Name of Project: hhghh General Notes:

Job No.: hhghh gkg


Client: yyy uyuu
Designed by: uuu hgh
Date: tyyuy
Sheet: 2 Of 2
Jerv Works Const. Ref: Reinforced Concrete Design, pg.416 by: Besavilla
*Input data in green cells

Footing, square

footing no. ghh

specification
fc' 20 MPa
fy 400 MPa
wt. of concrete 23.5 kN/m3
earth unit weight 15.7 kN/m3
q, allowable soil pressure 170 kPa

service load
service Dead load 900 kN
service Live load 1600 kN

column
h 480 mm
b 480 mm

footing OK
assume L 4.2 m2 > = 4.2 OK - soil pressure
assume footing h (min. .20m) 0.8 m. OK - footing depth but may lessen by 5.68%
concrete cover 70 mm

overburden 0.6 m

R-bars to use
Phils. Standard Reinforcing Bars

r-bar
footing reinforcement
25mm

r-bar no.
column dowels
25mm 4 min. 4

Results:
OK - soil pressure
OK - 2-way shear
OK - beam shear
OK - ld of reinforcement
OK - bearing load of column to footing
OK - no. of column dowels
use ld min 400 mm into both column and footing
480 mm

4.2 m 480 mm

15 - 25mm e.w.

0.6 m. overburden

15 - 25mm e.w.

0.8 m

4.2 m

solution

wt. of assume footing 331.632 kN


wt. of overburden 163.9984 kN
total load = wt. of footing +overburden+ column load 2995.63 kN
required footing area = total load / q 17.62136 m2
required footing L = 4.2 m
actual footing L 4.2 m
actual footing area 17.64 m2
Pu = 1.4(DL+overburden) + 1.7LL 4209.598 kN
qu, actual upward soil pressure = Pu/actual foot. area 238.6393 kPa

qa ,allowable value of soil pressure = q* Pu /(DL + LL) 286.2527 kPa >>== 238.6393
OK - soil pressure

check d by punching shear


actual d = 692.5 mm
min c = 480 mm

d/2 c d/2
L

actual punching shear, vn = Vu/Фbod


actual Vu =qu* [L2 - (c+d)2] 3881.527 kN
actual shear vc = Vu / Фbod 1406.019 kPa

allowable punching shear


βc = long side of column / short side of column 1
allowable punching shear, vc = (1+2/βc)√fc'/6 2236.068 kPa
allowable punching shear = √fc'/3 1490.712 kPa
use min. vc = 1490.712 kPa >> == 1406.019
OK - 2-way shear
OK - footing depth but may lessen by
% 5.68

check for beam shear


actual beam shear
r = L/2-c/2-d 1.1675 m
Vu = qu*L*r 1170.168 kN
vn = Vu/θLd 473.3258 kPa

allowable beam shear


va = 1/6√fc' 745.356 kPa >>== 473.3258
OK - beam shear
d 36.5
r c/2

Bending moment

L
x=( L-c)/2 1.86 m
actual bending moment Mu = qu*L*x2/2 1733.753 kN-m
Mn = Mu/.90 1926.392 kN-m
m = fy/.85fc' 23.52941
Rn = Mn/Ld2 956.4359 kPa
ρ = 1/m(1-√1-2mfRn/fy) 0.002462
As = ρ (actual L*d) 7161.964 mm2
no. of bars 15 ea.

check ld
required ld = .02Ab*fy/√fc' 879.9375 mm
or ld = .06dbfy 600 mm
required ld = 879.9375 mm

actual ld = x - concrete cover 1790 mm >>== 879.9375


OK - ld of reinforcement

check bearing stress of footing


allowable = θ*.85fc'A1√(A2/A1) ACI Code
A1 area column = 0.2304 m2
A2 area of square footing at center strip 17.64 m2
√(A2/A1) = 8.75
or max √(A2/A1) = 2
required √(A2/A1) 2
θ= 0.7
allowable = θ*.85fc'A1√(A2/A1) ACI Code 5483.52 kN
actual bearing load = 1.4DL + 1.7LL 3980 kN <<== 5483.52
OK - bearing load of column to footing
required min area of dowels = .005*area column 1152 mm2
actual area of dowels 4 - 25mm 1967.6 mm2 >>== 1152
OK - no. of column dowels

check development length of dowels (in compression)


min. Ld = .04db*fy 400 mm
or min = 200 (ACI 318-83 Section 12-3-1) 200 mm
Ld = db/4(fy/√fc') 559.017 mm
required Ld = Ld(As required/ As actual) 327.296 mm
hence, required min Ld = 400 mm
use ld min 400 mm into both column and footing

Phils. Standard Reinforcing Bars Phils. Standard Reinforcing Bars


r-bar area dia. r-bar area dia.
6mm 28.27 6 6mm 28.27 6
10mm 78.54 10 10mm 78.54 10
12mm 113.10 12 12mm 113.10 12
16mm 201.1 16 16mm 201.1 16
20mm 314.2 20 20mm 314.2 20
25mm 491.90 25 25mm 491.90 25