Site Restoration Activity Date Completed Exceptions
Demobilization Date Approved
Requirement for Isolation of Facilities (telecoms,
electricity, water) notified to PDO Residential Camp Inspection Completed
Office Inspection Completed
Industrial Area Inspection Completed
Work-site Inspection Completed
All PDO Assets handed over to PDO
All actions as per SP-1012 completed – Land
Management All Outstanding materials handed over to PDO
Summary file of Contract Waste Log handed over to
PDO Notes: On behalf of the Contractor I confirm that the activities stated above have been carried out and we have restored the sites according to the Contract Requirements Name Date Responsibility Signature Contract Manager We hereby agree that the HSE status of this Contract allows the Contractor to Demobilize subject to the exceptions listed above. Name Date Ref. Ind. Responsibility Signature PDO Rep. * Contract Holder *At Contract Holder's discretion