You are on page 1of 21

ECD Architects

Brand Guidelines
Version 01

www.ecda.co.uk
CONTENTS

SECTION 01 SECTION 03
The ECD Architects logo Brand elements
Introduction Company & web tab
How to use our logo Typography
Dual branded items Tables
Our values

SECTION 02 SECTION 04
The ECD Architects colours Literature examples
Our primary colours Reports
Our secondary colours Printed stationery
Electronic stationery
Marketing materials

www.ecda.co.uk
SECTION 01 The ECD Architects logo
SECTION 01 The ECD Architects logo
Introduction

ECD Architects logo and Strapline


The ECD logo is the backbone of our To preserve the integrity of the
identity. Company name, and avoid confusion,
the company strapline Energy Conscious
It should be treated with respect and Design is never to appear without either
never distorted. It is essential that all the company name or logo.
items use the original artwork files to
help preserve the logo’s integrity.
Single colour logo
There is a single colour version of the logo
for use against a white background.

Full colour logo Reversed colour logo


The full colour version of the logo uses the ECD greens and ECD grey to give the logo The logo can also be reversed out on the ECD primary green or black.
maximum impact.
SECTION 01 The ECD Architects logo
How to use our logo

How to use our logo How NOT to use our logo


• The logo should always be re-sized in proportion and never be distorted in any way from
The logo should always be reproduced its original dimensions.
using the correct original artwork, and
• The logo should never be cropped, or the symbol and typography separated.
applied carefully within these guidelines.
• The Logo should never be reproduced in different colours.

New Build Housing


Making sustainable housing a commericial reality

www.ecda.co.uk

New Build Housing


Making sustainable housing a commericial reality

www.ecda.co.uk

Positioning the logo


The logo should wherever possible be positioned at the top left of the page. If this is not
possible, the logo should be moved to the bottom left.
SECTION 01 The ECD Architects logo
Dual branded items

Dual branded items The N-Able Group sign-off


Where items need to carry dual branding Wherever possible, the N-Able Group
to include the Keegans logo, the Keegans sign-off should also appear on all items
logo should be positioned top left, with the to reflect our role as part of the N-Able
ECD logo placed top right. Group. The sign-off should appear as a
footnote at the bottom of single page
items, or on the back-page or reverse of
multi page items.

LONDON
ECD Architects
Studio 3 Blue Lion Place
237 Long Lane
London SE1 4PU

T +44 (0) 20 7939 7500

The logo
F +44 (0) 20 7939 7501

GLASGOW
ECD Architects
Telford Pavilion, Todd Campus
West of Scotland Science Park
Where possible the logo should
appear in colour.
Glasgow G20 0XA

T +44 (0) 141 948 0600


F +44 (0) 141 948 0601

Sign-off text
The sign off text should be
reproduced in-full below.

The N-able Group provides a range of high quality architectural and building
The N-able Group provides a range of high quality architectural and building
consultancy services focussed on improving the environment we all live and work
consultancy services focussed on improving the environment we all live and work in.
We deliver our services through a core of established and complementary businesses in. We deliver our services through a core of established and complementary
who work together to share their knowledge and expertise providing clients with
integrated solutions that meet their needs and exceed their expectations. businesses who work together to share their knowledge and expertise providing
clients with integrated solutions that meet their needs and exceed their
www.ecda.co.uk
expectations.

Maintaining our relationship


If the Keegans logo has to be moved to the bottom left, the ECD Architects logo should be
moved to the bottom right to maintain our relationship.
SECTION 02 The ECD Architects colours
SECTION 02 The ECD Architects colours
Our primary colours

Primary colour palette


The ECD Architects primary colour These guidelines provide specifications Green Green Green
palette is an important part of the for reporducing these colours in Pantone, Pantone C: 45 R: 149
identity, and must be maintained at all CMYK and RGB 7494u M:20 G: 172
times.
Y: 60 B: 126
K: 1

ECD ECD ECD Forest Forest Forest


Green Forest Grey Green Green Green
Green Pantone C: 66 R: 99
7490u M:27 G: 140
Y: 97 B: 64
K: 9

Our primary colour palette


Our primary colour palette comprises of the ECD Architects Green, Forest
Green and Grey which all appear in the main logo. Grey Grey Grey
Pantone C: 56 R: 117
424u M:45 G: 122
Y: 43 B: 125
K: 10
SECTION 02 The ECD Architects colours
Our secondary colours

Secondary colour palette Colour priorities


The secondary colours should only
ever be used to add variety to the ECD
Wherever possible, the ECD Architects This palette has been carefully chosen,
Architects main colours, and should
colours should be used for all items, but and along with black and white these never be used without them.
where additional colour options are should be the only colours used on
required a secondary palette can be virtually all items.
used.

