`Compass Log Book

Well Completions and Productivity Control Card


Name: Seniority Date:

Discipline: Surface Well Testing Level: Pre-School

LMS Learning Object: CC-FS-PRE-SWT

Pre-requisites for this Control Card: Attend OFS1 School for Field Specialists.
This Control Card is mandatory for the FTS before goes to school.
All tasks are mandatory (M).

SWT Job Design Tasks

Code Task Sheet Title M/E Date Supervisor Comments

WT-JD-PS-01-L01 SWT Overview M

WT-JD-PS-02-L01 Equipment lay-out and specification M

WT-JD-PS-03-L01 Rig Classification M

All tasks are mandatory (M).

SWT Rig Up Tasks

Code Task Sheet Title M/E Date Supervisor Comments

WT-RU-PS-01-L01 Equipment handling, lifting and placing M

WT-RU-PS-02-L01 Pressure Operations M

All tasks are mandatory (M).

SWT Operation Tasks

Code Task Sheet Title M/E Date Supervisor Comments

WT-OP-PS-01-L01 Flow Head & Choke Manifold M

DWT, BSW, Draeger, Ranarex and


WT-OP-PS-02-L01 M
Hydrometer

http://ftc.pau.oilfield.slb.com/Schlumberger/Compass/FS/Control_Cards/PreSchoolFSSWT.htm (1 of 2) [27/06/2002 2:53:43 PM]


`Compass Log Book

WT-OP-PS-03-L01 Steam Exchanger M

WT-OP-PS-04-L01 Separator M

WT-OP-PS-05-L01 Gauge Tank / Surge Tank M

WT-OP-PS-06-L01 Burners/Booms M

http://ftc.pau.oilfield.slb.com/Schlumberger/Compass/FS/Control_Cards/PreSchoolFSSWT.htm (2 of 2) [27/06/2002 2:53:43 PM]


WT-JD-PS-01-L01

Surface Well
Testing
Task
SWT Overview WT-JD-PS-01-L01

If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Undestand the role of SWT operation

THEORIES:

1. Describe the main purposes of SWT jobs


2. Associate these purposes with the necessity of each equipment in a SWT
lay-out
3. Describe briefly what it is IPR and AOF
4. Be aware of which parameters influence gas and oil rate calculations

PRACTICALS:

SELF-TESTS:

REFERENCES:
1 Online training
2 Surface Well Testing FOH

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4849

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4849 [27/06/2002 2:53:49 PM]


WT-JD-PS-02-L01

Surface Well
Testing
Equipment lay-out Task
WT-JD-PS-02-L01
and specification
If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Know the basic functions of each piece of testing equipment and able to select
the correct

THEORIES:

1. Explain which factors influence a surface testing lay-out and relate them with
zone types in a wellsite
2. Explain what is zone 0, zone 1 and zone 2 referring to a wellsite
3. Draw a basic offshore lay-out for a simple job, describe the basic functions of
each equipment and specify which piping and crossovers are necessary

PRACTICALS:

1. Be able to identify different kind of piping and crossovers connections (figure,


diameter, WP)
2. Prepare a complete list of equipment for a job

SELF-TESTS:

REFERENCES:
1 FTC WT Training manual
2 FOH 1 and 2 M-831001 & M-831002
3 WCP Testing Pre-School Manual
4 POM, M-073909

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4850 (1 of 2) [27/06/2002 2:53:54 PM]


WT-JD-PS-02-L01

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4850

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4850 (2 of 2) [27/06/2002 2:53:54 PM]


WT-JD-PS-03-L01

Surface Well
Testing
Task
Rig Classification WT-JD-PS-03-L01

If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Know the difference between type of rigs

THEORIES:

1. List the different type of rigs you can be working on


2. Explain the main differences between jack-up and floater rigs

PRACTICALS:

SELF-TESTS:

REFERENCES:
1 Hydrocarbon Exploration and Production - Frank Jahn, Mark Cook, Mark Graham

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4851

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4851 [27/06/2002 2:53:55 PM]


WT-RU-PS-01-L01

Surface Well
Testing
"Equipment Task
WT-RU-PS-01-L01
handling, lifting
and placing"
If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Understand the safety precautions for crane and forklift operations

THEORIES:

1. Explain the safety procedures when lifting, handling and placing equipment
2. What is SWL ( Safe Working Load) - how is this checked and identified

PRACTICALS:

1. Coordinate a equipment loading/unloading process in a rig or at the base

SELF-TESTS:

REFERENCES:
1 POM

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4852

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4852 [27/06/2002 2:54:05 PM]


WT-RU-PS-02-L01

Surface Well
Testing
Pressure Task
WT-RU-PS-02-L01
Operations
If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Understand all the safety aspects concerning about pressure operations

THEORIES:

1. Summarize in a presentation the main points of SWT POM

PRACTICALS:

1. Execute a pressure test of a simple equipment in the location under supervision:


FH or CM

SELF-TESTS:

REFERENCES:
1 FOH
2 POM
3 FTC WT Training manual

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4853

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4853 [27/06/2002 2:54:13 PM]


