You are on page 1of 1071

assigned company code to company

RETAINED EARNING ACCOUN

OBC4 FIELD STATUS VERIANT


fiscal year veriant
PG FISCAL YEAR VERIANT

CALENDER YEAR VERIANT NAME PG


SAVED

ASSIGNED FISCAL YEAR TO COMPANY


SAVE

POSTING PERIOD VERIANT


document no range

fbn1
create controlling okkp
save

profit center accounting


CREATE PROFIT CENTER KE51
ACTIVATE AND CREATE COSTCENTER AND ASSIGNED PROFIT CENTER

Actvated
setting for ledger
error
fb50 entry
10000 10999 20000 Expense
11000 11999 20000 Expense
12000 12999 20000 Expense
20000 20999 30000 Revenue
21000 21999 30000 Revenue
22000 22999 30000 Revenue
30000 30999 30000 Revenue
delete compamy other ledger

assigned other ladger curruncies conversion

save
RETAINED EARNING ACCOUNT YHA DALNA HAI PROFIT & LOSS VALA ACCOUNT
y
10000 10999 20000 Expense
11000 11010 20000 Expense
11011 11011 40100 Cash Discount (Expense/Revenue/Loss)
11012 11013 20000 Expense
11014 11014 40200 Exchange Rate Difference
11015 11020 20000 Expense
11021 11021 40200 Exchange Rate Difference
11022 11999 20000 Expense
12000 12999 20000 Expense
20000 20999 30000 Revenue
21000 21019 30000 Revenue
21020 21020 40200 Exchange Rate Difference
21021 21050 3000 Vendor
21051 21051 40200 Exchange Rate Difference
21052 21090 3000 Vendor
21091 21091 40200 Exchange Rate Difference
21092 21099 3000 Vendor
2
cross compoonenet me jakr
vendor
fimm
Below setting taken care BY MM Consultant
in S/4 HANA
Define Valuation Level
save

Save
CREATION OF STORAGE LOCATION:
IMG-->ENTERPRISE STRUCTURE-->DEFINITION-->Materials Management-->Maintain storag
save

Save
Address and communication details for stroage location is optional
maintained storage location TG20

Maintain purchasing organization:


IMG-->ENTERPRISE STRUCTURE-->DEFINITION-->Materials Management-->Maintain purch

Responsible unit to procure the material fro


Purchase organization is responsible for PO
Save
Assign plant to company code:
IMG-->ENTERPRISE STRUCTURE-->ASSIGNEMENT-->Logistics - General-->Assign plant to co

Assign purchasing organization to company code:


IMG-->ENTERPRISE STRUCTURE-->Assignement-->Materials Management-->Assign purchas
Define Attributes of Material Types
IMG-->Logistics - General-->Material Master-->Basic Settings-->Material Types-->Define Att
Sap pre-defined material types are there.

Mat type Description


ROH RM
HALB SFG
FERT FG
DIEN Service
ERSA Spare Parts
HAWA Trading Goods
KMAT Configurable Material (Co
VERP Packaging'

Select the Mat type ROH and click on Copy or we ca


Save
Note :
Qty/Value Updating
If Indicator Not
If Indicator acti

Material type for SFG


HPG0 SFG
save

Save

Maintain Company Codes for Materials Management

Maintain Company Codes for Materials Manageme


IMG-->Logistics - General-->Material Master-->Basic
ABP==> Allow back posting to the previous per
We can deactivate through MM Period

Save
Plant Parameters
IMG-->Materials Management-->Inventory Management and Physical Inventory-->Plant Parameter
save

Click on save button


10.Define Valuation Control OMWM
Path : SPRO --> Material Management --> Valuation and Account Assignment --> Account Determination --> Accoun

11.Group together Valuation Areas OMWD


Path : SPRO --> Material Management --> Valuation and Account Assignment --> Account Determination --> Accoun
Click on position button
12. Define Valuation Classes OMSK
Path : SPRO --> Material Management --> Valuation and Account Assignment --> Account Determination --> Accoun

Click on Account Categeory Reference


Click on New Entries button

Click on valuation Class


Click on New Entries button
Enter
Click on Back Arrow button 2 Times

Click on Material type/ account Categeory reference


Click on Position button

save

13. Set Tolerance Limit OMC0


Path : SPRO --> Materials Management --> Inventory management & Physical Inventory --> Goods Receipt --> Set To
Click on New Entries button
Enter
Click on Back arrow button
Click on New Entries button
Click on Save button
Click on Back arrow button
Click on New Entries button

Click on save button


14.Set Tolerance Limits for Price Variance OMEU
Path : SPRO --> Materials Management --> Purchasing --> Purchase Order --> Set Tolerance Limits for price variance
Click on New Entries button
Enter
15.Set Tolerance Limits OMR6
Path : SPRO --> Materials Management --> Logistic Invoice Verification --> Invoice Block --> Set Tolerance Limits
Click on New Entries button
16.Define Automatic Status Change OMRV
Path : SPRO --> Materials Management --> Logistic Invoice Verification --> Invoice Verification in Back ground--> De
Click on New Entries button

17. Maintain Default Values for Tax Codes OMR2


Path : SPRO --> Material Management --> Logistic invoice verification --> Incoming Invoices --> Maintain Default Val
Click on New Entries button
Enter
18.Copy Change Movement Type OMJJ
Path : SPRO --> Material Management --> Inventory management and physical inventory --> Movement Types --> C
Click on Save button
Click on Back arrow button
Click on save button
Define Accounts for Materials Management OBYC
Path : SPRO --> Financial Accounting (New) --> General Ledger Accounting (New) --> Periodic Processing --> Integrati
save
material create mm01

Path : Logistics --> Materials Management --> Purchasing --> Master Data --> Subsequent Settlement --> Vendor Re
erroe
ckmstart
bp extended
saved
extended

saved changes

me21n
Vendor / Supplying Plant Known ME21N
Path : Logistics --> Material Management --> Purchasing --> Purchase order --> Create --> Vendor / Supplying Plant K
mig0
date galt li thi 3rd period me hui hai posting
mmpv
vst obyc miro eror
for shweta didi
for vendor

20003 creadit
t-->Maintain storage location.
t-->Maintain purchasing organization.

ure the material from the external vendor.


responsible for PO
>Assign plant to company code.

nt-->Assign purchasing organization to company code


Types-->Define Attributes of Material Types
rable Material (Computer, Engineer products)

k on Copy or we can create our own without copy.


If Indicator Not activated: Not possible to update both qty and value in MM and also not p
If Indicator activated: possible to update MM and possible to apply ML Actual Costing
enter
copied entery
aterials Management
rial Master-->Basic Settings-->Maintain Company Codes for Materials Management.
the previous period .
rough MM Period MMPV

-->Plant Parameters
etermination --> Account Determination Without Wizard --> Define valuation Control

etermination --> Account Determination Without Wizard --> Group together Valuation Areas
etermination --> Account Determination Without Wizard --> Define Valuation Classes
rm

sfg

fg

Goods Receipt --> Set Tolerance Limit


Limits for price variance
Set Tolerance Limits
on in Back ground--> Define Automatic Status Change

--> Maintain Default Values for Tax Codes


> Movement Types --> Copy, Change Movement types
observe
s debit
h credit
c Processing --> Integration --> Materials Management --> Define Accounts for Materials Management
ettlement --> Vendor Rebate Arrangements --> Environment --> Condition / Arrangement --> Environment --> Material --> Environment -->
switch organization

endor / Supplying Plant Known


migo
n MM and also not possible to apply ML Actual costing
y ML Actual Costing
> Material --> Environment --> Document Management --> Environment --> Bills of material --> Environment --> Material Master --> Mater
--> Material Master --> Material --> Create (General ) --> Immediately
define sales organization
3 DIFINE DIVISION
save

4 DEFINE SHIPING POINT


5 ASSIGN SAES ORGANIZATION TO COMPANY CODE

6 ASSIGN DISTRIBUTION CHANNE TO SAES ORGANIZATION


7 ASSIGN DIVISION TO SAES ORGANIZATION
SETUP SAlES AREA
ASSIGN SAES ORGANIZATION TO DISTRIBUTION CHANNE AND PANT
ASSIGN SHIPPING POINT TO PANT
save

SETUP THESTORAGE OCATION DEPENDENT SHIPPING POING DETERMINATION


DIFINE AND ASSIGN PRICING PROCEDURE
Define SD Condition types
DIFINE ACCOUNT KEYS
Assigne Condition types and Account Key in SD pricing Procedure
make 182 row

SET Customer Pricing procedures


save
ASSIGN SAES AREA TO SAES DOCUMENT TYPE
SET UP PATNER DETERMINATION
save
DEFINE PARTNER DETERMINATION PROCEDURE
SAVE

PARTNER FUNCTION NO ACTION

PARTNER FUNCTION CONVERSION NO ACTION

Define Tax determination rues


define AAG for customer code-tcode :OVK8
to post different revenue account based on cassification of customer

difine the Access sequence and account determination types

NO ACTION FROM YOUR END


DEFINE ACCOUNT DETERMINATION TYPES
NO CHANGES

DEFINE AND ASSIGN ACCOUNT DETERMINATION PRECEDURES


KOFI FI ACCOUNT DETERMINATION TYPE
IT USES SO IS NOT A COST OBJECT AND NORMA SAES FOW

KOFK CO ACCOUNT DETERMINATION TYPES


IT USES SO IS A COST OBJECT (MTO-

NO ACTION FROM YOUR END

ASSIGN ACCOUNT DETERMINATION PROCEDURE

ASSIGN ACCOUNT DETERMINATION TYPE TO THE SD BIING TYPE


̥

DEFINE AND ASSIGN KEYS

ACCOUNT KEYS ARE USED TO DETERMINE REVENUE AND SAES EXPENCES G ACCOUNTS
ACCOUNT KEYS INKED BETWEEN SD CONDITION TYPES AND G ACCOUNTS
vkoa
SAVE
REQUIREMENT---> Need to map sales expenses(sales Discount ,Rebates ,Sales Commisions)at Account Key Level
save
v/08 pricing procedures
change gl

bp extended
SAVE
HOW To extend to other Sales Area
BP Extend to sales area tg10
extended

create material

material name
and sales organization is different
BASIC DATA 2 NIL

Sales Org1
sale general plant data
export tab
import tab

MRP1
MRP2

MRP3

MRP4
ACCOUNTING 1
COSTING 1
create material
error

okb9

VL01N GOODS DELEVERY TO THE CUSTOMER


1 PICKING
2 PACKING
3 PGI
VL03N DISPLAY DELIVERY DOCUMENT
VF01 BILLING

80000248
jodocument aaye enter then save

then release
vf02
CT AND NORMA SAES FOW
20060 Local Sales-Prod
20061 Local Sales- Spare Parts
20062 Own Units Sales -Prod
20063 Local Sales-Service
20064 Export Sales -Product
20065 Export Own Units Sales -Products
20066 Export Own Units Sales -Spare Parts
20067 Export Sales-Service

ccount Key Level


Sales deductions - Local
Sales Rebates -Local
Sales Comission -Local
Sales deductions - Export
Sales Rebates - Export
Sales Comission -Export
organization is different
va01
mig0
enter and save
fbn1 error add no range
Organizational Units

Company Code1

ControllingCompany Code 2

Company Code 3
Operating Concern

Company Code 4
Controlling Area 2
Company Code 5

ControllingIt is the CO Organizational Unit and at this level it records and analyzes the overhead related activities (Cost Elemen
FI Organiz At this Level, Recording and tracking the financial transactions, book keeping and preparing or extracting the financ
AssignmentWe Can assign "n" number of company codes to one controlling area subject to the following Conditions.
1.Chart of accounts should be same between company code & Controlling area, that means the accounting structu
2.The Fiscal Year should satisfy the below conditions between the company code and Controlling area.
a) The number of Posting periods should be same (Other than the special periods).
b) The start period and end period should be the same.
C) The start date and end date of each period should be same.
1.Create CoOKKP
Path : IMG-->Enterprise structure-->Definition--> Controlling--> Maintain Controlling Area
Click on Position button
Give your Cotrolling Area
Organizational Units
save

maintained no ranges for co documents

kank
copy no range tg00 to pg00

maintained versions
KAH1 CREATE COST ELEMENT GROUP
cost center hierarchy ksh1
skf creation kko1 maximum 6 digit code
SKF GROUP MAXIMUM 10 DIGIT CODE KBH1
save

kb31n

rks error

go fiori app

manage posting period cost accounting open

kb31n
activitiy type
creation of activity type kL01
ACTIVITY TYPE GROUP KLH1
SAVE

Click on Save button


Planning

kp26
Input Planning Output Planning SKF Planning

Departmental Expenditure Planning


Or
Cost Element Planning
Cost Center Vs ActivitSKF Vs Cost Center

Activity Independent Activity Dependent Planning

Cost Element PlanningCost Element Planning With Reference to activity can be called as activity depende

Cost Center Vs Cost ECost Elemeny Vs Activity


Cost CenterS_ALR_87013611
Path : Accounting --> Controlling --> Cost Center Accounting --> Information systems --> Reports for cost centers -->

kp26
Click on Back arrow button
Click on save button
Cost CenterS_ALR_87013611
Cost ElemeKP06
Path : Accounting --> Controlling --> Cost Center Accounting --> Planning --> Cost and Activity Inputs --> Change
fiscalyear same contolling area and operating concern
Activity quantity
clean 10
labour 50
machine 200
cost center splitting structure
define spliliting stucture OKES
PATH:SPRO-->CONTROLLING-->COST CENETR ACCOUNTING -->PLANNING -->ALLOCATIONS-->ACTIVITY ALLOCATION
1636.364 4836.364
24.18182
SAVE