C: 77 C: 56 C: 88 C: 53 C: 7
M:34 M:11 M:92 M:79 M:66
Y: 12 Y: 25 Y: 0 Y: 20 Y: 100
K: 0 K: 0 K: 0 K: 2 K: 0

R: 51 R: 112 R: 66 R: 137 R: 228


G: 139 G: 182 G: 46 G: 83 G: 115
B: 185 B: 189 B: 165 B: 157 B: 35
SECTION 03 Brand elements
SECTION 03 Brand elements
Strapline & web tab

Web tab Company name tab


Our website is a vital part of our identity, The Web Tab should appear bottom The company name carries a huge The Company Tab should appear
and should appear on all promotional right of the page and the body of history of skill and experience. bottom right of the page and the body
items. The Web Tab houses the URL and the tab should always appear in the The Web tab can be replaced by the of the tab should always appear in the
adds weight to its presence wherever it ECD Architects primary green or white Company Name tab on promotional ECD Architects primary green or white
appears. depending on the background used. items where our logo is not shown. depending on the background used.

www.ecda.co.uk www.ecda.co.uk ECD ARCHITECTS

ECD ARCHITECTS PROJECT DATASHEET

Coal Wharf Mews Caledonia Housing Association


Wisbech

Pre-Qualification Questionnaire (PQQ)


Multi-Disciplinary Consultant Team for Residential Scheme

New Build Housing


COMMERCIAL PROJECT

Client: Fenland District Council At Belmont Road, Grays


REF PS/2016/231
Design concepts for a high quality,
Brief: sustainably constructed development
on the South bank of the River Nene
Contract Value: £1.2m

Floor Area: 4200m 2 10 March 2018


Current Status:

Sustainable Initiatives:
Completed
Photovoltaics and Roof Gardens;
Making sustainable housing a commericial reality
Green Walls.

Some of the most enlightening views of the site are


across the River Nene from the historic North Brin.
A reminder of the natural beauty of the Fens, the
green tree canopies blending into the shrubbery of
river bank verges, the mottled shapes reflected in
the dark hues of the water.

It also provides an incidental transition between


the old and the new, a natural green buffer
between the Georgian facades to the east
and the industrial buildings to the west. This
elevated building mass would open vistas across
a prominent corner whilst still maintaining a
sympathetic presence on the streetscape of
the South Brink. Whereas the innovative use of
‘living walls’ help the building mass to blend in
with natural verge to the River Nene, as well as
sitting comfortably next to the period Georgian
Architecture.

ECD Architects Ltd


Studio 3, Blue Lion Place
237 Long Lane, London SE1 4PU

T. 020 7939 7500


F. 020 7939 7501
E. ecda@ecda.co.uk

www.ecda.co.uk www.ecda.co.uk
SECTION 03 Brand elements
Typography

Typography Using type Digital applications


When using type, be careful not to use For reports, letters other documents in
too many weights and colours. ‘Microsoft Office’ use FS Albert Light 11pt
The use of typography gives a strong FS Albert is installed on all computers.
(line space multiple 1.2).
cohesion to our identity, and FS Albert Should you find you are unable to Please use FS Albert Bold for headings,
has been chosen as our primary typeface use FS Albert then Arial may be used FS Albert Regular for sub-headings
and is available in a range of weights. in its place. and FS Albert Light 11pt for body copy.

FS Albert ABCDEFGHIJKLMNOPQRSTUVWXYZ
Main heading
ECD Architects
Forest Green
Thin abcdefghijklmnopqrstuvwxyz Bold 48pt

01234567890!@%&()?
Sub heading ECD Architects
Grey
Bold 32pt
FS Albert ABCDEFGHIJKLMNOPQRSTUVWXYZ Body copy olorerro qui corum atem facipsa tibusa ipsun
Light abcdefghijklmnopqrstuvwxyz temqui delique nis essum nihilitatus ant ommolorem ex Black
eos quo et et laudistem. Et acilloruntur qui rem istem. Light 11pt
01234567890!@%&()?

FS Albert ABCDEFGHIJKLMNOPQRSTUVWXYZ Secondary font where FS Albert not available

Regular abcdefghijklmnopqrstuvwxyz Arial ABCDEFGHIJKLMNOPQRSTUVWXYZ


01234567890!@%&()? Regular abcdefghijklmnopqrstuvwxyz
01234567890!@%&()?

FS Albert ABCDEFGHIJKLMNOPQRSTUVWXYZ Arial ABCDEFGHIJKLMNOPQRSTUVWXYZ


Bold abcdefghijklmnopqrstuvwxyz Bold abcdefghijklmnopqrstuvwxyz
01234567890!@%&()? 01234567890!@%&()?
SECTION 03 Brand elements
Tables

Tables Using tables


When using tables, try to
make sure that they form
When creating tables the key is The ECD Architects primary colours
a coherent set. By using
simplicity. Do not include too many should be used wherever possible, with secondary weights and
weights and colours - try to use bold and the secondary palette used only where it colours sparingly you will
light wherever possible. is essential to provide clarity. avoid creating tables that
compete with each other.

