Minutes of Meeting
JPL Employee with Contractor Representative Date:03-06-2023
Name of Participants
JPL CENU Engineering Power Group
Name Sign Name Sign Name Sign
Abhinav Kr Mishra Navratan Patel Anjani
Mukesh Dube Lokeswar Boi Ishwar
Indrajeet Sahu
Sachin Patnayak

Safety
S.No. Description No. Action Taken / Future Plan Remark
1 No of BBS 28
Overspeeding on tractor - warning
2 No of Unsafe Act 3 PPE Faliure - warning
Using phone during working time - warning
U#4 E-pass BH railing provide
3 No of Unsafe Condition 2
U#4 E-pass BH edge protection
Housekeeping
S.No. Location Equipment Description Plan Vs Actual Remark
1 U#2 BAH Housekeeping continued
2

Next Day Plan


S.No. Location Equipment Description Plan Vs Actual Remark
CENU Engineering
1 AWPH EFWP-2 PM
2 ASPH ASP C-1,2,3 PM
2

3 U#3 BH E-PASS BAG HOUSE PM


4 U#4 BH E-PASS BAG HOUSE PM
5 TACH TAC-1 PM
6 SILO DRAIN LINE BETWEEN SILO-1 & 2 DRAIN LINE WELDING WORK
7 SPARE VP SILENCER NO.3 FABRICATION
8 U#3 FAL-1 SPOOL/PIPE REPLACEMENT SILO-1,2&3

9 SILO-1 LP SEAL LINE PIPE REPLACEMENT

10 SPARE CG NO.2 ASSEMBLY


FLOOR CLEANING & DRAIN PIPE CHECK LIST TO BE SUBMITTED
11 ALL BUIDING ROOF
TILL MONDAY
12 ALL DRAIN CONDITION CHECK LIST TO BE SUBMITTED

Power Group
CHIMNENY
1 SCRAP SHIFTING
AREA
2 ASH DYKE-2A ADL-1 NEW DP POINT ERECTION

Hard Copy of Duly signed MOM available in O&M Office AHP 4x600MW