ASSIGN SPLITTING STRUCTURE OKEW

kp26
planner profile sapall

okew Assign splitting structure to costcenter


pg-com2

plannr profiles saapall


kp06

input plaaning cost center vs cost element planning


rate
common common 11000
labour 1000 3300 6300 42
2000

clean 5500 2200 7700 77

machine 3000 5500 8500 34


kspi

ksbt
see cost center report
related activities (Cost Element, Cost Center accounting, and internal orders), Mfg related activities (Product Costing) and also activities of
paring or extracting the financial statements like balance sheet and P&L.
ollowing Conditions.
means the accounting structure should be the same between the company code and Controlling Area.
Controlling area.
dependent cost center vs activity vs ce
independent cost center vs ce

be called as activity dependent planning

-> Reports for cost centers --> Plan & Actual Comparisions --> Cost Centers : Actual /Plan/Variance
Activity Inputs --> Change
quantity amount
10 500
50 300 50
200 1400 6
7
TIONS-->ACTIVITY ALLOCATIONS-->SPLITTING-->DEFINE SPLITTING
11005 delete from group
11010
166.6667
333.3333
500
kss4

42
t Costing) and also activities of internal units analysis or evaluation of the internal unit analysis (Profit Center accounting).
delete from group
accounting).
shweta didi k liye

distribution

Distribution
Its Possible to transfer only primary Cost elements to cost
It is uses the same orginal cost element to credit in sender side and also to debit in receiver side
Receiver side difficult to trace out originally posted amount difficult to trace out and allocated amount
3.96.0

Create Distribution KSV1


Path : SPRO --> Controlling --> Cost Center accounting --> Actual Postings --> Period End Closing --> Distribution -->

ACTUAL
RECEIVER COST CENTER
SAVE SENDER COST CENTER ENTRY
receiver cost center entry receiver me entry k bina show nhi hoga
again ksv5
cost center report

ksv1
receiver
AUR ENTRY KARKE DEKHI THI JISSE YE PTA CHLA KI FIXED AMOUNT KI HI ENTRY COST CENTER PE JAYEGI
ed amount

sing --> Distribution --> Define Distribution


just for testing
without test run
ER PE JAYEGI
Internal Order
Internal Order are used to Collect Monitor and Control the Cost Specific to project /Job/events.Other than MFG Acti
Ex : MKTPromotions
R & D Projects
Asset procurement
Internal orders can also be used for investment or AUC Assets
Ex : To Collect the asset and installation expenses an
Internal Orders can used for budgetory control purpose.
The Budgetory can be used for OH & Capital Expenditure.
It can also used to collect the dep from Rental/lease Assets.
It can also used to collect the Revenue and also the cost from specific event for information and reporting purpose.
It can be used as a real Cost object or statistical cost object.
Internal order provide more information than the cost center.
Internal order support planning , budget collect the actual cost and allocation of the actual cost either to the FI or C
Types of Orders:
1.Statistical Order It is used for information or Reporting purpose.
Budgetory Control purpose.
The Statistical Order can not be settle and not p

2.Real Order Possible to collect real expenditure and used for


Possible to maintain settlement rules
The Real order Possible to settle either to FI Exte
At the time of creation of internal order we need

Types /Classification/Categeories of IO
1.Over Head Orders It is used to collect overhead expenditure from s
It Can be created either Real or Statistical orders
The overhead real order can be settled to FI (De
Ex : Marketing Expenditure, Employee Overhead
2.Investment Orders It can be used to collect the capital expenditure
The Investment order can be settle to the either
It can also be created either Real order / Statisti
Ex : Asset procurement,AUC Assets, R&D Expend
3.Revenue Orders It is used to collect both revenue & Expenditure
It can also be called as Maketing order.
The revenues from the internal order can possib
Revenues cannot be settle to Cost Centers.
It Can be created either Real or Statistical orders
4.Accural Orders It is used to distribute the deffered expenditure
In order to avoid cost fluctuations in cost center
In this case we use accural orders to collect the e
1.Activate Order Management in Controlling Area OKKP
Path : SPRO --> Controlling --> Internal Orders --> Activate Order Management in Controlling Area
Click on Position button

Observe the order manage


Click on Save button
2.Define Order types KOT2
Path : SPRO --> Controlling --> Internal Orders --> Order Master data --> Define Order types
Click on New Entries button
save

next entry
Click on Continue (Enter) button
Click on Back arrow button
Click on New Entries button
Click on Continue (Enter)
Order type It represents grouping similsr attributes of order
It can be possible to create order under order ty

Settlement Profile The settlement profile is required for all the orde
Settlement profiles is not required for statistical
The settlement profile need to be assign in orde
Model Order It called as reference order or template order, sa
It Cannot be used as normal order and not possi
We can maintain only default values in model or
Ex : Below default values can be maintained in t
Ex : Company code, business area, plant, functio
It need to be assigned in normal order type.
During the creation of internal order, the defaul
Resident term 1 It specifies the minimum time interval thaqt mu
Resident term 2 It setermines minimum time interval that must a
Commitment Management It allows to update the commitment allow the b
The purpose of the indicator in order type when
Integrated Planning The system it update the planning of internal or
Co partner update It allocations with in CO a total record it usely pr
In order we can nfluences this process in followi
Not active In allocations between order and another object
Partly active The total records are produced in between orde
Active It is used to reduce the number of total records
3.Maintain Number Ranges for Orders KONK
Path : SPRO --> Controlling --> Internal Orders --> Order Master data --> Maintain Number Ranges for Orders
4.Maintain Planning Profile for o
Path : SPRO --> Controlling --> Internal orders -->
The planning profile purpose to maintain the overall, Cummulative planning and it specify the planning allow to be
The planning profile can contain default cost element, sender object, object currency.
Click on Back arrow two times
Maintain Planning Profile for order type KOAP
save

Maintain Number range for overall planning OK11


Path : SPRO --> Controlling --> Internal orders --> Planning --> Manual Planning --> Maintain Number range for over

Maintain Budget Profile OKOB


Path : SPRO --> Controlling --> Internal orders --> Budgeting and Availability Control --> Maintain Budget Profile
ignore

save

Enter
Budgeting &It is nothing but approved planning to
To Control the expenditure within pla
Budget can be maintained only at the
Not Possible to maintain the budget a
Budget can be able to maintain cumm
In Internal order we can control the b
The Availability control functionallity
With the help of tolerance limit along
Budget can be maintained for both Re
W e can control the budget through t
Budget ProfIt is required to enter the budget aga
Budget profile need to be assigned to
Time FramIt Control for Which Year Allow to ma
It Also Controls the overall budget & a
Total ValueIt Indicators allow to maintain the bu
Annual ValIt Indicators allow to maintain the bu
If both indicator is activated then can
Over all If Indicator is not activated the availa
If Overall indicator is activated then a
Click on Back arrow button two times
Maintain Budget profiKOAB
save

Define Tolerance Limits for Availability Control


Path : SPRO --> Controlling --> Internal orders --> Budgeting and Availability Control --> Define Tolerance limit for Av
Click on New Entries button
save

In this step we can sepcify how the system delete i:e, either trigger warning or error message in case if budget is ex
In this step we need to specify which business transactions type need to be check again budget and ehat percentag
Absolute variance It represents value in terms of amount.
The System it allows the transaction to the exte
Specify Exempt Cost Elements from Availability Control OPTK
Path : SPRO --> Controlling --> Internal orders --> Budgeting and Availability Control --> Specify Exempt cost elemen
Click on New Entries button

save

Enter
Note : In the step we can specify the which cost eleme
Set up Availability Control again KO31
Path : SPRO --> Controlling --> Internal orders --> Budgeting and Availability Control --> Set up Availabilty Control ag
Activate Commitments Management OKKP
Path : SPRO --> Controlling --> Internal Orders --> Activate Commitments Management

save

Activate Open - Item Managemen


Maintain Allocation Structure OKO6
Path : SPRO --> Controlling --> Internal Orders --> Actual Postings --> Settlement --> Maintain Allocation Structure
Allocation Structure It Contains the assignment and each assignment
Each assignment specifies which receiver catege
Ex : Cost Centers, Orders, EBS Element, COPA, Fi
Allocation structure need to be assign in the sett
Allocation structure is required ( for all the orde
1.Mfg Orders Allocation structure not required in normal prod
a) Joint & by Product Allocation structure is required to settle the valu
It represents main product & by product.
b) Sales order is non valuated stock (MTO) Allocation structure is required to settle the valu
2. Other than Mfg Orders Allocation structure is required to settle the valu

save
save & back arrow

click on back arrow two times


save
By Cost Element If Indicator is activated then same source cost el
Settlement Cost Element It is used separate cost element to credit in send
Maintain Source Structure OKEU
Path : SPRO --> Controlling --> Internal Orders --> Actual Postings --> Settlement --> Maintain Source Structure
Click on New Entries button

Click on Assignments
Click on New Entries button
save

Click on Save button


Source Structure It Contains the assignment .Each assignment it r
Purpose It Contains the different distribution rules & rece
By using source structure in order settlement ro
Maintain Settlement Profiles OKO7
Path : SPRO --> Controlling --> Internal Orders --> Actual Postings --> Settlement --> Maintain settlement profile
save
save
Enter
SettlementIt Contains the settlement parameters which required to maintain settlement rules and also to settle the orders.
It specifies which receiver categeory allow to settle and also it specify which type of the distribution rules allow to b
It specify allow to transfer variance to costing based co-pa or not.
It specify which default document type is used to post the settlement.
It specify how many maximum distribution rule allow to maintain in settlement group.
It Contains default values like (Allocation , source , PA Transfer Structure, default objective types)
It Controls the settlement rules in order and also it specify weather the order is relavent for settlement or not.
Settlement profile need to assign in order type.
Enter Settlement Profile in order types KOAL
Path : SPRO --> Controlling --> Internal Orders --> Actual Postings --> Settlement --> Enter Settlement profile in order types
Enter
Maintain Number ranges for settlement documents KO8N
Path : SPRO --> Controlling --> Internal Orders --> Actual Postings --> Settlement --> Maintain Number Ranges for settlement d

Click on Maintain Groups button


From the menu bar select Group --> Insert

Click on Save button


Scenarios :
1.Internal FI - Deffered Expenditure
Co - Cost Center

1.Create Internal Order


2.Over all planning
3.Planning Cost Elements / Activity inputs change
4.Maintain Internal order budget
5.Change supplement
6.Reduce the budget
7.Post Document
8.Activity Allocation
9.Goods issue to Internal order
10.Actual Activity Price tbk,m v c
11.Individual Processing

1.Create Internal Order


2.Maintain Over all planning KO12
Path : Accounting --> Controlling --> Internal orders --> Planning --> Over all values --> Change

click on countinue & enter


click on save button

3.Planning Cost Elements / Activity inputs change KPF6


Path : Accounting --> Controlling --> Internal orders --> Planning --> Cost and Activity Inputs --> Change
Click on Save button
Create Planning Layouts for Cost Element Planning KPG5
Path : SPRO --> Controlling --> Internal orders --> Planning --> Manual Planning --> User-Defined Planning Layouts --
Maintain User - Defined Planner Profile KP34
Path : SPRO --> Controlling --> Internal orders --> Planning --> Manual Planning --> User-Defined Planning Layouts --
ko22 maintain budget

check budget factor in fb 50 entry

optk code me 11001 cost element ko budget se free rakha hai


KO03 ACTUAL AND PLAN COMPARISON
change currency

rpc0
maintain settalement rule ko02

click on settlement rule


save

ko88

save
COST CENTER REPORT

model order konk


Assign no range

kom1 create model order

KOM1
Assign model order to io order type
save

create asset setting & auc internal order


events.Other than MFG Activities

and installation expenses and later to capitalize the assets.

tion and reporting purpose.

ual cost either to the FI or Co Objects.

tion or Reporting purpose.

can not be settle and not possible to maintain settlement rules.

al expenditure and used for budgetory control purpose


settlement rules
ble to settle either to FI External Settlement (G/L A/C, AUC , Fixed assets) either to CO Object (Cost Center, Internal orders, service COPA, S
on of internal order we need to specify or Activate statistical indicator to create the statistical order

verhead expenditure from specific job or Event within in the Short term.
her Real or Statistical orders.
rder can be settled to FI (Deffered Expenditure G/L A/C)or CO Object Cost Center, Internal orders service Orders, Maintainence Orders)
nditure, Employee Overhead, Sales promotion Advertisement.
ect the capital expenditure I;e, Asset Procurement, Installation Cost or R&D Expenditure.
er can be settle to the either AUC Asset, or Main Asset.
d either Real order / Statistical Order.
ent,AUC Assets, R&D Expenditure.
oth revenue & Expenditure from the specific promotional activity or event for information and analysis is purpose.
as Maketing order.
he internal order can possible to settle COPA, or orders with revenue we can transfer to G/L A/Cs.
settle to Cost Centers.
her Real or Statistical orders.
e the deffered expenditure across the periods within CO.
t fluctuations in cost center Accounting, the cost distributed and regular basis periodically for each individual period through out the perio
ccural orders to collect the expenditure
Observe the order management is Active
nter) button
ng similsr attributes of orders and also it controls order number ranges it control the order master data fields and it contains default values
create order under order type all default parameters copied from order type to order it assigns number to order.