Header
Heading Heading Heading Heading Heading
Use FS Albert bold
01 02 03 04 05

Content 01
Table content
Use FS Albert light,
introducing heavier weights
and italics sparingly and
only to help with clarity. We have a wealth of experience and expertise in initiating, Our knowledge, skills and understanding have been brought
procuring and managing refurbishment, planned to bear in the successful delivery of many social housing
improvement schemes, cyclical and responsive maintenance projects both new build and refurbishment and long term
and new build projects in the social housing sector. We framework agreements for the delivery of quantity surveying
actively promote partnering and collaborative working across professional services as part of our multi-disciplinary team or
all our commissions with emphasis on ensuring that all as a stand alone services. Within these roles Keegans have
stakeholders in a project support its objectives and benefit been instrumental in introducing new ways of working to a
from its completion. In all cases our services are targeted number of housing projects, achieving comprehensive cost
towards achieving the wider regenerative benefits which and time efficiencies for clients and high levels of resident
sustainable re-investment can bring to a locality. satisfaction. Below are some recent examples;

Procurement
Project Client Description Value
& contract
Burnt Oak Broadway Barnet Homes Redevelopment of tenanted blocks at Burnt Oak £3.3m JCT Intermediate
Broadway estate. The redevelopment will include
the conversion of the flat roofs to Mansard roof with
additional accommodation contained within roof
space. There are also plans for 2 additional houses on
infill sites between the blocks. Staff involved; Jamie
Carter & Daniel Jenkins
Wilmcote House Portsmouth Council Retrofit & refurbishment of Wilmcote House an 11 £13.5m JCT Standard

Column shading Stock re-investment Crawley Homes


storey, 3 tower, housing block to EnerPhit standard.
Staff involved; Simon Tong & Jamie Carter
Strategic advice, cost management & delivery and £33m
with Quantities

ACA TPC2005

Use the ECD Architects


programme management of stock investment Programme. Staff
involved; Andrew Morrison & Jamie Carter

primary colours - only


Walton Court regeneration Vale of Aylesbury New build and refurbishment of mixed use residential, £7m JCT Standard
Housing Trust commercial and community facilities. Staff involved; with Quantities
Jamie Carter & Andrew Morrison

introducing the secondary


Decent Homes Enfield Council Decent Homes programme to over 1500 properties £21m JCT2005
Programme including both internal & external refurbishment. Staff
involved Ian Sarchett, Jamie Carter, Stuart Green
Better Homes Programme Royal Borough of Managing years 1 & 2 of their Better Homes Yr1; £4m PPC 2000

palette sparingly. Use a fine Kingston Programme including internal and external works
(2012 - 2014). Staff involved Jamie Carter, Steve Dean
& Stuart Green & Ashok Parmar
& yr 2;
£8.1m
partnering

line for clarity.


Better Homes Programme Homes for Haringey Delivery of year 7 & 8 Better Homes Programme £22m PPC2000
including bathrooms, kitchen, externals (windows), (Amended 2008)
rewires, heating, door entry, CCTV. Staff involved; ACA Standard
Andrew Morrison, Waseem Riaz, Jamie Carter, Leigh Form of Contract
Rowley for Project
Partnering.

ECD Architects Ltd

Column & row separator


Studio 3, Blue Lion Place
237 Long Lane, London SE1 4PU

T. 020 7939 7500


F. 020 7939 7501

Use a fine rule in the colour E. ecda@ecda.co.uk

of the header box. www.ecda.co.uk


SECTION 03 Brand elements
Our values

Our values
Our values define our principles and These icons have been created to
priorities as an organisation. They guide embody those values, and can be used in
what we do and how we do it. N-Able blue or black.

We care We achieve as a team

values
At the heart of what we do

We improve We deliver
SECTION 04 Literature examples
SECTION 04 Literature examples
Reports

Reports Report content templates


We have branded oversized report We have set brand templates in Word
covers that can go into A4 folders. If you for use. Please take a copy and use
require a cover for a folder, please speak for your reports. Do not save over the
to marketing. Provide them with the text original template file.
you want in place on the cover and they
will produce it for you.
All ECD templates can be found in the following folder:

Q:\ECD\QUALITY ASSURANCE\01-ECD CURRENT\01-ISO 9001\08-Templates\


01 Templates (Current)

Front cover Spine Report template

Pre-Construction Services Agreement


Contract Progress Data
Caledonia Housing Association
Imos senis et quia debis etur. Xerume ni cuptam aut ommo doluptis nost rem. Name volum eaque pero endae dolor

Pre-Qualification Questionnaire (PQQ) reres et la serspidita dolorruptat quae. Ent harchil ipsapicitius volorercia ea digent.
Borem est reped ut ma si dolupta que rerrum quas aborehent ut il explibusam, saeperistem dolupta nis dis con prestem
ilictem labor adion precten dantotatum excerferi anisquo ipsaperum faccatur sitint que vel ipsande bissitis ullacea dita
Multi-Disciplinary Consultant Team for Residential Scheme int, cum site sit aut qui quissin ihitiossum volut fugitat volorias erum adit que nimi, offic tecto moditi sus inis estiore
doluptaquis enim volorep udicillenis mod minisim olorerum reriberum quunto il imus aut fugiti aut fugit qui corum ius
At Belmont Road, Grays molor anto voluptatem verio to quia nes a quidunt incipsum re aut facim explici lignam as estibeatem restotam aut
accatquae dolupti busciis quiati beate denist porrorro to et prest, se quam quatet occus et abor archil mo voloraectias
REF PS/2016/231 as ex et quatus adipsae ptatatur sus debit acestrum illandae. Nemquae ctotasp ereptae lit moditiist voluptat rehent.

