This document contains a summary of improvement items from a manufacturing process. It lists 6 items needing attention, including improving lux levels at packing, ensuring quality standards are displayed, and defining operator names at workstations. For each item, it describes the analysis of the issue and proposed improvement, and assigns a responsible person or department to address it. All items are marked as having been closed, indicating the improvements have been implemented.
This document contains a summary of improvement items from a manufacturing process. It lists 6 items needing attention, including improving lux levels at packing, ensuring quality standards are displayed, and defining operator names at workstations. For each item, it describes the analysis of the issue and proposed improvement, and assigns a responsible person or department to address it. All items are marked as having been closed, indicating the improvements have been implemented.
This document contains a summary of improvement items from a manufacturing process. It lists 6 items needing attention, including improving lux levels at packing, ensuring quality standards are displayed, and defining operator names at workstations. For each item, it describes the analysis of the issue and proposed improvement, and assigns a responsible person or department to address it. All items are marked as having been closed, indicating the improvements have been implemented.
S.NO ITEM DESCRIPTION CAUSE ANALYSIS IMPROVEMENT STATUS
PERSON/DEPARMENT
1 Lux level need to be improved at packing stage. MR.RAVISH/SANJEEV OPEN
2 PM check sheet was not available of cutting machine. MR.RAVISH/SANJEEV CLOSE 3 NO spec standard found of moulding machine temperature. MR.RAVISH/SANJEEV CLOSE 4 There were no quality standards displayed on the machine. Only Quality Now Alert we is hanging have hanging the critical the Quality stage . Alerts and Quality MR.RAVISH/SANJEEV Standards also . CLOSE 5 Operators'names should be defined at their workstation. Operaters are working one stage permanently Now we butprovide we don't thehave skill any cardevidence for the station for MR.RAVISH/SANJEEV thiswise stage. operaters. CLOSE 6 Packing standard need to be changed,pack one by by one instead of complete At packing roll. station operation Nowis not we sequence have givenwise training not packing. as ,he is working MR.RAVISH/SANJEEV as per WI . CLOSE