Answer the following questions for new construction and/or alteration of a Shell and Tube Exchanger. The Shell and Tube are designed to operate as
independent chambers under the following conditions;
Note:
1. After put in services for a year, user required replace tube with material specification SA-312M Gr.TP316L, seamless and same size with original construction.
Cont’d
2/4
FIGURE 1
Cont’d
3/4
B. Alteration, para_______________________.
4/4