10 March 2018 Te etur aute dia quam int, torum est eos quossit alit quia in perchil
Solomon’s Passage (Blocks A and D) 40 & 46 Peckham Rye, London SE15 4JR

Solomon’s Passage (Blocks A and D) 40 & 46 Peckham Rye, London SE15 4JR

Mossitio estrumet labo. Um nos suntore escienit hil ipsunt optaqua mendaeris et utature nonectio. Orem etur, volest,
comnitatur, opta del ea custium quunt, soloreium eicipiet omnitatur, omniam repudi sunt et voluptateni ut que volum
sunt offici quatiae conseque eos endae molorae elictor eriberitam harum eatus eos adiant dolorat.

Pa debitio id et quam, iument as siminus quam dit eumquiae. Volentotatur aut ut aliqui te alitibearci as elest,
odicill ectiaerro bla ant essimpo reptaturia doluptatiat quam, sunt quaepeliquae inveriam ex et arum ad eribusam
Wandle Housing Association

Wandle Housing Association

voluptatem labor reprepu digeni volorum excepta esequia tibusap elique sedipsandic tendit fugit fugit, se as eum
arundempore anto odit imin perendem. Hillece rferrumquias que et, cum, si que poreped quodi venisitae. Iquam apiciis
ius et aut rempor sa derferfero venis doluptatus dolut voluptae non por rerianda volut et quatur. Qui conecat resequam
ut laborem non nobiti ullenis ciistrum aute volorio quam, a veleceaque non res quunti occus incium laborpo ruptate
asima iumquam eum re mos essit ullo oditatur sunde nus, to dem voluptat officienis di cus, te nimodiae magnimus

Geni dolestrum ius renda disciusam conseceste nat officimagnam ratus


Necte nimodi doluptae. Nam quis se latur ma dollesti resciisqui doluptas endigni hillenestiur aliberum dipiti con
excere suntist inum consequidis si tem que rem quam ipiscip sapicip sandell uptam, officidisto moluptae vid et que
voloreperum dolo eost, corerum qui bernatur? Ulpa consequi alic tempellendae andant, cus voloreh endebit volori
blaut acitate voluptaquia as moluptur ma di quibus nullesequia que non reium comnis ditibusae odis dit liquiscides es
Enabling Works Tender Part 1

Enabling Works Tender Part 1

aliqui veligni ssimolo reperrum et rem dolorru ptaspid qui sita anda aut quidi as recate raectas autem essimi, officid qui
sundam verrum quam eum et voluptatium.

Wandle
Wandle
Housing
Housing
Association
Association Ostiist illoria et opta aut hit, aped qui ullupta tiisque cor magniendis magnis inume porrore remporecto mo ma solum
harchita doloria dit quas eum rem quatemp orumque que earum fuga. Ucipsumque volupta voluptibere dit eriantiatur,
simi, consecae. Dus net re vel et et estia neturio molupie nisquae. Hendae et vollupi endebitae nimoluptatem
Solomon’sSolomon’s
Passage (Blocks
Passage
A and
(Blocks
D) 40
A and
& 46D)Peckham
40 & 46Rye,
Peckham
London
Rye,
SE15
London
4JR SE15 4JR explisitat pa iuntor rempos cus, voluptint repratq uidunt abo. Ut lautet aut rehenim usanducia sitem a volut reiciis as
Enabling Works
Enabling
Tender
Works Tender sumquos dolupta tionet aut am fugitatur? Qui ut ut lant quos audisim eum dolla volorepudis eiusantiis dolupitaque
con eribusciatem quia sa dolorestia pratis auteniet quunte inisimp erspisci de conseceatis volor aut ut fuga. Et
Part 1 Part 1
occaborerem. Aquod ut litiandae intiorro consequunt.

Caledonia Housing Association


2
Pre-Qualification Questionnaire (PQQ)
www.ecda.co.uk
www.ecda.co.uk www.ecda.co.uk www.ecda.co.uk
SECTION 04 Literature examples
Printed stationery

Letterhead Meeting minutes


Please use our Letterhead template printing. This file should then be printed Please use the standard branded
for correspondence. Letters sent on our “good” paper (90gsm, FSC template for all meeting minutes.
electronically should include the senders certified, Color Copy Paper) with the “Fit”
electronic signature, and be saved and button selected within the Print pop-up
sent as a PDF file. Hard copy letters window. The printed letter can then be
should be saved as a PDF prior to signed and sent.

