Slab No. Total No.

of Slab 1

1250 mm Y 10 @ 175 c/c 1250 mm

D= 150 mm

Y 8 @ 150 c/c Y 8 @ 200 c/c

200 L= 5000 mm X B= 4000 mm 200 mm

One way / Two way Slab

Project :-
Name of work :-

Sr. Dia of Nos. of Length of bar Wt. Of bar Quantity In


Discription
No. bar in Bar in mm Kg/Mt Kg
mm
1 Main steel 8 28 5470 0.395 60.50

2 Distribution Steel 8 26 4470 0.395 45.91

3 End Support Main steel (Top) 10 24 3120 0.617 46.20


10 30 3120 0.617 57.75

Total Quantity of steel Dia of Kg. Quantitity of all


Bar beams (Kg)
8 106.4051 106.4051
10 103.9522 103.95216
12 0 0
16 0 0
20 0 0
25 0 0
32 0 0
Total 210.3573 210.35726

Project :-
Name of work :-

Sr. Discription No Length Width in Depth in Quantity in


No. in mm mm mm Cu.mts.
1 Concrete 1 5400 4400 150 3.564