THE INDICATIVE LIST OF LENDER’S INDEPENDENT ENGINEER ASSIGNMENTS

HANDLED BY ITCOT

S. No Client / Project Location / State Bank Sector


Sri Balaji Tollways
(Madurai) Pvt. Ltd,
Madurai – LIE for
Widening & Four Laning of
existing Madurai Ring
Madurai, Road /
1. Road at Madurai  UCO Bank
Tamil Nadu Infrastructure
Meenakshi Mission
Hospital to Kappalur in
State of Tamilnadu On
BOT Basis

New Delhi,
JKM Infra Projects Ltd -
Gorakhpur (Uttar
Road Transport &
Pradesh),
Highway and Construction  State Bank of Road /
2. Bihar, Kisangani,
works – Govt.of India - India Infrastructure
Bhubaneswar
Toll Road for various
(Odisha),
projects.
Aizawl (Mizoram)
1. Lateri –
Anandpur –
Bhagwantpur
2. Tuonda-
Ganjbasoda
KCC Lateri Expressway 3. Itkhedi-
Road /
3. (P) Ltd – LIE for five Major Raslakhedi  ICICI Bank
Infrastructure
District Roads (MDRs) 4. Kurawar-Iklera-
Talen
5. Ankhia-
Dongargaon
Road, Madhya
Pradesh
VARHA Infra Limtied – LIE
for various Road Projects
1. Six Laning of Amritsar 1. Amritsar-
- Jalandhar Jalandhar
 State Bank of Road /
4. 2. Four Laning of Solapur (Punjab)
India Infrastructure
to Maharashtra/ 2. Solapur
Karnataka Border on (Maharashtra)-
NH9 in State of Karnataka
Maharashtra on EPC Border
S. No Client / Project Location / State Bank Sector
basis 3. Amritsar
3. Bus Rapid Transit (Punjab)-India
System in Amritsar Gate, Delhi
Corridor No.1 Albert 4. Amritsar
Road Junction to India (Punjab)
Gate
4. Bus Rapid Transit
System in Amritsar
Corridor No.3
Bhandari Bridge
Round About to
Daburji Bye Pass

VIL Limited – LIE for


Various Road Projects
1. Two Laning of
Raebareli to Allahabad
1. Raebareli -
Section of NH-24 B
(Prayagraj)
from Km82/0 to Km
Allahabad, Uttar
188/600 in the State of
Pradesh  State Bank of Road /
5. Uttar Pradesh
India Infrastructure
2. Four laning of Kiratpur
2. Kiratpur Sahib -
- Ner Chowk Section
Ner Chowk,
of NH-21 (from km
Himachal Pradesh
73.200 to km 186.500)
in the State of
Himachal Pradesh

KCC Roads Construction


Pvt. Ltd – LIE for
Development of Sijhata-
Hinoti-Malgaon-
Khamariya-Ater, Poudi-
Maharajpur-Parsamaniya
Road /
6. and Mangawar – Madhya Pradesh  Allahabad Bank
Infrastructure
Bekunthpur Major District
Roads under Package – X
in the state of Madhya
Pradesh on BOT (Annuity)
Basis
S. No Client / Project Location / State Bank Sector
JKM Infra Projects Ltd –
Assam, Bihar,
LIE for various Road  State Bank of Road /
7. Mizoram, Indo-
Projects India Infrastructure
Nepal Border

BBT Elevated Road


Private Ltd – LIE for
Elevated Road between
Jinjira Bazaar and Kolkata, West  State Bank of Road /
8.
Batanagar on Budge Trunk Bengal India Infrastructure
Road in Kolkata on DBFOT
Basis

DPJ Bidar Chincholi


(Annunity) Road Project
Pvt. Ltd – LIE for
Reconstruction and
widening of stretch of 60
Kms on assistance from
World Bank in the State of
Karnataka on Hybrid Road /
9. Karnataka  Bank of Baroda
Annuity Basis. The road Infrastructure
project of DPJ Bidar is
under Design, Build,
Finance, Operate,
Maintain and Transfer
(DBFOMT) of Bidar Ekhelli
Chincholi Sector