Headings: FS Albert Bold Size: 11pt Line spacing: 1.2 All ECD templates can be found in the following folder:
Text: FS Albert Light Size: 11pt Line spacing: 1.2 Q:\ECD\QUALITY ASSURANCE\01-ECD CURRENT\01-ISO 9001\08-Templates\
01 Templates (Current)
Letter Continuation sheet

ECD ARCHITECTS LTD Lo culpa dolor resciis modipsandam dolessimusae idundit atibus et qui doloreium int peditaqui
STUDIO 3
blabor maxime et, ventiis dolupta tintium vidus a is aut quunt esed ma qui te mi, omnistiae
BLUE LION PLACE
237 LONG LANE odicabo. Et quis et erchil ipit lam inciendant re nietur, ut exeria sit magnat alignih itatur re vereic
LONDON SE1 4PU tenda dendicimet volent es eum sequiberro quas demped ere ipsam eiur.
Jessica Reubens
Polypipe Civils Head Office Nam qui cum quia descitatus audae con pore omnitatum serspit atisim dis dolorio maion rerem
T. 020 7939 7500
Charnwood Business Park F. 020 7939 7501 quae mi, odit repuda invenes tionestem quaspe nonectia quam, inventiur aut id quam, optaqui
North Road E. ecda@ecda.co.uk doluptatenis et, ea consent autat ma volorem aut id quat resendi velliqu idendig niendit quias
Loughborough ariatur aliqui berovid endaero vendicae illaborem quissit atiossit estruptae labo. Ut et il eum
LE11 1LE necerfe rferspe rferchi licaborae videstia nullo ex eossi officto conseque dollit aut porrovi tatibus,
nonessi to tem il eum ut eari omni que ant odisque nest ut prestibus modis mo velitat ibusand
isciis rerrori dellab inventibus, ut untum re necea num nosandi dunt de ne essequi officip
Date sapicab.

Re: Vel et volores sequidem illab ipsapitio suseostiis as ilis ut volupta quatur. Asimus dolorunt. Occullo recaborum quistibus alicitati nullentus enda dentur, odi arum quat
quatecatis arum, autecaborem quae expe dernatur?
Lo culpa dolor resciis modipsandam dolessimusae idundit atibus et qui doloreium int peditaqui Idundi nullese ditaquam, sed explautam, opta voles aut officatur sin nus et maiossi ute nusapis
blabor maxime et, ventiis dolupta tintium vidus a is aut quunt esed ma qui te mi, omnistiae et oditatem eium quisquiatur as assequae sit evenist, omnimus audaesequam ne od quoste
odicabo. Et quis et erchil ipit lam inciendant re nietur, ut exeria sit magnat alignih itatur re vereic net am invendae sequatu rempeles endelluptae nonsequi iduciis doluptae. Itaes mi, quaesentiis
tenda dendicimet volent es eum sequiberro quas demped ere ipsam eiur. sedita illut quiam, solore occabore voloreperum vollentur restibus dolo veliquunt quodita tectate
necab imus, sus simolor asimet et, ad ulpa vel expedion cum, id modipsandi inita iliqui ant modis
Nam qui cum quia descitatus audae con pore omnitatum serspit atisim dis dolorio maion rerem assundit que pedigen imagnia tquias et, ulparia venihil impos rere suntend itiore optaquat
quae mi, odit repuda invenes tionestem quaspe nonectia quam, inventiur aut id quam, optaqui autem est am harchillabo. Nus erum reperit eum escias quiderro magniatem ipsus elent,
doluptatenis et, ea consent autat ma volorem aut id quat resendi velliqu idendig niendit quias seditibus non nemporepedi ipsapis que praecae pratqua tempore voluptium illuptatur aut aut
ariatur aliqui berovid endaero vendicae illaborem quissit atiossit estruptae labo. Ut et il eum laborent.
necerfe rferspe rferchi licaborae videstia nullo ex eossi officto conseque dollit aut porrovi tatibus,
nonessi to tem il eum ut eari omni que ant odisque nest ut prestibus modis mo velitat ibusand Hictem volorempore quistius et, ullis earupta eperumquam ipsant plabori ssumquam, offictur
isciis rerrori dellab inventibus, ut untum re necea num nosandi dunt de ne essequi officip minci alia sum velendae pe de molupti orepudae. Us mintiatur, sitius ipsum doloreius.
sapicab.
Yours sincerely
Giti none re dolupta tetur, nos volupta tenihiciis vendam laceres magnat ipsa prorum ellupta
poritium etur aperionem volorpo rroris sam ea nossi dolut velessi tiureni blandae enihitis
asped et quis excero ea solese pero dolupta none ea verum archiliquo ent. Corerum ipsunda
ectiaeped quaecum qui della venecum ipsum re re sitibus, que parum fuga. Itatemp ostrum ulpa
quate placero esed et arum ex eum videllatur andunt que lautat la nientor empori occatecest
restionem untoreh enihiliquam hil molore, quiae optassus rem. Utaquiandant rae estrum nisciis
delendaeprem eatius moluptas sus.

