Іntegration of New

Single-Phase-to-Ground Faults Detection Devices


into Existing SmartGrid Systems
Bezruchko Viacheslav Buinyi Roman Strogii Andrij
dept. of electrical systems and networks dept. of electrical systems and networks dept. of electrical systems and networks
Chernihiv National University Chernihiv National University Chernihiv National University
of Technology of Technology of Technology
Chennihiv, Ukraine Chennihiv, Ukraine Chennihiv, Ukraine
slavajm@meta.ua buinyiroman@gmail.com vmexanik1@gmail.com
Tkach Volodymyr
dept. of perspective development
PJSC "Chernihivoblenergo"
Chennihiv, Ukraine
v.tkach1972@gmail.com

Abstract – A new method for determining the location of fault when one of the other lines is shortening to
single-phase-to-ground faults through pin insulation in power ground. In such cases short-circuit current occur and
networks with isolated neutral with using smart technologies cause damage to the equipment. Also this alarm
has been proposed. The developed device for determining the indicator have battery which will require service;
location of faults in the power network with an accuracy of
transmission tower. The features of connecting developed  alarm indicator devices which are mounted on the
devices to existing SCADA-systems of network companies are aerial conductor [3]. They consist of three devices
described. which are mounted on each aerial conductor. Such a
device also is installed on each branch of the
Keywords – single-phase-to-ground faults, SmartGrid, search overhead line and allows to find out only a branch
for a fault location. where a fault happened;
 short circuit indicator [4]. Such a device is mounted
I. INTRODUCTION
on the tower and works the same as the previous
In Ukraine all power networks of medium voltage ones, so it has similar principles of operation and
(6-10 kV) are built with isolated neutral. It gives a high shortcomings. However, it is powered by solar panels
reliability of power supply because the network works with and its battery also requires significant maintenance
single-phase-to-ground fault. costs.
When network is working with a single-phase-to-ground All of the above devices only allow narrowing down the
fault, the voltage on pin insulation is rising to line-to-line search area to the detected branch from the main line. After
value. It increases the probability of line-to-line fault which this, the fault should be found in the “traditional” way by
leads to urgent switching off the customers. The territory searching, when an emergency crew walks around the power
which can be switched off always is large. If the reclosing is line and performs visual inspection.
unsuccessful, many customers will stay without power
supply until emergency crew fixes problems in the overhead II. THE PURPOSE OF THE ARTICLE
line. For example, in [1] it is proposed to partition the
electrical network with switching devices to improve the The purpose of this article is to offer a device whose
reliability indicators of SAIDI, SAIFI and ENS. However, principle of action is based on a new method of detecting a
the search for the place of fault is still carried out by the single-phase-to-ground fault only through pin insulation on
emergency crew. the tower’s pole-arms in a 6-10kV overhead line with
isolated neutral and integration of these devices into existing
There are many ways to find the place where a single- SCADA systems.
phase-to-ground fault happened. Currently, in our country
the most common search method is based on the analysis of
the electromagnetic field along the overhead line. If the III. INNOVATIVE DEVICE
power line is long, the emergency crew can spend a lot of
time before finding that place. A. Installation of devices
It is proposed to install the device on the metal grounding
Currently, the following devices are used for determining descent of pole-arm of each overhead line tower. On the Fig.
the locations of fault: 1 you can see example of mounting device on the tangent
 devices for the "traditional" search. It is «Poisk», tower with pin-type insulators.
«Zond», «Spektr», «Volna», «Kvant» and others; The electronic circuit board of the device is supposed to
 alarm indicator devices which are mounted on the be hermetically filled with a compound for its moisture-
tower [2]. Such devices are installed at each branch of proofness.
the overhead line. It allows to record the presence of a
line-to-line fault on the branch and line-to-ground