DBL Hassan Periyapatna


Tollsways Ltd – LIE for
Two Lane length of 73.69
Kms approx. in the state
of Karnataka with
Hassan -
Karnataka Road
Ramanathapura -  United Bank of Road /
10. Development Corporation
Periyapatna, India Infrastructure
Ltd (KRDCL) under
Karnataka
DBFOMT on Semi-Annual
Annuity Basis of Hassan –
Ramanathanpura –
Periyapatna Stretch
S. No Client / Project Location / State Bank Sector
Aravali Infrapower
Limited- LIE for various
Infrastructure projects –
 State Bank of
11. Roads, Bridges, UP, MP, Bihar Infrastructure
India
Construction Projects,
Buildings across India.

NKG Infrastructure Ltd –


LIE for various
Infrastructure Projects  State Bank of
12. Delhi & Haryana Infrastructure
viz, Roads, Bridges, India
Buildings & Hospitals

SKLS Galaxy Mall


LIE for establishing a new Redhills,
 State Bank of Real Estate &
13. shopping mall cum Thiruvallur Dist.,
India Housing
multiplex project Tamil Nadu

IIT Madras Research Park


(IITMRP) - LIE for
monitoring and report on
the contract schedule.
Chennai,  State Bank of Real Estate &
14. Cash flows and present
Tamil Nadu India Housing
status of construction of
Phase II at Kanagam
Road, Taramani, Chennai.

R.G. Residency – LIE


Noida, Real Estate &
15. study on Housing Project  Allahabad Bank
Uttar Pradesh Housing

Shipra Leasing Pvt. Ltd –


LIE Work for Sky Heights Ghaziabad, Real Estate &
16.  Client
Project Uttar Pradesh Housing

Hind Charitable Trust –


 Allahabad
LIE study on establishing a Lucknow,
17. Bank, New Education
Medical college Uttar Pradesh
Delhi

Aqua Designs India Pvt.


Ltd – LIE for Water  State Bank of Water Supply /
18. Bihar
Treatment & STP at IOCL India Infrastructure
Barauni Refinery Plant
S. No Client / Project Location / State Bank Sector
Varanasi STP Project
Pvt. Ltd – LIE for
Varanasi, Water Supply /
19. Sewerage Treatment  Yes Bank
Uttar Pradesh Infrastructure
Plant

Essel Gulbarga Solar


Energy Pvt. Ltd – LIE Energy /
Nimbal, Bijapur
20. study for 5.5 MW Solar  Allahabad Bank Renewable
District, Karnataka
Power Project Energy

Trimex Sands Pvt. Ltd –


Energy /
LIE study for 10 MW Solar Nokha, Bikaner  Indian
21. Renewable
Power Project District, Rajasthan Overseas Bank
Energy

Essel Bagalkot Solar


Energy Pvt. Ltd – LIE Energy /
Nimbal, Bijapur
22. study for 5.5 MW Solar  Vijaya Bank Renewable
District, Karnataka
Power Project Energy

Shri Keshav Cements &


Infra Ltd – LIE study for Energy /
Koppal,
23. 20 MW Solar Power  Syndicate Bank Renewable
Karnataka
Project Energy

Aavanti Solar Power Pvt.


Energy /
Ltd – LIE study for 20 MW Haveri District,  Union Bank of
24. Renewable
Solar Power Project Karnataka India
Energy

Mayfair Solar Power Pvt.


Energy /
Ltd – LIE study for 20 MW Gadag District,  Union Bank of
25. Renewable
Solar Power Project Karnataka India
Energy

Rays Infra Ltd, Jaipur


- Solantra Pvt. Ltd
- Heliocare Pvt. Ltd
- Insolexo Pvt. Ltd Energy /
Jaipur,  State Bank of
26. LIE for Monitoring Renewable
Rajasthan India
Progress of 9.0 MW Solar Energy
Power Project for the
above three companies.
S. No Client / Project Location / State Bank Sector
Blyth Wind Park Private
Borampalli
Limited- LIE study for Energy /
Village,
27. 25.6 MW Wind Power  Bank of Baroda Renewable
Kalyandurg Taluk,
Project Energy
Anantpur District

