Action Plan Elamal
Action Plan Elamal
Comp. ElAmal
Street Elobour
RESULT
City Elobour
Information of the evaluations ( II + III + IV ) II III IV
17.2.2019
performed by: Alaa Khaled
COMMENTS who
the plan for internal audit missing &the internal audit not made from 6-
2018 Q Mgr
not available Pur Mgr
missing Q Mgr
missing Q Mgr
missing Q Mgr
rodent trap missing I found on only and there is 6 on map ,risk assessment
missing,analysis missing ,plan missing glu trap without card the rodent
trap not installed well on floor Pest control company
inside produaction area Q Mgr
missing Q Mgr
corrective action plan
ElAmal
Elobour
Elobour
what when
internal audit plan 2019 is done and attached, next audit'll start 1 May
2019 1/5/2019
attached done
Eng. Company has reviewed the thermometers, calibration plan 2019 is
attached 1-Apr
planed to calibrate on April 1-Apr
planed to calibrate on April 1-Apr
WI Instruction is posted now and there is worker to verfy the adhere of
staff 1/3/2019
done 1/3/2019
done 1/3/2019