Project : Water Matic Philippines
Location : Cordova, Cebu
Subject : Suspended Slab Bar Cutting Schedule ###
SPACING O.C. QTY OF BAR PER NO OF CUT No of Cut COMMERCIAL LENGTH
DESCRIPTION GRID BAR TAG BAR Ø BAR BEND TOTAL Set SPAN LENGTH /Commercial WASTE PER LENGTH PC/PCS WASTE WILL BE USED
a b c LENGTH
mm (Pc/Pcs) (PC/PCS) Length 6m 7.5m 9m 10.5m 12m
TRANSVERSE TOP BARS (A-H) L=55.996m
b
TOP BAR 1-7 TB1 (A1) 12mm a 0.100 11.900 12.000 1.00 140 161.00 161.00 1.00 161 0.000 161 ###
b
TOP BAR 1-7 TB1 (A2) 10mm 12.000 12.000 3.00 140 161.00 483.00 1.00 483 0.000 483 ###
b
TOP BAR 1-7 TB1 (A3) 10mm c 9.300 0.100 9.400 1.00 140 161.00 161.00 1.00 161 1.100 161 ###
b
TOP BAR 1-7 TB1 (B1) 12mm a 0.100 9.300 9.400 1.00 140 161.00 161.00 1.00 161 1.100 161 ###
b
TOP BAR 1-7 TB1 (B2) 12mm 12.000 12.000 1.00 140 161.00 161.00 1.00 161 0.000 161
b
TOP BAR 1-7 TB1 (B3) 10mm 12.000 12.000 2.00 140 161.00 322.00 1.00 322 0.000 322 ###
b
TOP BAR 1-7 TB1 (B4) 10mm 11.900 0.100 12.000 1.00 140 161.00 161.00 1.00 161 0.000 161 ###
c