Ugia dis et re ped unduciat aut occum verum quisi bero minti tectatem aristi consequam,
as dolessita iur aborem vollic tore, testotatem ratur autes essed magnimpel imet fugiatis Jessica Reubens
commolorem quibus atiae. Ignimag niminus, occat. Unt occab inctior uptatur serferc hillantota
quo et veres aut lautemp orest, comnimaio molorepercid qui sunt eat. Ti quiatiunt fugiam am
ut quiant que nulpa dolupta tenient dit voluptas quia cumet iur. At dellorum rem ra voluptatem
earum que nos repedis orehenient aut voloribust, ut quasperatem sin con re, cus apitatis inci
alique sa coresti busam, tem aut pe labo. Eque incia quas dolorpor sitat ommolo conserc
hitaquas elestrum nissin rempelibeat.

ECD Architects Ltd. Registered Office:


Studio 3 Blue Lion Place, 237 Long Lane, London SE1 4PU
Registered In England: No 03028104

www.ecda.co.uk
SECTION 04 Literature examples
Electronic stationery

Emails PowerPoint templates


Emails should be written in FS Albert Light We have a standard branded template
11pt. Email signatures are automatically for PowerPoint presentations.
setup by IT. Do not change them yourself.
If you require yours updating please speak
to the marketing team.

All ECD templates can be found in the following folder:


Text: FS Albert Light Size: 11pt
Q:\ECD\QUALITY ASSURANCE\01-ECD CURRENT\01-ISO 9001\08-Templates\
01 Templates (Current)

New Build Housing


Making sustainable housing a commericial reality

www.ecda.co.uk
SECTION 04 Literature examples
Marketing materials

Company profile Sector profile Curriculum Vitaes


We have a range of marketing material We have a sector profile brochure which All staff CVs are created by
to help you promote our business. provides an overview of our areas of marketing team into this template
expertise. for the use in bids.
We have a company profile sheet which
provides an overview of our areas of If you require a new brochure or amends
expertise. to any other existing items please speak
to marketing.

ECD Architects: ECD Architects is an award winning New Build Housing


architectural practice committed to

We are an award winning practice design excellence, cost effectiveness


and commercial reality. We endeavour to create ‘universal ECD ARCHITECTS CURRICULUM VITAE

specialising in the design of low energy, designs’ which enable people of all ages
low environmental impact buildings, cost
Our expertise and project has been
developed over 33+ years. This includes James Traynor
completed projects for all types of private and abilities and therefore support the BA(Hons), BArch(Dist), MSc, ARB, RIBA, CEPHD
effectively and to the highest quality sector and public sector clients
throughout the UK. longevity and permanence of the Managing Director
Malton Road, London: Creation of office space standards. Project Name: Project Name Value: £xxxxxx community…
beneath the West Way. Client: Name of Client

Profile

James completed an MSc at the Centre for Alternative Technology specialising in the application of renewable energy in the domestic
sector. Prior to joining ECD he worked on a variety of residential, leisure, industrial and educational projects. In 2009 he led a number
of ‘Retrofit for the Future’ projects and in recent years, James has spoken at a number of conferences including ‘Ecobuild’ and
‘Retrofit Expo’ on low energy design solutions. He has a particular interest in post-occupancy evaluation as a means of improving
our understanding of design and long-term service to clients. As a Director, James is responsible for the day-to-day coordination of
specific ECD project teams and the allocation of tasks for the project architects and assistants. James is the first point of contact for
ECD from achievement of planning permission through to practical completion.