le is required for all the orders if we want to settle the values.


s not required for statistical order.
le need to be assign in order type.
order or template order, sample order.
normal order and not possible to post any expenses again the model orders.
y default values in model orders.
lues can be maintained in the model orders.
business area, plant, functional area, Profit Center, default currency, Statistical indicator, RA Key, Costing sheet, OH Key, Investment profile
d in normal order type.
of internal order, the default values or copy from the model orders to the normal orders.
mum time interval thaqt must allows the between setting the deletion indicator class with revocable and setting the final deletion indicato
um time interval that must allows between settle the final deletion indicator and unrevocable reorganisation object (Moving to another sy
he commitment allow the budget for the order.
ndicator in order type when it change the indicator in order type the change is valid immediately for all existing orders in the system which
e the planning of internal order to the dependent object cost center , profit center.
CO a total record it usely produce for each sender & receiver combination.
ences this process in following ways.
en order and another object
e produced in between order for each combination but it wont generated the total records between the order and cost center.
he number of total records and increase the storage capacity.

er Ranges for Orders


OKOS
rolling --> Internal orders --> Planning --> Manual Planning --> Maintain Planning Profile for overall Planning
fy the planning allow to be maintain for how many years in future, Past and also it controls weather allow to maintain cummulative plann
tain Number range for overall planning

Maintain Budget Profile


ng but approved planning to execute the project
l the expenditure within planning.
n be maintained only at the order level.
ble to maintain the budget at the cost element level.
n be able to maintain cummulative as well as annual budget.
l order we can control the budget by using the availability control functinality.
ability control functionallity it checks the every transaction again the budget weather budget is available or not.
help of tolerance limit along with messages we can generate error or warning message if budget is exceeded or crossing the specify tolera
n be maintained for both Real & Statistical orders.
ontrol the budget through the availability control along with tolerance control and also message control.
red to enter the budget again the order.
ofile need to be assigned to order type.
for Which Year Allow to maintain the budget how many years budget in the Past & Future.
ntrols the overall budget & annual budget or Both.
ors allow to maintain the budget cummulative.
ors allow to maintain the budget yearly.
dicator is activated then can able to maintain the budget both cummulative as well as annual.
r is not activated the availability check it check the again the annual budget.
indicator is activated then availability control will be verify again the cummulative budget.
ack arrow button two times
Define Tolerance limit for Availability Control
ssage in case if budget is exceeding or recharged
budget and ehat percentage of usage the budget to be trigger warning and error message.
n terms of amount.
the transaction to the extend of absolute variance in addittional to budget.

Specify Exempt cost elements from Availability Control

pecify the which cost element to the excluded from the budget.

Set up Availabilty Control again


KOAO
ntain Allocation Structure
nment and each assignment represents the group of the source cost element and further it is specifies which settlement cost element to b
cifies which receiver categeories allow to be settled .
ders, EBS Element, COPA, Fixed Assets, Sales Document ite, G/L Accounts.
need to be assign in the settlement profile.
is required ( for all the orders settlement cases) in the below business cases.
not required in normal production orders cases except the joint and by product and non Valuated sales order stock scenario.
is required to settle the values from the production order to the production order item level.
roduct & by product.
is required to settle the values from the production order to the sales order .
is required to settle the values from the internal order, Sales order , WBS Element, service orders, maintainence orders, Quality orders.
SOUREC ME T2 ASSIGN KARENGEY
ed then same source cost element it works as a settlement cost element to credit in sender side and the debit in receiver side.
ost element to credit in sender side and to debit in receiver side.

ntain Source Structure


nment .Each assignment it represents the grouping of cost elements.
ent distribution rules & receivers according to group of cost element compulsory you want to need to maintain source structure.
cture in order settlement role, we can maintain different distribution rules & receivers based on grouping of cost element.

ntain settlement profile


also to settle the orders.
distribution rules allow to be used in settlement rules(% Settlement, equilance numbers, amount settlement).

t for settlement or not.

nt profile in order types


assign controlling area in group

ber Ranges for settlement documents

KO01
KO12
KPF6
KO22
KO24
KO26
FB50
KB21N
MIGO
KBK6 ttr5 vvbbbnn,.
KO88

KO01
puts --> Change
Defined Planning Layouts --> Create Planning Layouts for Cost element Planning
Defined Planning Layouts --> Maintain User - Define Planning Profile
GALTI SE USD ME BUDGET KR LIYA UPR SE OBJECT CURRENCY LENI THI
OMPARISON
SCREEN SHORT DEFFERENT SHEET
How to settle plan internal order to ctr bhai se puchna hai
nternal orders, service COPA, Sales order).

ers, Maintainence Orders)

l period through out the period.


and it contains default values.

eet, OH Key, Investment profile, default settlement receiver, settlement rule.

tting the final deletion indicator with revocable


object (Moving to another system physically from current system to the archiving system.

ting orders in the system which belong to order type.

er and cost center.


o maintain cummulative planning or annual planning or both.
or crossing the specify tolerance limit.
h settlement cost element to be used to Credit in the sender side and to be debit in the recever side

r stock scenario.

nce orders, Quality orders.


bit in receiver side.
ain source structure.
cost element.
back arrow
Save

Below prequest settings to be completed before assignement of Chart o


1 Adopt APC values
2 Adopt Dep terms
3 Specify the Parallel currency for Dep areas
4 Assigne Tax codes to the Company codes
5 Assigne Chart of Dep to the Company codes
6 Define Depreciation Areas for Foreign Currencies

2 Adopt APC values


save

Save Need to be activated Identical indicator for all parallel cu


Identical Indicator is optional for Stastical Dep Areas
Not possible to adopt the values for Parallel dep areas in

Specify Transfer of Depreciation Terms

Note:
Need to be activated Identical indicator for all parallel currency d
Identical Indicator is optional for Stastical Dep Areas
Not possible to adopt the values for Parallel dep areas in S/4 HAN
Save
Assigne Tax codes to the Company codes
Assign Input Tax Indicator for Non-Taxable Acquisitions

Save
Assigne Chart of Dep to the Company codes
Save

Define Depreciation Areas for Foreign Currencies


We will specify the currency for parallel currency dep areas
save

Account determination
Account determination is used to determine the Asset GL accounts whil
Account determination it groups the multiple GL accounts which is requ
Account determination contains the list of GL accounts which is used wh
We can recommend to use separate account determination for each typ

Account
Determination
Y000 Land
Y100 Building
Y200 Plant& Machinary
Y300 Furniture&fittings
Y400 Vehicles
Y500 Capital work in progress (Asset Under Construction)
save

save

Save
Create Screen Layout Rules
It controls the asset Master data Fields other than Depriciation Area Fie
Which master data field is required / optional / supress/display
One screen layout can be assigned to multiple asset class or can be defin

Screen LDescription
Y0 Land
Y1 Building
Y2 Plant& Machinary
Y3 Furniture&fittings
Y4 Vehicles
Y5 Capital work in progress (Asset Under Construction)

save

Define Number Range Interval

To assign number to asset ( Asset codification)


We can define maximum up to 12 digit code either numeric or a
Asset number range can be defined at company code
Number range interval assigned to the asset class
Single number range grp can be assigned to multiple asset class

Define Asset Classes

Clasification of assets ( Classify the assets)


It controls the asset master data fields and also assigne number to asse
It contains the default values
1 Number range
2 Screen layout
3 Account determination
4 Depreciation terms

Asset class defined at Global level


Same asset class can be used across the company codes and also across
We need to activate asset class for the specific chart of deprecation.

Asset class Name

Y000 Land
Y100 Building
Y200 Plant& Machinary
Y300 Furniture&fittings
Y400 Vehicles
Y500 Capital work in progress
Both are Relevant for AUC asset class

Line item Settlement


AUC Assets without Investment Mgt >> More Manual AUC asset with In
AUC asset class with line itm settelement
Collect Capital expenditure and post to Internal order
Settele IO to AUC
>> Need to create AUC asset manually
>> need to maintain Settlement Rules manually for Inernal
>> Distribution(Settelement) rules need to be maintained
>> Settelement of Internal Order ( Amount transferred from

Settle AUC asset to Main asset ( Transfer the values from


>> Create Main Asset manually
>> AUC settlement rules manually to be maintained in AUC
>> Settlement of AUC asset to Main Asset

AUC Asset Class


Status of AUC
Line Item Settelement
Inestment Measure

OptionAUC Asset Class with Line Item Settelement


Scenario 1: Without Internal order / Project (Without using C
Need to create AUC asset manually
Day to day transactions posted against AUC Assets
Example : Material exp , Overhead , misc exp , Proc
Once AUC becomes completion stage then we will transfe
Need to create Main Asset
Need to maintain settelement rules for AUC asset t
Settele AUC asset to main asset

Scenario2 : With Internal Order / Project Without Investment


more manual activities involved in this process
Create IO (Internal Order)
Collect all the capital expenses or day to day expenses ag
At the end of the month , We need to settele these value
Need to create AUC asset Manually
Then need to maitain settelement rules manually f
Need to perform settelement of the IO ( Values tra
Once AUC is completed as Complted stage Then need to s
Need to create Main Asset
Need to maintain settelement rules for AUC asset t
Settele AUC asset to main asset

Is it manadatory to settele values from IO/WBS to AUC on every

Example1 Project-Construction of Building

01.11. Mat e20000 ----> FI entryDr. Mat expenses


10.11. Misc E 5000 Cr. Stock

---> Fi entry for Misc Exp


Dr. Misc expenses
Cr. Vendor ?bank

P&L Statement
Mat Ex20000
Misc E 5000
To of ### ===> transfer ( settelement) vaues from IO to CW
FI entry
Dr. BS-CWIP(
Cr. P&L -Off
BS
CWIP 25000

ConclusNeed to setteled every month from project to the AUC as


OptionAUC Asset Class with Investment Measure( Investment Management)

Scenario1 : With Internal Order / Project With Investment Ma


More automation process
1 Create Investment Order ( Internal Order)
Investment order creates AUC asset Automatically
Not possible to create auc asset manually
All capital expenses collected against Investment O
2 At the time of settelement of Investment Order , Settelem
3 Once Asset is completed stage then need create Main ass
4 Need to maintain setelement rule in the investment orde
5 At the time of full settelement of Investment Order , The

Other benefits wih Investment Measure :


1 We can specify capitalisation rules differenly for each dep
Example:
Which expenses allow to capitalise and to what %
2 Request for Budget , Approvals and rejections possible

Specify Chart-of-Dep.-Dependent Screen Layout/Acct Assignment


Case1
Company Y10 Y11
Chart of D COD1 COD1
Asset Class Asset Asset class Y100
OP chart o OPCOAOPCOA1(YOP)
Not possible to use different Account determination and screen

Case2
Company Y10 Y11
Chart of D COD1 COD2
Asset Class Asset Asset classA1
OP chart o OPCOAOPCOA1

possible to use different Account determination and screen layo

Case2 Example

COD1
Account
Asset dtermination1

COD2
Account
Specify
Asset dtermination2
Chart-of-Dep.-Dependent Screen Layout/Acct Assignmen

To apply different Account determination and screen layout depends


Business Use Case:
Assume Different Companies using different COD and using sam
In this case one of the Company code need to use the different G
We can address in Two ways
Opion Different copanies using different COD but using s
Use different Account determination for the speci
In this case , all other company codes uses Asset c
OR
OptionCreate New asset class for Specific Company
Need to define separate asset class for specific COD
Possible to maintain different account determinati

Better to use Option2

AO90 Mapping of the GL accounts to combination of account determination ,


Test Case5 IO (real order)with Investment Management
No difference between ECC and S/4 HANA

Capitalising asset only through Investment orders

More Automation process and reduced Manual Work


AUC asset or Main asset possible to capitalise only through Inves
Not possible to post entries / expenses directly to AUC or Main A
All transactions posted against Investment order and later settel
Investment order controls the Budget
We can have capitalisation rules for each Accounting principle w
Each Dep Area wise( accountng principle wise)===

Process Steps :
1 Creation of Investment Order
Investment order crates AUC asset autom
2 Maintain Budget for Investment Order
3 Procuremt of material / semifinished assets against Inves
FI entry CO entry
Dr. Mat Exp Dr. Investment Order
Cr. GR/IR

4 KB21N Confirmation of Activities against Investme


FI entry CO Entry
Dr. Activity GL(Lab) Dr. Investment Order
Cr. Activity GL(Lab) Cr.CC

5 Reached month end still asset not yet completed


Complete Period End Process
1 Perdend process in FI
2 Perdend process in CC
1 Actual Acty Price Calculatio
3 Perdend process in IO
1 Revaluation of Acty
2 Actual OH calculatio
3 Settelement of Inve

4 in case if Asset is completed


now need to settele
1
2
3
Configuration for Investment Order
1 Configuration in AA
1 Need to create AUC asset class with Investment Measure indicat
2 Need to perform settings for Investment Order

Need to create AUC asset class with Investment Measure indicator


Define Asset Classes
Investment Measure

Assets integrated with Investment Orders


Not possible to creates assets manually with Spec
Investment Order creates AUC Assets automatica
Not possible to post transactions directly to the A
We can post values to the AUC assets only Throug

Determine Depreciation Areas in the Asset Class


Screen layout field status control for R3 screen layout
Define Screen Layout for Asset Master Data
save