XXX-X-XXXX-XXXX-X/XX/$XX.00 ©20XX IEEE


Fig. 3. Prototype of the proposed device
In the event of a single-phase-to-ground fault current
through the pin-type insulator on one of the overhead line
towers, the current flows through an insulator on this
support, a pole-arm into the ground. The value of this current
for Ukrainian overhead electrical networks 6-10 kV with an
1 – pin-type insulator, 2 – pole-arm, insulated neutral is in the range of 0.5 to 20 Amps.
3 – reinforced concrete rack overhead line tower,
4 – the armature of the grounding, 5 – steel rod, This current flows through the current transformer of the
6 – the proposed device is filled with compound. proposed device and feeds the energy storage. Having
Fig. 1. Tower of the overhead power line with proposed accumulated a sufficient amount of energy, the device sends
device a message to the control center. The message is sent via
GSM communication channel.
In normal operating condition of the network (absence of
fault current through the tower) the device is without power It is important to highlight that the message is sent not at
supply. As a result, the device has high reliability. the moment when fault happened. At first, the energy storage
must accumulate energy. It can take several minutes. It
It is known from statistics that more than 90% of a depends on the value of the fault current. But it is still faster
single-phase-to-ground faults take place through pin-type than the “traditional” or other way of search.
isolator. Therefore, such placement of a sensor will allow to
track most of the faults. Detailed information about principle of action,
construction, specific of used and calculations can be found
B. Principle of operation in the article [5].
On the Fig. 2 it is shown a connecting circuit device to
the fittings of the grounding. C. Existing prototype
Prototype of proposed device was built and it was tested
The device has the current transformer on its input. The in the laboratory and in the existing power line. Device photo
device is powered through this transformer built on toroidal is showed on the Fig. 3. This device was patented [6].
core. Armature of the pole-arm grounding must be threaded
through toroidal core. This prototype showed that it can accumulate energy and
send a message in 5-10 minutes if the current is 2 Amps. If in
As you can see, that connected device doesn’t change the other overhead line the current of single-phase-to-ground
grounding system. fault is larger, the time will decrease.
The value of the single-phase-to-ground fault current
through the pin-type insulator in the electric network of 6-
10 kV can be calculated by the formula obtained by the
method of equivalent generator:

U line to line


 I line to  ground fault   
2
 1 
3 R 
2

 3  C 

where Uline-to-line – RMS value of nominal line-to-line voltage


of power distribution lines; R – fault resistance at the place of
the fault; ω – angular frequency (in Ukraine 314 rad/s);
C – the total capacity of the overhead line, that powered by
Fig. 2. Circuit that connects the device to the fittings one section of busbar of substation.
From the above formula it can be seen that the highest connected. Third level is the level of main control center to
value of the single-phase-to-ground fault current which many information line from local centers are
I maxline-to-ground fault will occur when R=0. However, as a rule, connected. All control centers use MicroSCADA Pro
all fault through the insulator of overhead line 6-10kV have software from ABB. Structure of the SCADA-system like
some fault resistance. On Fig. 4 it is shown how single- this is the same in most of power network companies in
phase-to-ground fault current changes when fault resistance Ukraine.
changes from zero to a high level.
Third system is geographic information system (GIS).
GIS is a computer system for capturing, storing, checking,
and displaying data related to positions on the Earth's
surface. In the Chernihiv region the most overhead power
line towers 6-10kV with their substations 10(6)/0.4kV have
been already added to the GIS database with its coordinates
and location on lines. This system is used to quickly
coordinate operations during power network exploitation.

B. Connection to the main systems


Information should come to the server of SCADA-system
into the local control center which is located in the region
because regional services have to fix faults.
To connect to existing systems, we should use such
equipment as a GSM-modem connected to programmable
logic controller (PLC). Proposed circuit is showed on Fig. 5.

