You are on page 1of 4

QUIZ: ASME AND NBIC CODE KNOWLEDGE

Chutchai Phromngam
ISSUE 454: MAY 8, 2023
Authorized Inspector & Supervisor
RELATED CODE : ASME PPC-2, E2022 AND NBIC NB-23, E2021 Line ID: cphromngam
cphromngam@eagle.org
Background
While review repair procedure for “External Weld Buildup to Repair
Internal Thinning” prepare by QC Engineer of “R” Certificate Holder.

QUIZ: ASME AND NBIC CODE KNOWLEDGE ISSUE 454


AI notice before weld repair to be performing “Volumetrically by RT
or UT shall examined for cracks in the area to be weld”. As required
by paragraph 3.3.4.3(e)(2)(c) [see page 3].

“We will not follow NB-23 for this repair, Client (user) required to
following ASME PCC-2, Article 203, External Weld Buildup to
Repair Internal Thinning and ASME PCC-2 do not require to do so
(RT or UT)………QC Engineer say!

Cont’d
2/5
Cont’d
3/4

QUIZ: ASME AND NBIC CODE KNOWLEDGE ISSUE 454


To compliance with requirement of NB-23, base on
background state on page 2 of this quiz, if you are
AI, do you accept this repair procedure?

QUIZ: ASME AND NBIC CODE KNOWLEDGE ISSUE 454


A. Yes.

B. No.

Reference Code para:_________________________________ 4/4

You might also like