AO90 Assign G/L accounts to New Asset class


KOM1 Define Model Order
Assigne Model Number to Investment(Internal Order) Order Type( IO t
Save
Define Investment Profile

Configuraion:
Asset Class ' <=== ===> Capitalisation Rules
| Capitalisation Ver
|
Investment Profile (Measure) Capitalisation Ver
Model Order----> Investment Order

Define Investment Profile


Assign Investment Profile to Model Order back arrow
Investment order uses the model order to determine Inve
Investment Profile having Default AUC Asset Class
Investment Order uses the Investment Profile AUC asset

Define Capitalisation Versions

Investment order uses the model order to determine Inve

ko01
error
t code FAGLGVTR
try fb50 entry
io auc old created

go extras create asset auc


ko88
not solve my problem
signement of Chart of Depreciation to the Company code

n Currencies
tor for all parallel currency dep areas
stical Dep Areas
Parallel dep areas in S/4 HANA as Every dep area treated as independent dep areas hence alwa

all parallel currency dep areas


ep Areas
dep areas in S/4 HANA as Every dep area treated as independent dep areas hence always shou
pg10

rency dep areas


set GL accounts while posting asset Transactions
counts which is required while posting asset transactions
unts which is used while posting asset transactions
mination for each type of Asset clasification

er Construction)
Depriciation Area Fields.
al / supress/display
t class or can be defined separately for each Asset class wise
truction)

e either numeric or alpha numeric code.


pany code
multiple asset class

igne number to asset


odes and also across the chart of depreciation areas
rt of deprecation.
Investment Measure
AUC asset with Investment Management(Measure) >> More Automation
AUC Asset with Investment Management
At the time of Investment order Creation ===>AUC asset creates Automatically
All the Capital Expenditure Day to Day collected against Investment order
Not possible to post values directly to the AUC asset
We can transfer values from Investment order to AUC asset through the
settlement of Investment order
At the time of Settlement investment order , settlement rules create automatically for

once Asset completed ,we can settle values from AUC to Main Asset through
the Investment order settlement
Main Asset manually / automatically can be created then Assign main asset to Investm
Settlement rules to settele values from aUC to the main asset
Possible to maintain different capitalisation rules as per each depreaciation area / Acco
Example : Misc expences should not allow to capitalise for USGAP but should be

t (Without using CO account assignement)

AUC Assets
ad , misc exp , Procurement of incomplete assets
hen we will transfer values from AUC asset to the main Asset

ules for AUC asset to settele values to the Main asset

ithout Investment Management ( Inestment Measure)


in this process

to day expenses against IO


settele these values to the AUC asets if the asset is not completed

nt rules manually for the IO to settele values to the AUC asset


the IO ( Values transferred from IO to AUC asset)
age Then need to settele AUC to the Main Asset

ules for AUC asset to settele values to the Main asset

BS to AUC on every month?

at expenses P&L 20000


BS 20000

isc expenses P&L 5000


ndor ?bank BS 5000

ues from IO to CWIP ( Capital work in progress)


CO Entry
25000
25000 Cr Internal Order/ Proj25000

oject to the AUC asset


ent Management)

ith Investment Management ( Inestment Measure)

sset Automatically
manually
ainst Investment Order
nt Order , Settelement Rules creates Automically for AUC Asset To settele the values
ed create Main asset manually
e investment order for the main asset ( manual activity)
stment Order , The values transferred( setteled) from AUC asset to the Main asset au

erenly for each dep area wise( Accounting principle wise)

lise and to what % allow to be capitalised for each accounting principle wise
ections possible
ination and screen layout . The reason is that using the same COD(chart of Depreciati

on and screen layout. The reason is that using the differentCOD

n layout depends on COD and Asset Class

COD and using same Asset class and Same COA across the company codes
use the different GL accounts to address specific legal / other reporting requiremen

nt COD but using same Asset class and Same COA


ation for the specific COD and asset class
codes uses Asset class Account determinations irespective of the COD

fic Company
ass for specific COD
count determination at asset class level

ount determination , Dep area and COA


tment orders

nual Work
se only through Investment Orders
ctly to AUC or Main Asset
order and later setteled from Investmnt order to AUC or Main Asset

counting principle wise(Dep Area Wise)


ng principle wise)===> We can specify which cost ( values) to be capitaised or not to be capitali

tes AUC asset automatically( At the time of creation of Investment Order)


d assets against Investment order ( Creation of PO with ref to Investment order)

estment Order

ities against Investment Order

estment Order

et completed

ess in CC
Acty Price Calculation

Revaluation of Acty for Investmnt Order


Actual OH calculation
Settelement of Investmet Orders
Investment orders creates AUC settelement rules automatically at the time of settelem
fI entry CO entry
Dr. AUC Asset
Cr. Off AUC Settelement(IO)-CE22 Cr. Investment Order

if Asset is completed in next month


now need to settele or transfer from AUC asset to Main Asset
AS01 Create Main Asset Manually
KO02 Maintain settelement rules for Main assets with Settelement Type FUL i
KO88 Settelement of Investment order with settelement typeFUL
Investment order settele the values from AUC asset to the Main Asset
Dr. Main asset
Cr.AUC Asset

ment Measure indicator

easure indicator
s manually with Specific asset class which is activated with Investment Measure
UC Assets automatically
tions directly to the AUC Assets
UC assets only Through Investment Order Settelement
n layout
r) Order Type( IO type)
alisation Rules
Capitalisation Version1 ====> Dep area1 USGAP

Capitalisation Version2 ====> Dep area2 IAS


der to determine Investment Profile
UC Asset Class
nt Profile AUC asset class to create AUC asset

der to determine Investment Profile


crtd is not allowed
FAGLGVTR
dep areas hence always should be blank as Valueadd

as hence always should be blank as Valueadd


Automatically

ate automatically for investment order to settele to the AUC asset

et through
main asset to Investment order in the

eaciation area / Accounting principle wise


USGAP but should be allowed for Local GAP and IFRS
o settele the values from Investment order to the AUC asset

the Main asset automatically

ciple wise
chart of Depreciation) and Chart of account

y codes
orting requirement
d or not to be capitalised or to which % to be capitalised
the time of settelement of Investment Order

ttelement Type FUL in the Investment Order Settelement rules


typeFUL
t to the Main Asset
save

Assignement of CE to the cost component structure

GBB-VBR Material Consumtion CE


GBB-VBO Material Consumtion for Sub contact CE
FRL Freight Charges
Acty CE 43CE
Costing Sheet CE 41CE
Update of Aditive costs
To group and display aditive cost break up
We will map during aditive cost scenario

Transfer Structure
its applicable to map the link between source cost compent with
In this case , we will assigne CE only to the source cost componen
This scenario applicable if designed more than one cost compon
Option1 Not required Transfer structure
Need to assigne Ce for each cost component stru

Option2 With Transfer Structure Option


Need to assigne CE to the one Cost component st
We will map link btween Source cost component
All source cost component need to be mapped to

Note : Recomend to use option1


Save

Assignment: Organiz. Units - Cost Component Struct

Assignements=======> Cost component Structurs can be assign


Possible to maintain and assigne different cost com
We would recommend to maitain uniform cost cm

We can have Maximum one Main costcomponent


save

Need to map the primary split in the Versions


in our case , Aux str to be assigned in the Versions====>OKEQ
save

Standard value key


Std value key specifies how many activities allow to be us
Each Std value key permites Maximum upto 6 activities
Same Std value key can be assigned to the multiple Work
Work center can have only one Std value Key
Std value key having default parameters

Step1 Define parameters


We need to define separate parameter for each acty wis
We need to specify UOM( dimensions) , source for

ParameActy T Description
Y10 100 CLEANING ACTIVITY
Y20 200 LABOUR ACTIVITY
Y30 300 MACHN ACTIVITY
Y40 400 ASSEMBLED ACTIVITY
Y50 500 PAINTING ACTIVITY
Y60 600 PACKING ACTIVITY
Y70 700 Inspection Activity
YOQ Operational Qty
YBQ Base Qty Purpose
pgo Base Qty
To use in Work center Formulas

Define Std Value Key


Create separate Std value key for each set of activities ( G
We can have maximum 6 activities per Std value Key

Std Value Key Default Parameters ( Activities)


tg10 c100 CLEANING ACTIVITY
tg30 200 LABOUR ACTIVITY
tg1 tg20 300 MACHN ACTIVITY
save

Work Center Formulas Work Center Form

Can be used for the the below cases


1 To calculate Execution time
2 To determine capacity determination
3 To determine & plan scheduling acty

Types of Work center formulas


1 Set up Time
It shoun't vary based on lot size of productio
It should be constant
2 Processing time
It should proposinately to be increased base
It should be variable nature
3 Tear Down
Work center / work location need to be brin
It shoun't vary based on lot size of productio
It should be constant

Need to define work center formulas for each activit

100 Cleaning Activity


200 Labour Acty
300 Mechine Activity
400 Assembling Activity
500 Painting Activity
600 Packing Activity
700 Inspection Activity

100 Cleaning Activity


Define formulas as fixed nature
It wouldn't vary based on lot size of producti
Cleaning for 1HR
Cleaning for 1Hr
Define formula for Cleaning Activity
tg10 100 Cleaning Activity
Define formulas as fixed nature
It wouldn't vary based on lot size of production
Cleaning for 1HR
Cleaning for 1Hr
pg20 300 MACHN ACTIVITY
Acty time specified in Operation X operation (Yield ) confirmation/ Bas
(Y30 XYOQ)/YBQ

pg30 200 LABOUR ACTIVITY

Requirement ===> Proposinately increase time bas

Lot Size Lot size


1pc 10pc
Lab 1Hr ??? ====> Need to specify throug
Example1:
Acty time specified in Operation X operation (Yield ) confirmatio
(Y20 XYOQ)/YBQ
(1hr X 10PC)/1PC =10Hr

Or
Example2 Semi varible nature
Base time + 50% proosianately increase

Y20 + 50%(Y20XYOQ)/YBQ
1hr +50%X(1hrX10PC)/1PC
=1r+5Hr=6Hr

Example1:
Acty time specified in Operation X operation (Yield ) confirmation/ Bas
(Y20 XYOQ)/YBQ
(1hr X 10PC)/1PC =10Hr
work center
Master Data required to perform Std cost estimate (Material Cost estimate)

1 CO Master data
1 Cost Center Master
2 Activity Type
3 Assignement of Acty type to the Cost center (KP26)
2 MM Master Data
1 Material Master
2 Purchase Info Records
3 PP Master Data
1 Work Center
2 BOM
3 Routing
4 Production version
4 Run Cost estimate

PP MasterData

Work Center
Created At Plant Level
BOM
Created with combination of Material per Plant
We can have multiple BOM for the same combinaton of m
Routing
Created with combination of Material per Plant
We can have multiple routings for the same combinaton

CR01 Work Center


Can be also called as Work stastion
Can be represented the place where the work perf
Work center represents combination of Manpower
Entire room can be represened as one work
or
Entire room can be bifricated into multiple w

Work center defined at plant Level


Note : Not required Technology and Groups

cro1

work center pg2


MATERIAL
Material Master

BOM Y_105 FGX 1PC


1 Y_301 RMX 5 PC
2 Y_302 RMY 3 PC

Material Master required to create BOM

Y_301 RMX
Y_302 RMY
MM01 Create MM Y_105 FGX
accountin 2 blank
costing 2 blank
BOM Bill of Material
It contains list of components(Input materials) along with planne
BOM created at Material and Plant Combination
Possible to create Multiple BOM for the same combination of ma

CS01 Create BOM


CS02 Change BOM
CS03 Display BOM

CS01 Create BOM


double click on material
cs03
Display of BOM
cs01 create bom
Routing
It contains sequence of process steps ( Operations) and it contain
Routing defined at Material per Plant combination
Possible to create multiple routing for the same combination of M

CA01 Creation of Routing


CA02 Change of Routing
CA03 Display of Routing
error
op50
CA03 Display Routing
ca01
save
for Sub contact CE
ost scenario

ce cost compent with Target cost component which belongs to the different cost component str
ource cost component and not required to assigne CE to the target cost component
an one cost component structure

cost component structue wise

e Cost component structure ( Main Cost Component Str) and not required to assigne CE to the o
rce cost component with target cost component
eed to be mapped to the targt cost component.
ucturs can be assigned to the combination of Company code + Plant + Costing Variant
different cost component structue depends on the Plant But not possible to read co
in uniform cost cmponent( Single cost component str) across the plants at least with

n costcomponent str and one Auxuallary cost component str for the combination of
===>OKEQ
ities allow to be used and gives the defination ( Meaning ) of each activity
m upto 6 activities
the multiple Work centers.
lue Key

r for each acty wise which are going to use in routing( work center)
nsions) , source for data ( the values to be read from where for the specific paramete

Purpose to use in work center formulas


pgo Operational Qty
Operational qty Can be called as yield confirmation

set of activities ( Group of Activities)


Std value Key

s ( Activities)
NING ACTIVITY
UR ACTIVITY
HN ACTIVITY
Work Center Formulas Work Center Formulas

