FOCUS: Dampers Incheon Bridge – Korea

First use of VSL Dampers in Asia

▲ The slenderness of the structure and its exposure to severe environmental conditions meant that dynamic issues had to be
addressed, especially for the stay cables.

The Incheon Bridge is a major cable- for the stay cables. significantly reduced the amplitude of
stayed crossing in South Korea. the cable vibration, proving that their
When it opened in October 2009, it A team of VSL Korea in collaboration performance was in line with the
became the second connection with VSL Hong Kong was awarded a design expectations.
between Yeongjong Island and the contract by Samsung to design and
mainland of Incheon. install 192 VSL Friction Dampers
and 16 HDR Dampers on the
OWNER
The reinforced concrete bridge’s bridge’s stay cables. The design Incheon Bridge Co. Ltd. (BTO)
main cable-supported span is 850m work was carried out by VSL’s
long. The structure’s slender design Technical Centre in Singapore. CONSULTANT
and its location in an area exposed to Seoyoung Chodai
severe environmental conditions The HDR Dampers were all installed MAIN CONTRACTOR
meant that it was important to in March 2009; for the Friction Samsung JV
address dynamic issues, especially Dampers, the installation work
started in early September 2009 and VSL ENTITY
VSL Korea and VSL Hong Kong
Scope of works performed was completed by the end of the
month. DATE
• Damper system design and calculations
2009
• Supply and installation of 192 VSL
Friction Dampers In-situ testing was carried out in
• Supply and installation of 16 VSL
September 2009. The test results
Edited 2012

ID 3447

HDR Dampers showed that the dampers www.vsl.com