Atria Wind Power


Limited – LIE study
Gangadevipalli Energy /
setting up of 25.5 MW  Central Bank of
28. Village, Kadappa, Renewable
Wind Power Project (15 India
Andhra Pradesh Energy
WTGs of GE 1.7 MW each)

Atria Solar Thermal


Power Pvt Ltd – LIE study
Energy /
for 10 MW Parabolic Nagalapur Village,
29.  IFCI Limited Renewable
Trough based Solar Karnataka
Energy
Thermal Power Project

 Union Bank of
India
OPG Power Generation
 Corporation Energy /
Pvt. Ltd – LIE study for Gummidipoondi,
30. Bank Renewable
1x180 MW coal based Tamil Nadu
 Bank of India Energy
Thermal Power plant
 Indian
Overseas Bank
NPA Clean Energy Pvt.
Ltd- LIE study for 25.6
MW Project to be set up Anantapur Energy /
 Bank of
31. at Borampally Village, District, Andhra Renewable
Baroda,
Kalyandurga Taluk, Pradesh Energy
Anantapur District, AP

 Punjab
National Bank
 Central Bank of
Bhalkeshwar Sugars Ltd – India
LIE study for Sugar mill Bhalki, Bidar  Corporation Sugar &
32.
(2500 TCD with 14MW co- District, Karnataka Bank Distillery
gen) complex  Karnataka
State Co-Op.
Apex Bank
S. No Client / Project Location / State Bank Sector
Dhanalakshmi Srinivasan  Indian overseas
Sugars (P) Ltd – LIE study Bank
Perambalur, Sugar &
33. for Sugar mill (3500 TCD  Indian Bank
Tamil Nadu Distillery
with 26MW co-gen)  Bank of India
complex  IREDA
Indian Technometal
Company Limited– LIE
Vizag,  Punjab
34. study for a Steel Metallurgical
Andhra Pradesh National Bank
manufacturing Unit

Innovative Textiles Pvt.


Ltd – LIE for Textile Butibori, Nagpur,  Indian
35. Textile
Manufacturing Company Maharashtra Overseas Bank

Nitin Spinners Ltd – LIE


Hamirgarh,
for the expansion of  Punjab
36. Bhilwara Dist., Textile
Textile unit National Bank
Rajasthan

Erode Textile Mall


Limited – LIE study for an  Indian
37. Integrated Textile Erode, Tamil Nadu Overseas Bank Textile Park
Marketing Complex  Bank of India

Balaji Precision Tubes


(India) Pvt. Ltd – LIE
Raigad,  Syndicate Bank
38. study for CDW & ERW Manufacturing
Maharashtra
Tubes Manufacturing Unit

Floking Pipes Pvt. Ltd –


LIE study for PVC pipes Sriperumbudur,  Punjab
39. Manufacturing
manufacturing unit Tamil Nadu National Bank

Ultimate Flexipack Ltd –


LIE study for Packaging
Unit & part financing of  Union Bank of
40. New Delhi Packaging
Plant & Machinery items India
under CAPEX Plan

MGM Healthcare Pvt. Ltd Anna Nagar,


Pharma &
41. – LIE study on Super Chennai, Tamil  Indian Bank
Healthcare
Speciality Hospital Nadu
S. No Client / Project Location / State Bank Sector
Shree Naman Healthcare
Pvt. Ltd – LIE for setting Mumbai, Pharma &
42.
up of Hospital Maharashtra Healthcare

Accord Life Spec Pvt. Ltd


Oragadam,
– LIE study for the Cancer  Punjab Pharma &
43. Chennai, Tamil
Drug Manufacturing Unit National Bank Healthcare
Nadu

Pavitra Milk Products


Pvt. Ltd – LIE work on Neemrana, Agriculture &
44.  Client
Milk Processing unit Rajasthan Food Processing

White Circle Mercantile


Pvt. Ltd – LIE for the cost
estimation of the Mumbai,
45.  Vijaya Bank Trade Finance
proposed Capital Maharashtra
Expenditure by WCMPL

Modern Assets (SEZ) Pvt.