Can be used for the the below cases


1 To calculate Execution time
2 To determine capacity determination
3 To determine & plan scheduling acty

Types of Work center formulas


1 Set up Time
ot size of production It shoun't vary based on lot size of production
It should be constant
2 Processing time
o be increased based on lot It should proposinately to be increased based on lot size
It should be variable nature
3 Tear Down
on need to be bring to the Work center / work location need to be bring to the norm
ot size of production It shoun't vary based on lot size of production
It should be constant

or each activit Need to define work center formulas for each activity

100 Cleaning Activity


200 Labour Acty
300 Mechine Activity
400 Assembling Activity
500 Painting Activity
600 Packing Activity
700 Inspection Activity

100 Cleaning Activity


Define formulas as fixed nature
lot size of production It wouldn't vary based on lot size of production
Cleaning for 1HR
Cleaning for 1Hr
e of production

wrong formula
) confirmation/ Base qty

y increase time based on lot size of production

d to specify through Work center formula


(Yield ) confirmation(Lotsize)/ Base qty

Routing 1Hr for1PC


Proposinately increate time 50% according to lot size of Production
10PC 1HR +50% (1hr*Lotsite/Base qty)
1Hr +50%.1hr*10PC/1PC
1Hr +5Hr =6Hr

) confirmation/ Base qty


ial Cost estimate)

t center (KP26)

per Plant
me combinaton of material and plant ( Can be called as alternative BOM)
per Plant
same combinaton of material and plant ( Can be called as alternative Routings)

here the work performed


ation of Manpower and mechines
sened as one work center

ted into multiple work centers


als) along with planned qty required to build product

me combination of material per plant ( can be called as Alternative BOM)


rations) and it contains work center and what activities to be performed at each operation level

ame combination of Material per Plant ( can be called as alternative Routing)


50000108
nt cost component structure
mponent
to assigne CE to the other cost component str.
nt + Costing Variant
possible to read cost cost estimate between the plantswhich belongs to different cos
plants at least within the company code.

he combination of Company code + Plant + costing variant


activity

specific parameter)
r Formulas

duction
d based on lot size of production

e bring to the normal stage after complection of process on specific mechn/ work loc
duction

oduction
oduction
ve Routings)
each operation level and planned time required to perform the Task
ngs to different costcomponent structure.
c mechn/ work location
costing sheet

Costing Sheet ====> To calculate Indirect OH


Template Allocation ====> To calculate Indirect OH , Direct OH
Product cost
==> BOM X Rate

==> Routing X Rate


( Lab acty X Acty Rate)
==> Costing Sheet Approach ( MOH @10% on material
or Template Allocation (Acty along with Formul

OH
Two Types OH
DOH Direct Overhead
IOH Indirect Overhead

How the Overhead to be allocated from Cost center to the Order

Direct Ovrhead
Activity Based Approach

Indirect OH
1 Activiy Based Approach

2 Costing sheet Method ( Not base

Direct Ovrhead
Activity Based Approach
Method1

Example

Advantages===> We can recove


Indirect OH
2 Costing sheet Method ( Not base

Template Allocation
One of the Method of OH allocation from cost c
Template allocation can be used to allocate both

In template allocation , We can use Acty type alo


By using Template allocation , We can ad
Advantages :

Example :
Material OH to be recovered bas
In case of Mfg Orders , Material
Procurement Dept====> Procur

At the month end, We will deter


Then applied revaluation of acty

Costing sheet

Costing sheet Method ( Not based on Activity approach


Tradional approach===> allocating fixed based O
Example :
Admin Dept ( Admin Cost center
Procurement Dept ( Cost center

Advantages :
Simple approach to maintain for

Draw Back :
As following Fixed OH rate So no
Always over /Under absorbtion
No Revaluation Functionality to

Create Costing sheet for Production Orders

Row Base OH RateDescription


10 ZY10 Material cost
20 ZY11 Conversion cost
30 ZY20 Mat OH @10% on Mat cost
40 ZY30 Utilities OH @20% on Conversio
50 ZY30 Admin OH @ 20% on Conversion
60 Total cost

Costing Sheet to Calculate Indirect OH


Costing sheet specifies what OH % or Qty Based OH rate to be a

Below are the Key Termnalogies of Costing Sheet


1 Base
2 OH Rate
3 Dependency Key
4 Type of the Overhead
5 Credit Key
Material Overhead to be calculated @10% if plant =Y10
Admin Overhead to be calculated @20% if PC(Profit cen
Utilities Overhead to be calculated @20% if PC=X,@12%

Base Grouping of cost elements on which OH


ZY10 Material cost (Grouping of Mate
ZY11 Conversion cost (DOH)

OH Rate ( Overhead Rate)------------> Represents OH %


OH rate OH % or Qty based OH rate
10% if plant Y100 or 12% if Plant = Y101
Material OH rate

ZY20

ZY30 Admin /Uti OH


Dependency Ke It represent the Conditions
The OH rate or % to be applied
D020 Dependency key = Plant
Example for Dependency Key = C

D080 Dependency key = Profit center

Type of the Ov To maintain different OH rate for Plan an


2 Plan OH rate
1 Actual OH rate

Credit Key OH to be allocated from which cost cen

Z11 Procurement CC and OH CE 941


Z12 Admin Cost center and OH CE 9
Z13 Utilities Cost center and OH CE 9

Define Costing Sheet Parameters

Define Base
Define Calculation Bases Referring to Cost Element and

Grouping of CE to apply OH on the Base


Define Percentage Overhead Rates

MateriaPlant Y100=10%
ZY20 Plant Y101 =12%
Overhead Type
1 Actual oH Rate
it appilies in actual OH calculation for the Order

2 Planned Overhead Rate


It appilies in the Standard cost estimate calculation and also planned cos

CE Category
94101 Materia 41
94102 Admin 41
94103 Utilitie 41
Procurement DepY10005
Admin Dept CC Y10000
Utilities Dept CC Y10004

CC CE
Y11 Procurement OHY10005 94101
Y12 Admin OH Y10000 94102
Y13 Utilities OH Y10004 94103
save

save

new entry
Y13 Utilities OH Y10004 94103
Save
Fixed % in Credit Key
Purpose :
To split into fixed and varible OH as per Credit Key Fixed %
Example:
Base Total Co 10000 INR
Fixed % in Credit 35%
Total OH rate @10% on Material cost(Base)

First system calculates OH rate then Fixed % applies on OH rate amount

Base 10000 INR


Total OH Rate@10% on 1000 INR
Fixed OH rate 35% on O 350 INR
Varible OH =Total OH a 650 INR

Note : Fixed % in Credit key relevant only Base follows the Total amount

If Specified * in fixed % field in credit key====> then it follows fixed and varible
Event Based
It calculates Overhead on Real time basis ( Transactions based)

Overhead calculated while performing Goods issue , Confirmation of Activities

Example :
1 Goods issue to Order
RMX == 500

Dr . Ma 500 Dr. IO or 500


Cr. Sto 500
It calls event based Costing sheet
Dr. Ma 50 Dr. IO or 50
Cr. Ma 50 Cr CC(Pu 50

2 Labour Hrs 10hrs X200EUR booked

Dr. Lab 2000 Dr.IO or 2000


Cr. Lab 2000 Cr. Mfg 2000
It calls event based Costing sheet
Dr. Ad 400 Dr.IO or 400
Cr. Ad 400 Cr.Admin 400

Note : If event based Costing sheet Indicator Not Activated Then you need to run Tran
Event based functionality available only in S/4 HANA

costing type NO action

Costing Type
1 Purpose and usase of the cost estimate
It also clasifies the type of the cost estimate
Example : STD cost estimate , Plan
2 Allow or not allow to update price to the MM a
3 Which valuation views to be costed ( Example : L
4 Partner cost split break up in the cost estimate
5 Which cost Component base (view)-COGM or cO

Each Costing type permites maximum one valuati


Example :
Costing Type == 01===> only allowed to up
For other costing purpose , we can define o
ZA1 Costing type for Quotation o
Below are SAP predefined costing types
Costing Type == 01===> only allowed to up

Costing Type Name


01 Std cost
K1 Std cost in Grp valu
P1 Std cost in PC(Profit
06 Plan cost
07 Actual cost
18 SO Cost estimate in
19 Preliminary Cost es

Cost Portion for Overhead Appilication


Which Cost component view(Base)
Example
Generating cost estimate of FG
SFG
Mat 1000
DOH 3000
IOH 1000
5000
10% 0f Mfg SOH 500
5500
In cost estimate of FG , OH to be calculated
We would prefe
5% OH on 5000

Partner Cost Component Split

To view the Partners(


We can set / define pa

Cost estimate With Qty Str / Without Qty str

In case of Std cost : Always Std cost

1 Without Date
Cannot be used for Material
Can be used for plan cost of
2 With Date
Cannot be used for Material
Can be used for plan cost of
Can be used for Preliminary c
Can be used fo SO cost estiat

NO action
:01" Always updates to the MM Standard Price field

01" Always is used to generate cost estimate in Legal Valuation

in case of Standard cost estimate======> Cost estimate always save wit

Example :
Current date 19.07.2022
Running cost estimate on 19.07.2022 but cost estimate

Aditive cost with start of period


Cost estimate always saves from begging of the period
Cost Portion for Overhead Appilication
Which Cost component view(Base) ( Example : COGM or C
Example
Generating coFG X In cost estimate FG ===> 5%
Plant Y SFG
Mat 1000
DOH 3000
IOH 1000
COGMof SFG 5000 COGM
COGS oSOH-10% 0f MSOH 500
5500 COGS

In cost estimate of FG , OH to be calculated on lower level comp


We would prefer COGM as base to
5% OH on 5000 COGM =250

Partner Cost Component Split

To view the Partners( Profit center , Plant, Company code ) cost brek u
We can set / define parner split for the combination of Company code
Save

Save
Note : Always must use costing type 1 for Standard cost estimate in Leg
Don't create your Own

19 Preliminary Cost estimate


It is type of plan cost estimate for PCC
Estimated plan cost for PCC ( Product cost collector)
Save

K1 Costing type-Grp Valuation


It defined at Client Level
Don't create Your Own
Save
P1 Costing Type-Profit center Valuation

Save
Valuation Variant
It specifies which sequence of priority of the source of the price to be us
External operations and also it specifies which costing sheet to be used t

The Valuation variant it contains the below componentsas below


1.      Material
2.      Activity
3.      Subcontracting
4.      External Operations
5 Overhead

1 Purchase Info Records 1 Plan Avg Acty R 1 PO Price

Sub Contract :
Outsourcing entire components by supplying key components to
Y10company====>SFGX Outsourcing along with supply
Keycomponents (BOM)
RMX 1
RMY 3
Sub contract vendor will charge process charges

Cost estimat for SFGX


BOM Components
RMX 1
RMY 3

Sub Contract charges 1

Cost of the product

External Operations :
It is also type of subcontract the service
Outsourcing the service / Task / Activities can be called

Example :
Outsourcing Cleaning Activity , Painting Activity
How you are valuating these external activity in

FGY
BOM Price picks as per
RMX 1 Kg 100
RMY 3 Kg 200

Routing
Op10 Cleanin 1 PC 500
Op20 Lab Acty 5 Hr 800

Valuation variant is used for valuate the material, Internal Resource (Acti

Valuation variant specifies valuation strategy, that is what strategy of se


material, Activity, Sub-Contract, External operations and also which costi

NOTE1: One Valuation variant is sufficient for Standard cost estimate, Pl


Note2 : In case of actual goods movements , It ignores valuatiion variant

Purchase Info Records à SUB-STRATEGY:-

GROSS PRICE = NOT DEDUCTED DISCOUNT AND REBATE ( Before


NET PRICE = DEDUCTED DISCOUNT AND REBATE FROM THE GRO
EFFECTIVE PRICE = (Gross Price – Discount – Rebate) + Fright /De
EFFECTIVE PRICE without Fixed Cost = Effective price - Fixed Cos
Quota
tion/ CONDITION TABLES à Assign the MM Condition types to the Ori
PO (Reading the Values from MM Condition Types)
SUBCONTRACTING:
Subcontracting means out sourcing the total component to the v
The vendor will perform the work and complete the product and

EXTERNAL PROCESSING:
External Processing is also like Subcontracting process here Outs

OVERHEAD: In this case we need to specify which Costing Sheet we will use to a

OVERHEAD on FINISHED & SEMI FINISHED MATERIALS:


The Costing sheet is used for calculation of Overhead for Finishe

Overhead on Material Components


This Costing sheet is used to calculate the Overhead for the Exte

OVERHEAD SUB CONTRACTING MATERIAL:


To apply the Overhead on Sub Contracting Material.

