Enter the Transformer

and open JOB FILE for it

visual inspection for


Transformer

YES NO

List out the Defect Group -B Defects..? Group -A

1.Spare Parts
2.OIl leakage 3.Welding 4.Painting
Damage

Check the material availability Transformer Testing

1.Oil Break down 2.Insulation 3.Mangnetic 4.Voltage Ratio 5.Mangnetization 6.Schort Circuit 7.Vectore Group 8.Winding
voltage test Resistance Test Balance Test Test Current test Test Test Resistance Test

FAILED
Internal open
NO YES
Defects..? Inspection

PASSED
Group -A Group -B

Repair & Rectified the list Remove usable


out Defects parts from
transformer and
store

Return to Routine
Dispatching Painting
Inspection & Testing Final scraping and
documentation