Construction Quality Management and Technical Supervision under India IAMWARM Project
Location within Country: Professional Staff Provided by Your
Tamil Nadu (State) Firm/Entity (profiles):
Name of Client: No. of Staff: 30
Superintending Engineer, Public Works Department, Designs Circle, Chepauk, Chennai No. of Staff-Months; Duration of Assignment: 350
Start Date (Month/Year): Completion Date (Month/Year): Approx. Value of Services
(in current INR): Rs.8.84 Crores February, 2011 September, 2015 Name of Associated Consultant(s), if any: No. of Months of Professional Staff Provided by Associated Consultant(s): 36 man-months Nil Nil Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed: Mr. Illangovan Team Leader Mr. A.B.S. Raj Basin Quality Management Engineer-I Mr. R.C. Balasubramaninan Raju Basin Quality Management Engineer-II Mr. Shambhu Azad Chief Engineer Mr. DVS Murthy Regional Manager (SR) Mr. A.K.Gahlot Dy. Chief Engineer Mr. Selva Kumar Social Specialist Mr. Stephen Leo Environment Expert Narrative Description of Project: The IAMWARM Project development objective is for selected sub-basin stakeholders to increase irrigated agriculture productivity in a sustainable water resources management framework. In addition to state-wide institutional strengthening for improved water resources management and irrigation service delivery, 63 sub-basins in 16 basin groups in Tamil Nadu have been targeted for physical intervention. The project will be implemented over a period of six years. Description of Actual Services Provided by Your Staff: The services to be provided by the Consultants have been briefly described as under: Quality management on all key aspects of civil works (including aspects of engineering, construction supervision, quality of materials and works, related environmental and social aspects, etc.) Establishing quality standards and development of manuals/guidelines for quality management and maintenance Technical adequacy of construction material quality/mix, storage, handling, use; and review of test results/certificates of such material Adequacy of safety measures related to construction Safe disposal of earth, debris, weeds, etc. Turfing of embankments and other relevant areas for erosion protection MOUs are signed with WUAs as required Acceptable quarry and borrow area identification and rehabilitation Technically sound layout and construction as per approved designs, drawings, technical specifications