Project Example :
External Procurement Material
Method Std Price = Purchase info record price +
RMX S
RMY S

Costing Sheet1 in Costing sheet for RM ( external Procurement)

Base Mat
OH 10% on Mat cost

Costing sheet 2- SFG & FG


Not calculated OH on material cost
Base Lab & Machine cost
OH 30% on Lab & Machine
Valuation strategy plant independent
Plant dependent valuation strategy
To maintain different pricing stragey and different costing sheet depending on p
System it picks first priority as per plant depent strategy then it follows the Glob

How to maintain Plant depent valuation strategies


in the above case , System follows Global level valuation strategy for Plant Y101
in case of Plant Y100, It follows the plant dependent valuation strategies

Define Date Control

Date Control:
1 Date control specifies (Proposes)the validity of the cost
2 In case of Std cost estimate , cost estimate validity start
Case1 Validity date from past date , inthis case
Case2 Validity date from current date , in this c
Case3 Validity date from Future date , in this c

3 In case of Std cost estimate , cost estimate end date of


The System Requires the Cost Estim

4 Date control also specifies which date BOM and Routing


5 Date control also specifies which date price to be picke

6 Date control proposes the below default dates but we


Costing Date validity From
Costing Date validity Till
Qty Structure Date
Valuation Date

Costing Date validity From


Case1 Validity date from
Case2 Validity date from
Case3 Validity date from

Costing Date validity Till


1 In case of Std cos

Qty Structure Date


1 Date control also

Valuation Date
1 Date control also

Default Manual entry


Date control proposes th

Costing Date valid


Costing Date valid
Qty Structure Dat
Valuation Date

Recommendation :
We would recommend to create separate set of
th Date control -Yearly Costing Run
Save

explanation on valuation variant along with date control

Valuation Date : Which date Price to be consider in the cost estim

valuation variant====> prioity of sequence of source of price

purchase info record on 01.03.2022 --rmx--100inr


purchase info record on 01.4.2022 --rmx--110inr

running cost estimate ===>valuation v


cost estimate valid from 01.03.2022
which price to be consider rmx 100inr

runiing cost estimate ===>valuation v


cost estimate valid from 01.04.2022
which price to be consider rmx 110inr
Qty Structure Control
It contains strategy which BOM and Routing to be conside

BOM Strategy
We can define priority of strategy of BOM

Usase of the BOM===> BOM can be used i


Application areas like
Production area
Costing Area
Engineering & D
Sales Area
PM Area

Usase of the BOM assigned / specified in th

BOM Strategy
Sequence of PrUsase of BOM
1 6 Costing BOM
2 1 Production
3 5 SO BOM
4 3 Univesal BOM

Example :
FGX
BOM1 Production area

BOM2 Production area


If Product having multiple BOM with same applic
We need to follow below settings to use speific B
Option 1 Need to assigne Relevant BOM whic
or
Option2 in Configuration level===>Check Al

Recommendation Approachis Option1===> MM costing


Usase of the BOM
Check BOM Selection
Here We need to specify strategy of the sequence of prio
Selection iD Selection Priority BOM Usage

1 6
2 1
3 3
Y0 4 5
Save
Costing BOM====> Product having multiple Production bOM, in
Normally we wouldn't define separate B
Same Production BOM is used for costin

Selection ID need to be assigned in Qty Structure Control ( BOM


Save
Override Alternative selection from Material Master
Alternative Determination BOM
When alternatives are selected automatically according to applic
Ignore Material master selection then follow the settings as per -
Production Versions
if indicator shows that, when alternatives are selected au

Define Qty Structure cpntrol


It specifies strategy Which BOM and Routing to be selecte

BOM Application need to be assigned in the Qty Structure


save
Rounding for Component Quantities :
Option1 : No Round Up

Option2 Rounding for Com

Recommendation:

Routing Selection :
Priority of sequence of source of routing selected based on com

Tast list Type


It specifies the type of Routing and in whi
N Routing===> Descre mfg Process ( P
R Rate Routing====> Used in Repete
2 Receipe=======> Used in Process i

Usase
It specifies in which appilication areas allo

Status of Routing:
Release for costng
Released for Production

Tast list Type ===> Mat Type===> Material


Routing created for combination of Mater
Task list type indirectly linked to the Routi

Usase of Routing and also status of routing directly assig

Priority of sequence routing specified for comination of Task List

Selectio Seq of PriorityTask Li UsaseStatus


YR 1 N(Routi1(Prd) 4 ( release for general
YR 2 N 2(Eng/ 4
YR 3 2( Rece 1 4
YR 4 R ( Rat 1 4

What is the Task List Type


It clasifies the type ( Category) of the routin
PP Settings
Define / Maintain Task List Types
Maintain number ranges for Routing

Save

Task list type need to be assigned to the Material Type


Which Task list types allow to permite for Which Material Types
Permited all task list types for material type.

Save
Define Routing Statuses
It Indicates the status of Routing
Routing status specified / assigned directly in the routing
Define Task List Usage
Usase of the Routing
CO settings
Define Priority of sequence of Rout CO settings
Check Automatic Routing Selection
We can define priority based on Task list Type +Plan Usase+Status

Save

Routing selection ID need to be assgned in the Qty strcture cont


Costing Variant for Std Cost Estimate
Control Parameters
Costing Type
Valuation Variant
Date Control
Qty Structure Control
Transfer Control

Costing variant contains the grouping costng control para


Cost estimate program calls the cosing variant control par
Based on costing type , We can update to the MM pricing
OKKN
Pass On Lot size
Lower level components cost estimate tobe gene
Options
NO Lower level components cost estimate generates
2 AlwaysAll the components of the product (Component)
This approach recomendable in Sales order costi
1 Only With Individual Requirement
in this case , System generates cost estimate bas
Example for Individul requirement
FGX
SFGX Individual require
SFGZ Individual require
SFG1 Collective

in the above , SFGX and SFGZ generates cost estim


SFG1 genrates cost estimate based

Ignore Product cost estimate Without qty structure


if indi It ignores costing infrmation which is generated without qty str
In ths case always uses the qty str to genrate cost estima
If No qty str , then it follows the valuation variant to pick

SFGX without BOM FGX


SFGY with BOM SFGX
SFGY
Transfer active Std cost estimate if material costed with errors

Option1 Indicator Activted


Then follows the below strategy
1 It looks for alternative existing cost estimate===>
2 If No alternative existing cost estimate exists====
3 If no price exists as per valuation variant then it p
Note : Not posible to release cost estimate of higher level

Option2 Indicator Not activated


Then follows the below strategy
1 If Lower level component having costing errors th
3 If no price exists as per valuation variant then it p
Note : Not posible to release cost estimate of higher level

Transfer Control Can be changed


If indicator activated===> then possible to change default trans
If indicator not activated===> then not possible to change defau
Saving Allowed :
It allow to save the cost estimate
Saved cost estimated required for the below purp
1 Saved cost estimate only possible to updat
2 Saved cost estimated required in Result an

Save Error Log :


It allow to save error log while generating cost es
Defaults can be changed by User
If Indicator Activated : Then it gives the option to the user
Always these indicators need to upd
Hence Don't activate indicator
If Indicator Not activated :
By defaults it updates Costin
Conclusion : Don't activate Default indicator

Itemisation :
Possible get costing information at line item leve
This indicator is no relevant in the std cost estima
Conclusion : Always better to select the indicator

Note: Assinement costing variant to the cost component structure alre


Remaining Assignements will be done separately ( Costing versio
Misc Tab
How to record the error log if any errors while generating

Message Online ===> Not possible to save error l


Log and Save message , Mail Active===> It saves l
Log and Save message , Mail Inactive===> It saves
Log messages,but don't save, mail inactive===> N

Activate Cost Component Split in Controlling Area Currency

To get component split in controlling area currency in addition t


This settings required to calculate variance category wise
Activate Cross-Company Costing
Purpose : To read cost estimate across plants which belon

Costing Version
Generated cost estimate saves in costing versions
possible to generate multiple cost estimates by using costing ver
in case of std cost estimate , We need to specify which costing ve
system permites single costing version to updates Material Mast
Costing version need to be select in the cost estimate selection s
save
bike
ck11n
planning again work centers cost center

pg-cut pro qunatity total divide common rate activity


common total/kss4 3
11005 1000 2500
11010 1500

clean 200
11011 2000 2000 714.28571 2714.286 13.57143

labour 100
11000 5000 6000 357.14286 6357.143 63.57143
11001 1000

machine 400
11013 3000 3000 1428.5714 4428.571 11.07143

44000
5280
planning
pg-des p total divide kss4/amo rate activity
common qunatity
11005 5000 6000
11010 1000

clean 500
11011 5000 5000 3333.3 8333.333 16.66667 no

labour 300
11000 1000 3000 2000 5000 16.66667 yes
11001 2000

machine 100
11013 6000 6000 666.66667 6666.667 66.66667 yes

rounting missing
inventory not relevent
ck24
execute
mm02
OH , Direct OH

@10% on material Cost)


along with Formulas)
enter to the Order

Approach

Approach

Method ( Not based on Activity approach)

=> We can recover 100% OH that means it wouldn't arise any over / Under absorbtion
Method ( Not based on Activity approach)

cation from cost center to any cost object( CC/IO/Mfg Order/SO/ WBS/Any type of order)
ed to allocate both Direct OH and Indirect OH from cost center to any cost object

n use Acty type along with flexible simple / complex formulas to allocate OH from CC to the any
ocation , We can adderes any business requirement

o be recovered based on Material consumtion Qty or material cost or yield confirmation


Orders , Material oH to be recovered based on Output of Production
Dept====> Procurement Acty==========> Order

end, We will determine actual acty rate 60/PC


revaluation of acty = 10Pc X(60-50)=100INR

Activity approach)
ating fixed based OH to the Order

Admin Cost center)====> allocate OH 20% on total cost of Order


Dept ( Cost center)=====> Allocate OH 10% on Material cost of the order

ach to maintain formulas and allocate OH

ixed OH rate So not possible to recover 100% OH


Under absorbtion
n Functionality to recover Over / Under absorbed OH as not using the Acty type
% on Mat cost
20% on Conversion Cost
20% on Conversion cost

d OH rate to be applied under which condtions on which amount and from which cost center

osting Sheet

@10% if plant =Y100,@12% if Plant=Y101 based on material cost of the order from Procuremen
20% if PC(Profit center)=X,@12% if profit center=Y based on conversion(acty) cost of the order
20% if PC=X,@12% if profit center=Y based on conversion cost of the order from Utilities Cost

ents on which OH rate to be applied


(Grouping of Material consumtion CE)
st (DOH)

2% if Plant = Y101
r % to be applied under which conditions
ey = Plant
ependency Key = Co.code , Plant , Order type,Profit center etc

ey = Profit center

OH rate for Plan and Actuals

om which cost center (Recovery CC) and which CE(41) (Recovery CE) to be used to credit from c

CC and OH CE 94100
nter and OH CE 94102
enter and OH CE 94101

Cost Element and Origin

n the Base
profit center assprofit ce
nd also planned cost calculation of the Order
date galt hai

01.01.2999
t Key Fixed %

n OH rate amount and balance amount will show as varible

otal amount

s fixed and varible split as per Base


ation of Activities ( Example : Labour Hour booking , Machn Hour time booking)
u need to run Transaction Overhead calculation KGI2, KGI4,CO43 to calculate Overhead

st estimate
estimate , Plan cost , Actual cost , SO Order cost estimate , Preliminary cost (Plan cos
ce to the MM and which price field to be updated in the Material master ( Example
ted ( Example : Legal valuation , PC valuation , Grp valuation , parallel valuation etc)
e cost estimate
ew)-COGM or cOGS can be used for OH calculation of SFG in the cost estimate of FG

mum one valuatin view so we need to define separate costing type for each valuation
nly allowed to update MM Std price field in the legal valuation . In this case not possib
, we can define our own costing types
for Quotation or Planning

nly allowed to update MM Std price field in the legal valuation . In this case not possib

Purpose
To Update MM Std price field in Legal valuation
To Update MM Std price field in Grp valuation ====>Prereques
To Update MM Std price field in Profit center valuation
To generate plan cost for order ( Production order, Process order)
To calculate Actual cost for Order ( Production order , Process order , PCC)
To generate SO cost estimate in Legal valuation and can be used to valuate SO
To generate plan cost for PCC order ( Product cost collector)

nent view(Base) ( Example : COGM or COGS) can be used to calculate OH ( If used Co

In cost estimate FG ===> 10% on OH Now ? Do we need to consider COG


Normally consider COGM as a Base for OH cal of SFG(Low

COGM

COGS
to be calculated on lower level components (SFG) either based on COGM base or CO
We would prefer COGM as base to calculate OH on lowerlevel components in the co
5% OH on 5000 COGM =250

w the Partners( Profit center , Plant, Company code ) cost brek up details in the cost
an set / define parner split for the combination of Company code , Plant and profit ce

hout Qty str

Always Std cost estimate saves from the beginning of the period (3 With Sart of peri

sed for Material cost estimate


for plan cost of theorder but can not be saved and not available for analysis purpose
sed for Material cost estimate
for plan cost of theorder and possible to save.
for Preliminary cost( Type of Plan cost) for PCC
fo SO cost estiate
gal Valuation

te always save with beginning of the period

but cost estimate always saves from begging of the period 01.07.2022

ging of the period 01.07.2022


mple : COGM or COGS) can be used to calculate OH ( If used Costing sheet) for SFG(L

mate FG ===> 5% on OH
Normally consider COGM as a Base for OH cal of SFG(Lower level component
ower level components (SFG) either based on COGM base or COGS base ?
OGM as base to calculate OH on lowerlevel components in the cost estimate of Highe
GM =250

ode ) cost brek up details in the cost estimate of the product


f Company code , Plant and profit center
ost estimate in Legal Valuation
f the price to be used while valuating materials(BOM Components), sub contract material, Activ
sheet to be used to calculate the Indirect OH in the Cost Estimate.

mponentsas below.

PO Price 1 PO Price

ey components to the subcontract vendor


along with supplying key components RMX , RMY========> subcontract Vendor X=====> Com
ents (BOM)
kg
Kg
ge process charges ( sub contract chages) to Y100

Price picks as per valuation variant Mat tab for BOM Components ( Example PO
kg 100 INR 100
Kg 200 INR 600

pc 5000 inr 5000 Price picks as per valuation variant subcontract tab for s

5700

ities can be called as Extrnal Operations.