WT-OP-PS-01-L01

Surface Well
Testing
Flow Head & Task
WT-OP-PS-01-L01
Choke Manifold
If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. know the principle of operation, specifications and purpose of these equipments

THEORIES:

1. List the main functions of these equipments


2. Identify type of valves used in these equipments and why
3. State the type and pressure rating of the connections on the FH & CM
4. Explain why you need to count the turns to open and close the valves

PRACTICALS:

1. Be able to change fixed chokes and regulate adjustable choke


2. Open and close flow valve by operating hydraulic actuator under supervision
3. Equipment maintenance when available

SELF-TESTS:

REFERENCES:
1 Online Training
2 Maintenance manuals M-812607 & M-812608
3 FOH 2, Sections FH & Section CM

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4854 (1 of 2) [27/06/2002 2:54:28 PM]


WT-OP-PS-01-L01

4854

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4854 (2 of 2) [27/06/2002 2:54:28 PM]


WT-OP-PS-02-L01

Surface Well
Testing
"DWT, BSW, Task
WT-OP-PS-02-L01
Draeger, Ranarex
and Hydrometer "
If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Understand the principle of operation of each of these devices


2. Associate the real importance of these measurements with the data given to the
client

THEORIES:

1. Identify each instrument and the associated measure, where and when it is used
2. Crossrelate the operation of these instruments with QHSE aspects
3. Identify the units for each output measure of these instruments
4. Associate the measures with oil and gas rates

PRACTICALS:

1. Operate each of these instruments under supervision


2. With a set of job data, check the influence of the measures learned in oil and
gas rate calulation

SELF-TESTS:

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4855 (1 of 2) [27/06/2002 2:54:30 PM]


WT-OP-PS-02-L01

REFERENCES:
1 Online Training
2 FTC WT Training manual
3 FOH2
4 Manual for Ranarex model 388 ( ID 3028635)

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4855

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4855 (2 of 2) [27/06/2002 2:54:30 PM]


WT-OP-PS-03-L01

Surface Well
Testing
Task
Steam Exchanger WT-OP-PS-03-L01

If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Know the purpose, pricinple of operation and specification of a Steam


Exchanger

THEORIES:

1. Explain why it is necessary to use a Steam Exchanger


2. Explain the principle of operation of this equipment
3. Why is the Steam Exchanger safer than Indirect Heater?
4. How is the ACV controlled?
5. What is the purpose of choke assembly?

PRACTICALS:

SELF-TESTS:

REFERENCES:
1 Online training
2 Maintenance manuals M-812607, M-812793, M-819202
3 FOH

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4856

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4856 [27/06/2002 2:54:31 PM]


WT-OP-PS-04-L01

Surface Well
Testing
Task
Separator WT-OP-PS-04-L01

If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Understand the purpose, pricinple of operation and specifications of a Separator

THEORIES:

1. Explain the main functions of Separator


2. What devices are used to improve the separation process?
3. Explain how the pressure and the level of separator are controlled
4. Explain the meter system for oil and gas

PRACTICALS:

1. Physically identify the following fluid circuits and make a sketch as you go
(note all valves and meters): Inlet system and bypass manifold, oil line, gas
line, water line, air pilot circuit and vessel safety devices

SELF-TESTS:

REFERENCES:
1 Online training
2 FOH II, Section Separators
3 SEP-SKK maintenace manuals
4 FOH for SWT

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4857 (1 of 2) [27/06/2002 2:54:33 PM]


WT-OP-PS-04-L01

4857

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4857 (2 of 2) [27/06/2002 2:54:33 PM]


WT-OP-PS-05-L01

Surface Well
Testing
Gauge Tank / Surge Task
WT-OP-PS-05-L01
Tank
If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Know the principle of operation of these equipments

THEORIES:

1. Explain what it is the purpose of a Gauge/Surge tank


2. List the main differences between Gauge and surge tank
3. Understand in which kind of jobs it is more adequate to use one or another tank
4. List the safety devices for each tank

PRACTICALS:

1. Equipment maintenance when available

SELF-TESTS:

REFERENCES:
1 Online training
2 PMP-ABA/EED Maintenance manuals
3 PMP-ECB Maintenance manual
4 FOH2, Section - Tanks M-831002

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4858 (1 of 2) [27/06/2002 2:54:34 PM]


WT-OP-PS-05-L01

4858

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4858 (2 of 2) [27/06/2002 2:54:34 PM]


WT-OP-PS-06-L01

Surface Well
Testing
Task
Burners/Booms WT-OP-PS-06-L01

If the Service or Equipment is not available in Location/District:

OBJECTIVES: Upon completion of this task, the engineer should be able to:

1. Understand the purpose and principle of operation of burning

THEORIES:

1. Explain why the oil burners makes offshore well testing practical
2. Explain which is the role of compressed air in the atomization process
3. Describe the explosion proof ignition system

PRACTICALS:

1. Physically identify the function of all items on the burner assembly

SELF-TESTS:

REFERENCES:
1 Online training
2 FOH

Created by Jean Moritz on 03 Jun 2002


Questionnaire URL:

4859

http://www.tasksheets.oilfield.slb.com/TaskSheetPrint.cfm?ID=4859 [27/06/2002 2:54:36 PM]