Professional Documents
Culture Documents
Chutchai Phromngam
Authorized Inspector & Supervisor
Line ID: cphromngam
cphromngam@eagle.org
Answer the following questions for new construction and/or alteration of a Shell and Tube Exchanger. The Shell and Tube are designed to operate as
independent chambers under the following conditions;
General Notes:
Cont’d
2/4
FIG-1
Tubesheet
Shell
Cont’d
ANSWER
3/4
A. 7 mm.
C. 13.5 mm.
D. 54 mm.