You are on page 1of 5

transmitted in any forms and by any means without written permission

document is assumed uncontrolled.

ROOF DECK

CEILING LINE

8TH FLOOR

CEILING LINE

7TH FLOOR

CEILING LINE

6TH FLOOR

CEILING LINE

5TH FLOOR

CEILING LINE

4TH FLOOR

CEILING LINE

3RD FLOOR

ROOF DECK

CEILING LINE

1 18-08-16 EW TENDER ISSUE


0 29-04-16 EW FOR APPROVAL
8TH FLOOR REV DATE CHECKED AMENDMENTS

CEILING LINE APPROVAL

7TH FLOOR

CEILING LINE

3 Church Street www.red-eng.com


#08-00 Samsung Hub t: +65 6408 3389
Singapore' 049483 f: +65 6408 0101
6TH FLOOR
UK Europe Middle East Asia Pacific
CLIENT
CEILING LINE
-

5TH FLOOR
PROJECT
Holiday Inn, Baguio City
CEILING LINE

TITLE
4TH FLOOR MECHANICAL SERVICES
AC & VENTILATION SCHEMATIC /
CEILING LINE EQUIPMENT SCHEDULE

DATE STATUS PROJECT No.

3RD FLOOR April 2016 APPROVAL R30151


SCALE DESIGNED CHECKED
NTS @ A1 NO EW

DWG No. REV

A1 FILE-REFERENCE: R30151-M-00-100 0V1 R30151-M-00-100 1


V1
transmitted in any forms and by any means without written permission

document is assumed uncontrolled.

1 18-08-16 EW TENDER ISSUE


0 29-04-16 EW FOR APPROVAL
REV DATE CHECKED AMENDMENTS

APPROVAL

3 Church Street www.red-eng.com


#08-00 Samsung Hub t: +65 6408 3389
Singapore' 049483 f: +65 6408 0101

UK Europe Middle East Asia Pacific


CLIENT
-

PROJECT
Holiday Inn, Baguio City

TITLE
MECHANICAL SERVICES
CHILLED WATER SCHEMATIC /
EQUIPMENT SCHEDULE

DATE STATUS PROJECT No.


April 2016 APPROVAL R30151
SCALE DESIGNED CHECKED
NTS @ A1 NO EW

DWG No. REV

A1 FILE-REFERENCE: R30151-M-00-101 0V1 R30151-M-00-101 1


V1
transmitted in any forms and by any means without written permission

document is assumed uncontrolled.

1 18-08-16 EW TENDER ISSUE


0 29-04-16 EW FOR APPROVAL
REV DATE CHECKED AMENDMENTS

APPROVAL

3 Church Street www.red-eng.com


#08-00 Samsung Hub t: +65 6408 3389
Singapore' 049483 f: +65 6408 0101

UK Europe Middle East Asia Pacific


CLIENT
-

PROJECT
Holiday Inn, Baguio City

TITLE
MECHANICAL SERVICES
CONTROL LOGIC DIAGRAM

DATE STATUS PROJECT No.


April 2016 APPROVAL R30151
SCALE DESIGNED CHECKED
NTS @ A1 NO EW

DWG No. REV

A1 FILE-REFERENCE: R30151-M-00-102 0V1 R30151-M-00-102 1


V1
© All rights reserved. No part of this drawing may be reproduced or
transmitted in any forms and by any means without written permission
of the copyright holder. Contractors and consultants are not to scale
dimensions from this drawing. Once printed and distributed this
document is assumed uncontrolled.
NOTES:

1. DUCT WORKS TO BE CONSTRUCTED TO SMACNA STANDARDS.


2. ALL NEW SUPPLY AIR DUCTS SHALL BE INSULATED. MINIMUM
DUCT INSULATION R-VALUE IS 1.41m² K/W..
3. PROVIDE ALL NECESSARY SUPPORT/HANGER/BRACKET FOR
INSTALLATION.

³ ³

desk

desk

RM.8-15
luggage

luggage
bar

bar

1 08-11-16 EW FOR APPROVAL


0 02-11-16 EW FOR APPROVAL
REV DATE CHECKED AMENDMENTS

APPROVAL

3 Church Street www.red-eng.com


#08-00 Samsung Hub t: +65 6408 3389
Singapore' 049483 f: +65 6408 0101

UK Europe Middle East Asia Pacific


CLIENT
-

PROJECT
Holiday Inn, Baguio City

TITLE
MECHANICAL SERVICES
Typical Guest Room
HVAC

DATE STATUS PROJECT No.


April 2016 APPROVAL R30151
SCALE DESIGNED CHECKED
AS SHOWN NO EW

DWG No. REV

A1 FILE-REFERENCE: R30151-M-00-400 0V1 R30151-M-00-400 1


V1
PROJECT LANDSCAPE ARCHITECTS

DRAWING TITLE

OWNER ARCHITECTS STRUCTURAL ENGINEER ELECTRICAL ENGINEER MECHANICAL ENGINEER SANITARY & FIRE PROTECT ENGINEER

DRAWING NO.
INTERIOR DESIGNER
LOCATION
SCALE AS SHOWN TOTAL

DATE 03-JULY-2017

You might also like