Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Names: Fletcher Harries Sheet

Production Title: Foods with dudes 0 of 0

DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?

13/03/2023 Pre- production PowerPoint research 24/03/2023 N


First survey: podcast ideas and
13/03/2023 Pre- production 24/03/2023 N
audiences
20/03/2023 Pre- production Rough Logo design 24/03/2023 N

20/03/2023 Pre- production Second survey: logos and titles 24/03/2023 N


Production planning for the filming to be
27/03/2023 Pre- production 31/03/2023 N
done week after easter holidays
27/03/2023 Pre- production Script planning and equipment list 31/03/2023 N

27/03/2023 Pre- production Third survey: new logo design 31/03/2023 N

27/03/2023 Pre- production Risk assessment and running order 31/03/2023 N


Off site filming ( contingency will be in
place in case: filming in a different
27/03/2023 Production 22/05/2023 Y (WC: 1/5/2023)
location (look at contingency and
location recce forms))
Wc: 17/04 Production Studio filming at the college 22/04/2023 N
Editing and designing of effects, logos
24/04/2023 Production 18/05/2023 N
and audio
Peer feedback survey based on ½ way
01/05/2023 Post- Production 05/05/2023 N
through progress and off site filming
Continued editing aimed to have logo
09/05/2023 Production 10/05/2023 N
and intro done by this point
Peer feedback / teacher feedback
18/05/2023 Post- Production 22/05/2023 N
survey on final edit
Evaluation write up based on the
18/05/2023 Post-Production 22/05/2023 N
feedback that we received from