Memberships

Architects Registration Board – 066143K


R.I.B.A.– 7004758

Qualifications
Avondale Primary School, Kensington: Extension Wilmcote House, Portsmouth: Retrofit to the Tops Club, Thurrock: New build social housing as Project Name: Project Name Value: £xxxxxx Project Name: Project Name Value: £xxxxxx Project Name: Project Name Value: £xxxxxx
Project Name: Project Name Value: £xxxxxx
& refurbishment Passivhaus EnerPHit Standard flats and maisonettes Client: Name of Client Client: Name of Client Client: Name of Client
Client: Name of Client BA(Hons) Architecture (De Montfort Univeristy, Leicester) 1996
BArch(Dist) Architecture (University of Liverpool) 2000
PGDip in Professional Practice (RIBA) 2001
ECD Architects was established in 1980 • Drawings and specifications For example, we are currently working Msc. Advanced Energy & Environmental Studies (Centre for Alternative Technology/ UEL), 2004
CORE SERVICES What we’ve done Our approach Value management Sustainability BRE Passivhaus Certification Training
with a focus upon sustainability. Today • Oversight of on-site construction with clients providing the following BIM
Architecture We have delivered projects throughout ECD has a proven track record of both We work with communities to achieve Our market focussed, commercial We bring the latest environmental CBES Asbestos Awareness Completed Certificate Training No: e454769
we have offices in London and Glasgow • Completion and post completion services:
Masterplanning England and Scotland and are identifying sites for new build best value for our clients by creating approach to the design enables us to thinking to our clients. ECD has a
employing 36 staff. Our projects range review
Regeneration experienced in identifying local authority development that are suitable for homes that improve and create provide solutions which maximise site strong track record of successful Relevant Experience
in value from £100k to £40m and span • BIM Guidance and project
Sustainability needs and negotiating with planning residential, mixed-tenure and mixed-use neighbourhoods of which their residents values and success in obtaining planning sustainable projects. We know what
the sectors. These can be illustrated by We maintain a strong team of designers, management
departments. developments. are proud. permission. provides the most viable outcomes • Wilmcote House, Portsmouth (ECD Current project) Regeneration of 11 storey, 3 tower, housing block to extend its life for a
our current and recently completed technicians and specialists with a wide • EIR and BEP development
SECTORS and what does not. minimum further 30 years with measures enabling it to achieve the Passivhaus EnerPHit standard. RIBA stages 1 to 7 (from
projects in: range of experience and knowledge of a • BIM Performance analysis
Housing ECD’s strength lies in our ability to ECD is a quality driven company feasibility study and structural surveys to completion on site and post occupancy evaluations). (Value £12.9m)
range of building modelling, analytical, • Information Management
Education quickly identify a site opportunities and focused upon streamlining our services Services such as thermal and light • Walton Court, Aylesbury (Complete) Regeneration of mixed use development with severe vandalism and anti-social behaviour
• New build housing project management and monitoring • Task Team Management
Commercial constraints which enables us to maximise to a cost conscious service which modelling, and sustainability appraisal, issues involving the relocation of retail units and development of new housing to enable a clear hierarchy of public and private
• Refurbishment & Retrofit programmes, as well as, Revit Certified • Model Asset Management
Arts & Leisure development sites and provide our clients enables budgets to focus upon quality are integrated into our architectural space which is both safe and secure whilst providing a sense of neighbourhood and interaction with the wider community. RIBA
• Commercial / Industrial Professionals to oversee each project’s
with viable options for development. design and construction. design process, enabling us to provide a stages 1 to 7 (Value: £9.9m)
• Schools & Higher Education quality management and ensure each is Whether refurbishment or new build
holistic package for our clients. Our team
• Community & Leisure implemented in line with BIM standards. construction, our projects are undertaken • Bede Estate, Mile End (Complete) Masterplan and new build infill development as well as regeneration works including: the
We endeavour to create ‘universal Our delivery of quality homes which focus includes accredited Passivhaus designers
with a fabric first approach which relocation of the underground parking; replacement of the existing stair cores with secure entrance lobbies; reduced access to high
designs’ which enable people of all ages upon the development of sustainable and experienced Building Performance level walkways and stair cores to reduce through traffic and increase security; implementation of an on-site recycling system; and
ECD clients encompass local authorities Beyond the quality of our architecture, extensively improves the building thermal
and abilities and therefore support the communities has resulted in positive evaluation (BPe) providers. new fire strategy. (Value £30m)
and government departments, housing we add value to our service delivery by envelope with internal and external
longevity and permanence of the feedback from tenants and quick
associations and developers, charitable providing in house: insulation, insulated doors and windows. • British Estate, Mile End (Complete) New build infill mixed use development providing 173 residential units, community amenity
community by providing for as they residential sales. The practice is represented on both the
trusts, public and private companies. ECD and commercial space within 6 buildings ranging from four to six storeys located on five sites. (Value: £25m)
evolve, grow older and their needs RIBA Sustainable Futures and the CIC
commissions cover the full range of • BIM (Management & Training) With 37 years of experience providing
change. Sustainable Development committees.
architectural services to include: • Passivhaus & EnerPHit award winning, sustainable design, we
We regularly present at or attend
• Capacity and feasibility studies


Retrofit Coordination
Post Occupancy and Building
afford our clients a comprehensive
knowledge of relevant, cost effective Our consultation processes put people at the ECD delivers sustainable homes by sustainability seminars and workshops
designing to passivhaus principles in order to remain fully informed of London Office Glasgow Office
• Phased master plans
• Concept development and
Performance Evaluations
• Energy Assessments
measures that provide measurable
benefits drawn from the most current ECD was established in 1980 with heart of the creative process, identifying the focusing upon practical, cost-effective best practice.
Studio 3, Blue Lion Place,
237 Long Lane,
38 Queen Street,
Glasgow,
offices in London and Glasgow. ECD measures to deliver homes which are
needs the community, empowering
London, SE1 4PU G1 3DX
detailed design • Fire Safety Risk Assessments and up to date methods of energy and
is a RIBA Registered Practice and a energy efficient and inexpensive to run T: 020 7199 0900 T: 0141 204 7855
• Planning Submissions environmental conservation. E: ecda@ecda.co.uk
member of the N-Able Group of as well as minimising waste in
property related companies. stakeholders, and creating goodwill. construction.

www.ecda.co.uk www.ecda.co.uk
SECTION 04 Literature examples
Marketing materials

Case studies Press advertising Email marketing


We have 2 types of case study templates Adverts are created for targeted trade Throughout the year we will run
to help showcase our best projects. One press. Please liaise with the marketing marketing campaigns.
gives an overview of a single project, the team for any advertising requests.
other a snapshot of numerous projects.
We are constantly looking to update and
create new ones.

