Abstract – A new method for determining the location of fault when one of the other lines is shortening to
single-phase-to-ground faults through pin insulation in power ground. In such cases short-circuit current occur and
networks with isolated neutral with using smart technologies cause damage to the equipment. Also this alarm
has been proposed. The developed device for determining the indicator have battery which will require service;
location of faults in the power network with an accuracy of
transmission tower. The features of connecting developed alarm indicator devices which are mounted on the
devices to existing SCADA-systems of network companies are aerial conductor [3]. They consist of three devices
described. which are mounted on each aerial conductor. Such a
device also is installed on each branch of the
Keywords – single-phase-to-ground faults, SmartGrid, search overhead line and allows to find out only a branch
for a fault location. where a fault happened;
short circuit indicator [4]. Such a device is mounted
I. INTRODUCTION
on the tower and works the same as the previous
In Ukraine all power networks of medium voltage ones, so it has similar principles of operation and
(6-10 kV) are built with isolated neutral. It gives a high shortcomings. However, it is powered by solar panels
reliability of power supply because the network works with and its battery also requires significant maintenance
single-phase-to-ground fault. costs.
When network is working with a single-phase-to-ground All of the above devices only allow narrowing down the
fault, the voltage on pin insulation is rising to line-to-line search area to the detected branch from the main line. After
value. It increases the probability of line-to-line fault which this, the fault should be found in the “traditional” way by
leads to urgent switching off the customers. The territory searching, when an emergency crew walks around the power
which can be switched off always is large. If the reclosing is line and performs visual inspection.
unsuccessful, many customers will stay without power
supply until emergency crew fixes problems in the overhead II. THE PURPOSE OF THE ARTICLE
line. For example, in [1] it is proposed to partition the
electrical network with switching devices to improve the The purpose of this article is to offer a device whose
reliability indicators of SAIDI, SAIFI and ENS. However, principle of action is based on a new method of detecting a
the search for the place of fault is still carried out by the single-phase-to-ground fault only through pin insulation on
emergency crew. the tower’s pole-arms in a 6-10kV overhead line with
isolated neutral and integration of these devices into existing
There are many ways to find the place where a single- SCADA systems.
phase-to-ground fault happened. Currently, in our country
the most common search method is based on the analysis of
the electromagnetic field along the overhead line. If the III. INNOVATIVE DEVICE
power line is long, the emergency crew can spend a lot of
time before finding that place. A. Installation of devices
It is proposed to install the device on the metal grounding
Currently, the following devices are used for determining descent of pole-arm of each overhead line tower. On the Fig.
the locations of fault: 1 you can see example of mounting device on the tangent
devices for the "traditional" search. It is «Poisk», tower with pin-type insulators.
«Zond», «Spektr», «Volna», «Kvant» and others; The electronic circuit board of the device is supposed to
alarm indicator devices which are mounted on the be hermetically filled with a compound for its moisture-
tower [2]. Such devices are installed at each branch of proofness.
the overhead line. It allows to record the presence of a
line-to-line fault on the branch and line-to-ground