Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:
Student Names: Fletcher Harries Sheet
Production Title: Foods with dudes 0 of 0
DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?
13/03/2023 Pre- production PowerPoint research 24/03/2023 N
First survey: podcast ideas and 13/03/2023 Pre- production 24/03/2023 N audiences 20/03/2023 Pre- production Rough Logo design 24/03/2023 N
20/03/2023 Pre- production Second survey: logos and titles 24/03/2023 N
Production planning for the filming to be 27/03/2023 Pre- production 31/03/2023 N done week after easter holidays 27/03/2023 Pre- production Script planning and equipment list 31/03/2023 N
27/03/2023 Pre- production Third survey: new logo design 31/03/2023 N
27/03/2023 Pre- production Risk assessment and running order 31/03/2023 N
Off site filming ( contingency will be in place in case: filming in a different 27/03/2023 Production 22/05/2023 Y (WC: 1/5/2023) location (look at contingency and location recce forms)) Wc: 17/04 Production Studio filming at the college 22/04/2023 N Editing and designing of effects, logos 24/04/2023 Production 18/05/2023 N and audio Peer feedback survey based on ½ way 01/05/2023 Post- Production 05/05/2023 N through progress and off site filming Continued editing aimed to have logo 09/05/2023 Production 10/05/2023 N and intro done by this point Peer feedback / teacher feedback 18/05/2023 Post- Production 22/05/2023 N survey on final edit Evaluation write up based on the 18/05/2023 Post-Production 22/05/2023 N feedback that we received from