, Painting Activity , Assembled activity , Packing activity=====> Can be called as external operati
external activity in the cost estmate===> Strategy specified through Valuation variant External O

Price picks as per valuation variant Mat tab for BOM Components ( Example PO price)
INR 100
INR 600

INR 500 External Process (Outsourced)


Price picks as per valuation variant External Operation tab
INR 4000 Internal Process
Price picks as per valuation variant Activity tab

rnal Resource (Activity types), Sub-Contracting, External Operations and also it specifies which

what strategy of sequence of priority of source of price to be considered while valuating


nd also which costing sheet to be used to apply indirect Overhead.

d cost estimate, Plan cost and Actual Cost purpose.


s valuatiion variant strategy and follows price as per MM Price control

D REBATE ( Before deducting discount ad Rebate)


TE FROM THE GROSS PRICE ( Gross price-Discount-Rebate =Net Price)
ebate) + Fright /Delivery charges +Oth or Net Price +Freight and Delevery charges +Insuran
e price - Fixed Cost ( example Aditive cost etc)
on types to the Origin Groups
tion Types) Example : Read freight charges from MM Condition Types
Read Inrercompany mark up price from MM Condition Types
omponent to the vendor instead of the manufacturing product.
te the product and supply the full product for that purpose, vendor will charge the subcontracti

process here Outsources Particular part (or) Activity (Ex: Painting, Cleaning, Packing, and Assem

eet we will use to apply the Overhead.

erhead for Finished and Semi finished goods (or) Assembly.

rhead for the External Procurement material cost estimates


nfo record price +Overheads ( Separate costing sheet for RM)

ocurement)
1
eet depending on plant
it follows the Global valuation strategy incase if not maintained plant dependent valuation stra
egy for Plant Y101 as not maintained plant dependent valuation strategy
n strategies

validity of the cost estimate that it specifies cost estimate valid from which date to till which da
mate validity start date should be from either with current date or future date.
t date , inthis case , we can generate cost estimate but not possible to save cost estimate hence
rent date , in this case , we can generate cost estimate , possible to save cost estimate , possib
ure date , in this case , we can generate cost estimate , possible to save cost estimate and poss

mate end date of validity should be atleast end of the FY or Maximum date (31.03.9999)
es the Cost Estimate End of valiity should be minimum at least the end of the curreny

e BOM and Routing to be picked in the cost estimate. We would recommend to pick as per costi
e price to be picked to valuate BOM components , activitities in the cost estimate. We would re

ault dates but we can modify the proposed default dates by activating manual entry allowed
Validity date from past date , inthis case , we can generate cost estimate but not possible to sa
Validity date from current date , in this case , we can generate cost estimate , possible to save
Validity date from Future date , in this case , we can generate cost estimate , possible to save c

In case of Std cost estimate , cost estimate end date of validity should be atleast end of the FY
The System Requires the Cost Estimate End of valiity should be minimu

Date control also specifies which date BOM and Routing to be picked in the cost estimate. We

Date control also specifies which date price to be picked to valuate BOM components , activiti

ontrol proposes the below default dates but we can modify the proposed default dates by activ

Costing Date validity From


Costing Date validity Till
Qty Structure Date
Valuation Date

ate separate set of date controls for Yearly cost estimate and separate set of date controls for c
osting Run
er in the cost estimate

-rmx--100inr
mx--110inr

===>valuation var priority purchase info record price + date control valuation date(01.03.20

rmx 100inr

===>valuation var priority purchase info record price + date control valuation date(01.04.20

rmx 110inr
FGX
ting to be consider in the cost estimate BOM1 BOM2
PRd Prd

trategy of BOM based on usase of the BOM

M can be used in which application area


cation areas like
Production area
Costing Area
Engineering & Design
Sales Area
PM Area

d / specified in the BOM while creating BOM

ng BOM

sal BOM

uction area Alternative Bom==>1

uction area Alternative Bom==>2


with same application area then as per standard functionality , System takes 1st BOM
s to use speific BOM in the cost estimate if you don't want to use 1st BOM
evant BOM which need to be consider in the cost estimate in the MM Costing 1 tab

vel===>Check Alternative Selection for Multiple BOM

1===> MM costing1 Tab option


equence of priority of bOM to be consider in the cost estimate
BOM Usage

Costing
Production
Universal
Sales BOM
oduction bOM, in such cases you can design separate BOM for costing Purpose
define separate BOM for costig purpose
M is used for costing purpose also

e Control ( BOM Apilication)


according to application, this indicator determines that the SAP System is to select a specific alt
he settings as per -> Define alternative determination for multiple BOMs step.

s are selected automatically according to application, the production versions mainta

ting to be selected

he Qty Structure control


date control tg
th

quantity stucture tg00


No Round Up
It wouldn't round up of the quantities
Example :
RMX UOM PC
As per Lot size calclation====> Calculated qty required as = 1.1pc
System takes same qty 1.1PC in the cost calculations

Rounding for Component Quantities


Example :
RMX UOM PC
As per Lot size calclation====> Calculated qty required as = 1.1pc
System takes round up qty from 1.1PC to 2PC in the cost calculations

Option2 Rounding for Component Quantities

ed based on combination of Tast List Type(type of Routing) + Usase + Status

uting and in which application area ( Process) allow tobe used


e mfg Process ( Production orders)
Used in Repetetive Mfg ( Product cost collectors)
Used in Process industries ( Process Orders)

cation areas allow to be used


ination of Material /plant Mat type(Y30)
ked to the Routing through the Material master Which task listtype to be
N
ting directly assigned in the Routing while creation ofRouting R
Mat-FGX
ation of Task List Type + Usase + Status
Work Center

ease for general)

ory) of the routings and also it specifies in which apllication areas ( process) allow to
erial Types

op50

tly in the routing


save

Qty strcture control


quantity structure is tg00
tng control parameters i.e costing type , valuation var, Date control ,Qty Str control a
riant control parameters and reads the BOM and Routing and pricing strategy as per
o the MM pricing field.
timate tobe generated either based on Component Lot size or Final Component Lot si

timate generates based on Component lot size


ct (Component)generates cost estimate based on Final componentLot Size
Sales order costing (MTO)

ost estimate based on Final componet lot size for those components having individua

====> Cost estimate based on final component lot size(FGX)


====> Cost estimate based on final component lot size (FGX)
====> Cost estimate based on component lot size(SFG1)

nerates cost estimate based on Final component lot size i.eFGX


estimate based on component Lot Size i.e SFG1

d without qty str in the cost estimate of product with qty str,
rate cost estimate .
n variant to pick the price

with Qty str


ExistinGenerated cost estimate W/O qty str it ignores existing costing infor
ExistinGenerated cost estimate with Qty Str it uses the existing cost estima
FGX
SFGX
SFGY Costing errors
st estimate===> it pass to the higher level components
mate exists====> It picks price from material master as per valation variant strategy
variant then it pass the costing error to the higher level components
te of higher level unless remove the errors in lower level component cost estimate
FGX
SFGX
SFGY Costing errors
costing errors then It picks price from material master as per valation variant strateg
variant then it pass the costing error to the higher level components
te of higher level unless remove the errors in lower level component cost estimate

nge default transfer control while generating cost estimate


to change default transfer control while generating cost estimate
r the below purpose
ossible to update MM
ired in Result analysis , WIP and Variance calculation and analysis purpose

enerating cost estimate if any error


ption to the user wether cost estimate allow to save log , to update Itemisation and T
tors need to update hence always should update
e indicator

it updates Costing Log, Itemisation and Cost compoent split

at line item level i.e means BOM item wise , Receipe each acty wise and costing shee
e std cost estimate and its relevant for preliminary cost estimate and plan cost
e indicator

ent structure alreay done while creating cost component structure


y ( Costing version , Cost component split in controlling area currency , Cross compan
while generating cost estimate

e to save error log


ve===> It saves log and sent mail to the responsable users
tive===> It saves log and No mail to the user
il inactive===> Not possible to save error log

ncy in addition to Company code currecy


gory wise

save
plants which belongs to different Company Code

y using costing versions and can be save cost estimate in the different versions
fy which costing versions results can be permited to update material master for specific period
ates Material Master
stimate selection screen.
pg-fin total divide kss4 rate activity
common qunatity
11005 800 2000
11010 1200 88.21429
134.881
clean 50
11011 9000 9000 333.3333 9333.333 186.6667 no

labour 100
11000 4000 4600 666.6667 5266.667 52.66667 no
11001 600

machine 150 yes


11013 6000 6000 1000 7000 46.66667

5280

pg-packing total divide kss4 rate activity


common quantity
11005 4000 7000
11010 3000 4715.79

clean 150 47157.9


11011 5000 5000 1105.263 6105.263 40.70175 no

labour 500
11000 5000 6000 3684.211 9684.211 19.36842 no
11001 1000

machine 300
11013 18000 18000 2210.526 20210.53 67.36842 yes

673.6842

134.881

cost commponent structure me 41 catergorey k cost element add kiye


r absorbtion
y type of order)

OH from CC to the any cost object

confirmation
m which cost center to be allocated

er from Procurement Cost center to the order


ty) cost of the order from Admin Cost center to the order
r from Utilities Cost center to the order
used to credit from cost center and to debit in the recever side
profit center assign
te Overhead

inary cost (Plan cost)


master ( Example : Udate MM STd price feld , Tax Inventory field, Other Price fields e
allel valuation etc)

ost estimate of FG

e for each valuation view


this case not possible to define user dfine costing type for legal valuation to update M

this case not possible to define user dfine costing type for legal valuation to update M

====>Prerequest is that ML Multiple valuation should be activated

s order)
cess order , PCC)
used to valuate SO Stock in legal valuation

ate OH ( If used Costing sheet) for SFG(Lower level compent)in the cost estimate of F

d to consider COGM s base or cOGS as a base


OH cal of SFG(Lower level component) in cost estimate of FG( Higher level compone
n COGM base or COGS base ?
mponents in the cost estimate of Higher level components.

details in the cost estimate of the product


Plant and profit center

3 With Sart of period)

or analysis purpose
ng sheet) for SFG(Lower level compent)in the cost estimate of Final Product(FG)

er level component) in cost estimate of FG( Higher level component)


S base ?
t estimate of Higher level components.
ntract material, Activities,
Vendor X=====> Complete work=====> send SFGX=============>Company Y100

ponents ( Example PO price)

ubcontract tab for subcontact charges ( example PO price is 5000INR)

ed as external operations
tion variant External Operations Tab

ple PO price)
so it specifies which costing sheet to be used to apply the Overhead.

hile valuating

ery charges +Insurance + any additive cost - Payment terms cash discount

M Condition Types
arge the subcontracting charges. This entire process called Subcontracting.

g, Packing, and Assembling)


endent valuation strategy
date to till which date

e cost estimate hence not possible to mark and release cost estimate
ost estimate , possible to mark and release cost estimate
st estimate and possible to mark cost estimate but cost estimate possible to release once reach

te (31.03.9999)
end of the curreny fiscal year to calculate variance

nd to pick as per costing date validity from


stimate. We would recommend to pick as per costing date validity from

nual entry allowed


but not possible to save cost estimate hence not possible o mark and release cost estimate
ate , possible to save cost estimate , possible to mark and release cost estimate
te , possible to save cost estimate and possible to mark cost estimate but cost estimate possible

atleast end of the FY or Maximum date (31.03.9999)


y should be minimum at least the end of the curreny fiscal year to calculat variance

he cost estimate. We would recommend to pick as per costing date validity from

components , activitities in the cost estimate. We would recommend to pick as per costing date

default dates by activating manual entry allowed

of date controls for current cost estimates during the year.


uation date(01.03.2022)

uation date(01.04.2022)
BOM3
Costing
tem takes 1st BOM in the cost estimate of the product
1st BOM
MM Costing 1 tab under Alternative BOM and usase field need to be specified
o select a specific alternative as of a certain date

on versions maintained in the material master record are used as selection criteria.
e cost calculations

e + Status
h task listtype to be permited

Work Center
Task list Type

( process) allow to be used


ol ,Qty Str control and transfer control.
ing strategy as per costing variant parameters then it generates the cost estmate.
Component Lot size FGX Lot siz===>2PC
MTS===> SFGX Lot size===>100pc
5pC 500 2500
tLot Size MTO===> ===>2PC
5pc 700 3500

nts having individual requiremet indicator in MM MRP4 tab

isting costing information and it picks the price as per valuation variant strategy
xisting cost estimate
on variant strategy==> it pass to the Higher level components

nt cost estimate

tion variant strategy==> it pass to the Higher level components

nt cost estimate
purpose
e Itemisation and To update Cost Component split

se and costing sheet iem wise


nd plan cost

ncy , Cross company coting)


er for specific period for specific company code
pg-cut pro
pg-fin
pg-des p
pg-packing
Other Price fields etc)
uation to update MM Std price field

uation to update MM Std price field

e cost estimate of Final Product(FG)

her level component)


l Product(FG)
o release once reach the future period
se cost estimate

cost estimate possible to release once reach the future period

calculat variance

ck as per costing date validity from


be specified
election criteria.
he cost estmate.
>100pc 500 As per Component level Lot size