Case study Overview sheet

Case Studies
ECD ARCHITECTS PROJECT DATASHEET

Coal Wharf Mews


Wisbech

DESIGN FOR A
COMMERCIAL PROJECT Project name:
Greenwich Council school
Project name:
Greenwich Council school
Project name:
Greenwich Council school
Project name:
Greenwich Council school
SUSTAINABLE FUTURE
expansions Lakehouse 4 year expansions Lakehouse 4 year expansions Lakehouse 4 year expansions Lakehouse 4 year
Client: Fenland District Council
framework framework framework framework
Design concepts for a high quality, - ARCHITECTURAL SERVICES
Brief: sustainably constructed development Client: Greenwich Council Client: Greenwich Council Client: Greenwich Council Client: Greenwich Council
on the South bank of the River Nene Value: Various Value: Various Value: Various Value: Various
Contract Value: £1.2m Form of contract: JCT D&B Form of contract: JCT D&B Form of contract: JCT D&B Form of contract: JCT D&B - MASTER PLANNING
Project: Primary school expansion Project: Primary school expansion Project: Primary school expansion Project: Primary school expansion
Floor Area: 4200m2 under a 4 year framework including under a 4 year framework including under a 4 year framework including under a 4 year framework including
Current Status: Completed Woodhill Primary School and De Lucy Woodhill Primary School and De Lucy Woodhill Primary School and De Lucy Woodhill Primary School and De Lucy - URBAN DESIGN
Primary School Primary School Primary School Primary School
Photovoltaics and Roof Gardens;
Sustainable Initiatives:
- COMMUNITY CONSULTATION
Green Walls. Staff involved: Staff involved: Staff involved: Staff involved:
Campbell Skinner, Graeme Scott Campbell Skinner, Graeme Scott Campbell Skinner, Graeme Scott Campbell Skinner, Graeme Scott

Some of the most enlightening views of the site are - SUSTAINABILITY ADVICE
across the River Nene from the historic North Brin.
A reminder of the natural beauty of the Fens, the
green tree canopies blending into the shrubbery of
river bank verges, the mottled shapes reflected in
the dark hues of the water.
www.ecda.co.uk T: 020 7939 7500
It also provides an incidental transition between
the old and the new, a natural green buffer
between the Georgian facades to the east
and the industrial buildings to the west. This
elevated building mass would open vistas across
a prominent corner whilst still maintaining a Project name: Project name: Project name: Project name:
sympathetic presence on the streetscape of Greenwich Council school Greenwich Council school Greenwich Council school Greenwich Council school
expansions Lakehouse 4 year expansions Lakehouse 4 year expansions Lakehouse 4 year expansions Lakehouse 4 year
the South Brink. Whereas the innovative use of
framework framework framework framework
‘living walls’ help the building mass to blend in
with natural verge to the River Nene, as well as Client: Greenwich Council Client: Greenwich Council Client: Greenwich Council Client: Greenwich Council
sitting comfortably next to the period Georgian Value: Various Value: Various Value: Various Value: Various
Architecture. Form of contract: JCT D&B Form of contract: JCT D&B Form of contract: JCT D&B Form of contract: JCT D&B
Project: Primary school expansion Project: Primary school expansion Project: Primary school expansion Project: Primary school expansion
under a 4 year framework including under a 4 year framework including under a 4 year framework including under a 4 year framework including
Woodhill Primary School and De Lucy Woodhill Primary School and De Lucy Woodhill Primary School and De Lucy Woodhill Primary School and De Lucy
Primary School Primary School Primary School Primary School

Staff involved: Staff involved: Staff involved: Staff involved:


Campbell Skinner, Graeme Scott Campbell Skinner, Graeme Scott Campbell Skinner, Graeme Scott Campbell Skinner, Graeme Scott

ECD Architects Ltd


To find out more information on any of our London Office Glasgow Office
Studio 3, Blue Lion Place
range of services, please contact us on: Studio 3, Blue Lion Place, 38 Queen Street,
237 Long Lane, London SE1 4PU
237 Long Lane, Glasgow,
T. 020 7939 7500
F. 020 7939 7501
020 7939 7500 London, SE1 4PU
T: 020 7199 0900 F: 0207 199 0901
G1 3DX
T: 0141 204 7855
E. ecda@ecda.co.uk Email: ecda@ecda.co.uk E: ecda@ecda.co.uk

www.ecda.co.uk www.ecda.co.uk
For more information, please contact marketing.

London Glasgow
ECD Architects ECD Architects
Studio 3 Blue Lion Place The Centrum Building
237 Long Lane 38 Queen Street
London SE1 4PU Glasgow G1 3DX

T +44 (0) 20 7939 7500 T +44 (0) 141 204 7855

www.ecda.co.uk

You might also like