoint research, surveys to finalize the logo and title, filming on location and in the studio between March and April, editing in April and May with peer feedback, and completing an evaluation by May 22nd. The schedule aims to have the podcast completed and ready for final feedback by the listed deadlines.
The document contains a production schedule for a student podcast project titled "Foods with dudes". It lists the tasks required to complete the project with start and end dates. Key tasks include PowerPoint research, surveys to finalize the logo and title, filming on location and in the studio between March and April, editing in April and May with peer feedback, and completing an evaluation by May 22nd. The schedule aims to have the podcast completed and ready for final feedback by the listed deadlines.
The document contains a production schedule for a student podcast project titled "Foods with dudes". It lists the tasks required to complete the project with start and end dates. Key tasks include PowerPoint research, surveys to finalize the logo and title, filming on location and in the studio between March and April, editing in April and May with peer feedback, and completing an evaluation by May 22nd. The schedule aims to have the podcast completed and ready for final feedback by the listed deadlines.
Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:
Student Names: Charlie Walsh Sheet
Production Title: Foods with dudes 0 of 0
DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?
13/03/2023 Pre - Production PowerPoint research 24/03/2023 N
First survey: podcast ideas and 13/03/2023 Pre - Production 24/03/2023 N audiences Rough Logo designs + Names/Titles for 20/03/2023 Pre - Production 24/03/2023 N Podcast Second survey: Finalizing Logo and the 20/03/2023 Pre - Production 24/03/2023 N title. PowerPoint Presentation + Peer 24/03/2023 Pre - Production 24/03/2023 N Feedback Production planning for the filming to be 27/03/2023 Pre - Production 31/03/2023 N done week after easter holidays 27/03/2023 Pre - Production AV Script and equipment list 31/03/2023 N
27/03/2023 Pre - Production Third survey: Finalize the logo design 31/03/2023 N
27/03/2023 Pre – Production Risk assessment and running order 31/03/2023 N
Off-site filming (look at contingency and 17/04/2023 27/03/2023 Production N location recce forms) (preferably for me) 17/04/2023 Production Studio filming at the college 17/04/2023 N (hopefully) Editing and designing of effects, intro 24/04/2023 Production 05/05/2023 N and audio Source Clips for Games and foods we 24/04/2023 Production 05/05/2023 N are talking about. ½ through peer feedback and survey 01/05/2023 Post - Production 28/04/2023 N (filmed and around ½ through editing) Continue editing and aiming to have 09/05/2023 Production 10/05/2023 N animated intro done. Peer feedback / teacher feedback 18/05/2023 Post - Production survey on final edit (touch up the finer 22/05/2023 N details) Evaluation that we write up based on 18/05/2023 Post -Production the feedback that we received from our 22/05/2023 N final podcast.