700 As per final component lot size

ariant strategy
1E PG-FIN 94311 32,666.70 32,666.70 INR 10 HR
2M PG10 PG-S 10072 ### ### INR 5 PC
3M PG10 PG-T 10003 500 0 INR 5 PC
4E PG-PACKING 94303 56,982.40 56,982.40 INR 20 HR
5E PG-PACKING 94311 47,157.90 47,157.90 INR 10 HR
6E PG-DES P 94311 ### ### INR 50 HR
7E PG-DES P 94300 70,000.20 70,000.20 INR 60 HR
8G PG-FINANC 94101 ### ### INR
9G PG-ADMIN 94102 7,000.02 7,000.02 INR
10 G PG-HR 941 94103 7,000.02 7,000.02 INR
11 G PG-SALES 94104 0 0 INR
### ### INR

amount rate
work center ce
pg-cut pro pg1 clean 11011 2714.286 13.57143
machine 11013 6357.143 11.07143
labour 11000 4428.571 63.57143
11001
pg-des p pg2
machine 11013 6666.667 66.66667 50 3333.333 ok
labour 11000 5000 16.66667 60 1000 ok
11001
pg-fin pg3
machine 11000 7000 46.66667 10 466.6667 ok
11001

pg-packing pg4 clean shou 11011 6105.263 40.70175 20 814.0351 ok


machine 11013 20210.53 67.36842 10 673.6842 ok

Cost Estimate Without Qty Structure


The Cost Estimate without Qty Structure enables calculation of cost of goods mfg & Cost of Goods Sold for products
Instead the resource to manufacture the product is directly entered at the time of Calculation of cost estimate.
Front End
1.Create MMM01 watch
watch material created costing veriant

Cost Estimate WithoutKKPAN


Path : Logistics --> Production process --> Product cost Planning --> Material Costing --> Cost Estimate with out qty
valution veriant & costing sheet also created
ck24
go mm02
and see
ckr1 ck44
44982.46
4498.246

3270250

6287.719
628.7719

6287.719

ost of Goods Sold for products which does not have BOM & Routing.
lculation of cost estimate.
--> Cost Estimate with out qty structure --> Create

watch -raw create material


mmpv se 6th period close karengey
Sub Contract
1.Sub Contract is an arrangement where in certain components are mfg by external orders.
2.However the company that subcontract would provide key component of the subcontract material to the vendor
3.The Vendor is paid a fee for performing the activites of assy the component.
4.The Subcontract material is created by assign the special procurement indicator in MM Mrp 2 tab.
5.Subsequently a subcontract purchase order was created for the material.
6.The Item categeory of Po line item needs to be set "L" this makes the Po a subcontract order

It is applicable two levels.


1. Component Based
There is no consumption entry at the time of goods issue to the vendor for processing Goods Movement entry (MM
Issue raw material to subcontract (Vendor) through MB1B WithMovement type 541.
As material remains ubder your ownership system does not make any value entry.
But Qty is shown as material provided to vendor.
There is no Fi Entry generated at the time of goods sent to vendor and the consumption entry generates at the time

Sub Contract (Operational )


Front End
Steps :
1.Create G/L A/Cs FS00
a)RM Consumption Local Subcontract
b)RM Consumption Import Subcontract
c) Change in Stock (SFG)
d)Process Charges

Go to OBYCOBYC
Click on Save button
oktz cost component structure
valuation veriant pgn pgn1 costing veriant pgn

SPRO-> PRODUCTION-> MATERIAL REQUIREMENT PLANNING- DEFINE SPECIAL PROCUREMENT


30

create BOM cs01


ME21N Create Sub Contract PO
Check Costing Variant OKKN
1111

11111

It can beused in different alternative production process or alternative procurement process is used to procure a material the
The Mixed Cost Estimate is also called as weighted avg cost estimate.
The Variance always can be more or less in case of mixed cost estimate.
The Mixed Cost estimate is only for std cost estimate purpose and cannot be used in actual costing.
Qty Structure Type
The Qty Structure type it controls how the mixed ratio is applied and how it is defined / Executed.
It determines which procurement alternatives are to be used and what ratios for the materials in the cost estimate.
Define Costing Versions :
Costing versions enables the creation of multiple cost estimates for the same material .
This can be helpful for analyzing different results for information purpose.
It specify which qty structure to be applied in mixed cost estimate.
Edit Procurement Alternatives :
The procurement alternatives are used to define the different options are available for procuring the material .
Here we maintain the procurement alternatives by using the process categeory.
Once the procurement alternatives defined then we need to define the mixed ratio.
Mixed ratio :
The Mixed ratio defines the percentage weight that each alternative has when the mixed cost estimate calculated.
Here we maintain the Mixed ratio for the procurement alternatives.
Configuration :
1.Define Qty Structure types for Mixed Costing
Path : SPRO --> Controlling --> Product Cost Controlling --> Product Cost Planning --> Selected functions in material Costing -->
Define CostOKYD
PATH : IMG --> Controlling --> Product cost Controlling --> Product cost planning --> Selected Functions in Material Costing -->
Click on New Entries button

Front End
Create MatMM01
Create 1st CS01
Create 2n CS01
Create RouCA01
then click operation
again ca01
Edit Procu CK91N
Path : Accounting --> Controlling --> Product Cost Controlling --> Product Cost Planning --> Material Costing --> mas
again create
Click on Confirm
Click on Save button
Create / C CK94
Path : Accounting --> Controlling --> Product Cost Controlling --> Product Cost Planning --> Material Costing --> mas

Enter
ontract material to the vendor.

MM Mrp 2 tab.

g Goods Movement entry (MM Entry) will be generated.

on entry generates at the time of goods received from the subcontract vendor to stock.
SPECIAL PROCUREMENT TYPE (OMD9)
sed to procure a material the costing of either of these alternatives result in different mfg cost or purchase price, in that case the mixed co

n the cost estimate.

g the material .

stimate calculated.

nctions in material Costing --> Mixed Costing --> Define Qty structure types --> Define Qty Structure types for Mixed Costing
nctions in Material Costing --> Define Costin Versions

reate valuaton veriant pgm


pensemi
g --> Material Costing --> master data for mixed cost estimate --> Edit Procurement alternatives
g --> Material Costing --> master data for mixed cost estimate --> Mixed ratios --> Create
price, in that case the mixed costing can be used to calculate the mixed cost estimate.

or Mixed Costing
Cost Object Controlling
Support Below functionalities
1 Plan cost calculation for the Order
2 Actual cost calculation for the Order
3 Result Analysis (WIP calculation)
4 Variance Calculation
5 Settelemement of the Order
6 Integartion with PP

7 Integartion with MM

Cost Object Controlling


1 Product Cost By Order
Production Orders
Process Orders
CO Production Order

2 Product Cost By Period


PCC with Repetetive Mfg
PCC with Descretive Mfg

3 Product Cost By Sales Order


SO is not a cost Object With Valuated Stock
SO is a cost Object With Valuated Stock
SO is a cost Object With Non Valuated Stock
Production Order
Costing Variant for Plan
Estimated plan cost for the production order to complete production

Configuraton:
pgp Costing variant for Plan
Costing type
Valuation variant

Save

Y2 Costing Variant For actual

Purpose :
PGA Generating Actual cost for Production Order
Assignment aur misc blank
Settelement
Settelement Profile
Allocation Structure ====> Required in
Source Structure ====> Required in
PA transfer Structure =====>To transfer
PA==>Profitability Analysis

Define Settelement Profile for Production Orders


Receivers :
Order Item ====> to settele order to Joint and By Product( To di
Sales Order====> MTO( Non valuated SO Stock)===> Prd order s
Material======> Always receiver is material for all mfg orders o
PSG==========> To transfer variances from Mfg Orders to the
GL===========> To post WIP and variance

Actual Cost / Cost of Sales


Which Cost to be setteled like actual cost Or Cost o

To Be setteled in Full
Settelement is manadatory and cost need to
Not possible to close the order or not possib
Normally selected To be setteled in Ful for a

Can be settele
Settelement becomes optional that means
Possible to close the order or possible to se
Business Use Case :
Few Historical order ( Old orde
In such case , now not possib
So Not possible to
Proposed solution to close the
1 Keep the option C
2 Then Close the Hi
3 Keep the option T

Responsabilty====> PP Consultant
PP Settings
Define Order Types
save
Note:
PP Order type controls the Order creation and Orde
PP Order types assignes number to the Order
PP Order Type contains the default parameters like
these default parameters by default copies fro

Order Category :
Order Category it specifies in which app
Order category controls the screen layo
Below is the SAP Pedefined Order Categ

Below are the Production Order categories

10 Production Order
04 CO Production Order
05 PCC Order ( Product Cost collector)
40 Process Order

Define order type-dependent parameters


Same path
save >copy>save

Save
Define Scheduling Parameters for Production Ordert.codeopu3
img--> Production--> Shop Floor Control--> Operations--> Scheduling--> Defin
Save
Extend to other Plants

save
Define Confirmation Parameters t.code
img--> production--> shop floor control--> operations--> confirmations
save
Save

Define Checking Control t.code


img--> production--> shop floor control--> operations--> availability ch
It checks the availability of the material and also specifies how the syst
It checks while creating order and also at the time realising Order
Save

save

Save
Maintain Task List Type for Material Type(OP50)
IMG>Production>Basic data>Routing>General Data>Defn Material Type assig

We are which type of Type Task list type ( Type of routing) to be permitt
Save

Which task list type allowed for which material typ

Task List Type : It specifies which application areas allow t

N Routing ====> Used in Production order

2Receipe ====> Used in Process Order ( Pr

R Rate Routin ====> Used in PCC ( Repetetive m


PCC===> Product Cos

Maintain Overall plant Maintaince Parameters (OPPQ)


IMG>Production>Material Requirement Planning>Plant Parameters>C
Save

Plant pg20
same way
Save

Control Key
PP Consultant will take care
Control Key

It Specifies How the operational activities performed


that means confirmation is manadato

Mile stone confirmation :


All procedding operatio
Example :
Routing Operations
1 OP10

2 OP20

3 OP30 ==> Control key w

In the above case , If we confim


System it books t

Control key specifies wether relevant routin

Control key also controls wether operations

Control key also specifies wether to perform

Control key also specifies wether allow to p


Control key also specifies wether to conside
Purpose Config Required
To generate Plan Cost For Order Costing Variant for Plan ( Costing Type 06 ,
To generate Actual Cost For Order Costing Variant for Actual ( Costing Type 0
To Calculate WIP or Reserves WIP Settings to be done
To Calculation Variance along with Variance Variance Settings
To Post FI entry for WIP and Variance Settelement Profile , Allocation Structure,
PP Order Type
Settelement Profile
RA Key
Costing Variant for plan
Costing Variant for Actual

Default Variance Key-------> Plant

====> To address the different Industry requirements

Used in Descrete Mfg industries ( Eng Industries )


Used in Process industries ( Pharma , Chemical Industries )
Used in Descrete Mfg industries ( Eng Industries )

FMCG -Soaps
Automobile , Computer processors

Enginerring industries

ed Stock
omplete production

'06
Y0
6 for plan costing type
====> Required in Joint /By Product scenario
====> Required in Joint /By Product scenario
=====>To transfer the variance classification wise to costing based COPA ==> Relevant for Co
d By Product( To distribute total cost between Joint and By Product)
ck)===> Prd order setteled to the Sales order
or all mfg orders other than MTO with non vauated SO stock
Mfg Orders to the COPA

ctual cost Or Cost of sales ( SO costing)

ry and cost need to be setteled fully


order or not possible to set the deletion flag unless settele full cost of the order
etteled in Ful for all manufacture order settelements
ptional that means you may settele or not settele
er or possible to set the deletion flag Eventhough Orders having Balance and system

al order ( Old order) cost which belongs to previous years cost not setteled.
, now not possible to settele previous year order cost in the current year
So Not possible to close these orders unless the settele thecost fully
lution to close the order as below
Keep the option Can be settele in the Settelement Profile
Then Close the Historical orders which need to be closed
Keep the option To be settele in FULL in the Settelement Profile
reation and Order Master data fields
o the Order
parameters like Settelement Profile , Costing var and RA key
default copies from the order type to the Order

fies in which applicaion areas allow to be used


s the screen layout of the Order
fined Order Categories
cheduling--> Define Scheduling Parameters for Production Orders
opk4 or opk4n
ns--> confirmations--> Define Confirmation Parameters
opjk
ns--> availability check--> define checking control
cifies how the system should respond ====> Allow to create or not allow to create o
ealising Order
Material Type assignements

outing) to be permitted for Specific Mat Type


which material types

tion areas allow to be used

roduction order ( Descre Mfg)

rocess Order ( Process industries)

CC ( Repetetive mg)
===> Product Cost collector

ant Parameters>Carry out overall plant maintaince parameters


es performed
mation is manadatoy or optional or not required

ocedding operations will be confirmed automatically while confirming last operation


==> Control key with mile stone confirmation

case , If we confim last opertion 30 then system automatically confirms the precedin
System it books the activity time as per planned time

her relevant routing operations is relevant for costing or not

wether operations allow to be performed externally ( External operations) or Interna

wether to perform Auto GR during the confirmation of operations

wether allow to perform rework related operations


wether to consider scheduling , capacity determinations
an ( Costing Type 06 , Valuation Variant)
tual ( Costing Type 07 , Valuation Variant)

Allocation Structure, PA Transfer Structure , Source structure

nt for plan
nt for Actual

------> Plant
A ==> Relevant for Costing based cOPA
t of the order
alance and system gives warning message like order having balance but we can igno

setteled.
ent year
t allow to create order
ming last operation
nfirms the preceding operations like op 10 and op20

rations) or Internally processed or Both


ce but we can ignore warning message and possible to close te orders