Fig. 4. Dependence of fault current on fault resistance


The proposed device can detect the location of a single-
phase-to-ground fault, but device will have a zone of low
sensitivity (its zone is shown on Fig. 4). If a single-phase-
ground fault current is so low, the detection time will be
long.
It should be noted that the fault resistance changes over Fig. 5. Scheme of integration of the device into the existing
time. If the searching time for fault takes a long time, such systems
faults can go off and then recur [7-8]. It can give many
problems when you use "traditional" way to searching. The The message, which the proposed device sends to the
proposed device allows to identify such faults, but this may server, consists of a unique code for the device. This code
take indefinite time. As you can see that low sensitivity zone must be in the database and have an equivalent tower on the
start from R>11.5 kOhm. power line. When that code arrives into the control center
server, the control center converts it and recognizes where
the single-phase-to-ground fault happened. After that the
IV. ІNTEGRATION INTO EXISTING SYSTEMS data should be sent up to main server where data will be
saved in the event log.
A. Existing systems
Consider existing systems in Ukrainian companies on the The data should also be sent to GIS. This system can be
example of the PJSC “Chernihivoblenergo”, which provides used for visual presentation of data about single-phase-to-
services of electricity distribution in the power networks of ground faults and their place. Operating personnel can use it
Chernihiv region. Today in PJSC “Chernihivoblenergo” for navigation when they are fixing fault.
there are several separate systems to control the networks.
C. Using information
First system is automated electricity commercial
metering system. This system is used only for commercial Currently, a dispatcher receives a single-phase-to-ground
metering energy. fault notification in the SCADA-system monitor, after which
the emergency crew is sent to go along the overhead line and
Second is SCADA-system, which is used to monitor the search for the fault. GIS is used only for navigation on the
power network state and related measurements, and then to terrain, building a route for a brigade, analyzing access
perform the control actions needed [9]. Existing SCADA- roads, etc.
system of PJSC “Chernihivoblenergo” consist of three levels.
First level is the level of stations and power lines. There are If the proposed device is installed on the towers of the
located equipment for monitoring and measurement. Second overhead line, the process of fining the place of single-phase-
level is the level of local control center. There are located to-ground fault will be drastically different. After the fault
control room and local server to which the information line has occurred, the emergency crew starts preparing for
from the equipment of substation and power line are departure, which takes at least 10 minutes. During this time
the message from the device will arrive to the GIS.
Fig. 6. Screenshot from the GIS system with an example message about the fault
Therefore, a detection time of the fault location of 10 of the national companies of Ukraine is proposed using the
minutes is sufficient. If the emergency crew receives a example of the PJSC “Chernihivoblenergo”.
message about the place they will immediately go to fix the
problem. The Fig. 6 shows a part of plan of Ripki village Using this device will allow to quickly determine the
from this GIS system with overhead power line with all location of fault (even in case of single-phase-to-ground fault
towers and an example message about the fault. As you can with high fault resistance – up to 11 kOhm) and coordinate
see the tower with fault is marked with red color and table the repair emergency crew to the place of damage.
with unique device code, overhead line control name and The result of the implementation of the proposed system
number of tower is shown. will be improvement of the reliability of power supply
The information provided will allow the emergency crew SAIDI, SAIF and ENS.
to minimize the search time and eliminate the damage.
REFERENCES
As a result, the proposed device will improve the
[1] R. Buinyi, I. Dikhtyaruk, V. Zorin, “The automatic sectionalization of
reliability of electricity supply SAIDI, SAIFІ and ENS. the distributing networks with high voltage of 6-10 kV with
application the disconnectors of new generation,” Tekhnichna
D. Security or defense against attack elektrodynamika, Issue 3, pp.70-75, 2014.
As you can see this system use GSM-network. It gives [2] A.A. Kucheryavenkov, A.S. Karpashev, “Device for determining the
location and type of damage to the overhead power line,” Russia
advantages to connect. Today Ukrainian providers have big Patent for utility model №126144, 2013.
mobile coverage, which covers the territory of Ukraine [3] A3 Group, “Kit of faulted circuit indicators,” OHL Fault Indicators
almost entirely. Range, 2017. [Online]. Available: https://www.a3.energy/products-
bottom/ohl-fault-locator [Accessed: Dec. 10, 2018].
But GSM-network is a public network with public
[4] M.M. Cheremisin, V.M. Zubko, V.O. Korobka, H.A. Sidorov,
internet [10-11]. Somebody can try to use this public connect A.A. Pyrozhenko, “Short-circuit lock,” Ukraine Patent №64352 А,
to make false messages. This action doesn’t crash system but 2004.
can make trouble for operating personnel. [5] V.M. Bezruchko, R.O. Buinyi, A.Y. Strogii, V.I. Tkach, “Application
of GSM technology for identification of phase-to-ground faults in
For defense against attack, specific recommendations electric networks with isolated neutral and pin-type isolation,”
must be met. Tekhnichna elektrodynamika, Issue 5, pp.96-99, 2018.
At first, all proposed devices must have a SIM-card with [6] V.M. Bezruchko, R.O. Buinyi, A.Y. Strogii, V.I. Tkach, “Device for
identification of signel phase-to-ground faults in electric networks
a special service. This card doesn’t have connection to the with isolated neutral,” Ukraine Patent application № a 2018 03974.
internet but have unique VPN connection to the local center [7] Yu.L. Saenko, A.S. Popov, “Investigated ferroresonance processes
equipment. This service exists and is used in Ukraine to save without ground fault,” Tekhnichna elektrodynamika, Issue 6, pp.51-
data in Meteorological stations. 57, 2012.
[8] A.L. Kozlov, “Method of searching the place in single-phase earth
Second, information about single-phase-to-ground fault fault in networks of overhead power lines with 6-35 kV voltage and
should be duplicated using substation telemechanics. device, it implements,” Elektrobezopasnost, Issue 1, pp.4-8, 2016.
[9] Rajib Baran Roy, “Controlling of Electrical Power System Network
CONCLUSION by using SCADA,” International Journal of Scientific & Engineering
Research, Volume 3, Issue 10, pp.1-6, 2012.
A device for determining the location of the single-phase- [10] C.-W. Ten, C.-C. Liu, and M. Govindarasu, “Cybersecurity for
to-ground fault in distribution power networks of 6-10 kV, electric power control and automation systems,” IEEE International
which is based on the no classical way, is proposed. Conference on System, Man and Cybernetics, 10, 2007, pp. 29-34.
[11] D. Watts, “Security and vulnerability in electric power systems,” 35th
The structure of the information system for the North American Power Symposium, University of Missouri-Rolla in
integration of this device into the existing SmartGrid systems Rolla, Missouri, 2003, pp. 559-566.