Ltd – LIE study for IT SEZ Bangalore,  Karur Vysya
46. Infrastructure
Project Karnataka Bank

KCP Cement Ltd – LIE for


the expansion of Cement  State Bank of Building
47. Andhra Pradesh
Plant India Material

Munoth Industries Ltd –


LIE study for Lithium Chennai, Tamil
48.  Indian Bank Electronics & IT
Polymer Cell Nadu
Manufacturing Project
GM Sugar and Energy Ltd
– LIE for Monitoring and
Implementation of Sugar Bangalore,  Union Bank of Sugar &
49.
factory expansion from Karnataka India Distillery
2500 TCD to 4800 TCD

Sharada Educational
Trust – LIE study for
Koppal,  State Bank of
50. establishing State Board Education
Karnataka India
School, CBSE School and
PU College
S. No Client / Project Location / State Bank Sector
Casa Grande Pvt. Ltd –LIE  State Bank of
Bangalore, Real Estate &
51. for the Luxus Villas India
Karnataka Housing
Project
Mandhana Industries Ltd
– LIE study for Textile
Thane, Mumbai,
52. company – manufacturing  Allahabad Bank Textile
Maharashtra
of Fabrics and Garments

Shree Sainath
Enterprises Construction
and Developers Pvt. Ltd Mumbai, Real Estate &
53.  Vijaya Bank
– LIE study for the Real Maharashtra Housing
Estate Project

Man Global Ltd – LIE


study for Man Nexus &
Navi Mumbai,  Union Bank of Real Estate &
54. Man Opus Residential
Maharashtra India Housing
Project

Ginni Filaments Ltd – LIE


Kosi, Panoli,
study for Filaments  State Bank of
55. Haridwar, Textile
Manufacturing unit India
Uttar Pradesh

BGR Energy Systems Ltd


Energy /
– LIE study for Lara
56. Chhattisgarh  Allahabad Bank Renewable
Thermal Power Project
Energy

Omaxe Chandigarh
Extension Developers (P)
Chandigarh,  Yes Bank, Hospitality &
57. Ltd – LIE Report for
Punjab Tourism
Resort project

 State Bank of
Lagnam Spintex Ltd – LIE
India
58. study for a Spinning Unit Rajasthan Textile
 Punjab
(36000 Spindles)
National Bank
Sukhbir Agro Energy Ltd
– LIE study for 18 MW Energy /
 Union Bank of
59. Biomass Power Project New Delhi Renewable
India
Energy
S. No Client / Project Location / State Bank Sector
Tara Investments Ltd –
LIE study for 6000 MT
Ganjam,
60. multipurpose cold storage  Allahabad Bank Cold Storage
Odissha
unit

Winterfell Realty Pvt.


Ltd – LIE study for the SEZ Trivandrum,  Union Bank of
61. Infrastructure
Project Kerala India

Sentini Flopipes India


Ltd – LIE study for
Hyderabad, CPVC/UPVC
62. manufacturing of CPVC &  Bank of Baroda
Telangana Pipes
UPVC pipes and fittings

DS Toll Road Ltd – LIE


study for implementation
of 4 Laning of the
Dindigul-
erstwhile 2 Lane portion Road /
63. Samayapuram,  IDFC First Bank
of the Dindigul- Infrastructure
Tamilnadu
Samayapuram Section of
NH-47 in Tamilnadu State

Sai Priya Sugars Ltd – LIE


Report for setting up of
 The Karnataka
additional 120 KLPD
Bangalore, State Co- Sugar &
64. Ethanol Unit in addition
Karnataka operative Apex Distillery
to the existing 120 KLPD
Bank Ltd
Ethanol Unit

St. Peters Medical


College cum Hospital –
Hosur,
65. LIE study for establishing  Indian Bank Education
Tamilnadu
a Medical College cum
Hospital
Chandhan Steel Ltd – LIE
Report on the wire rod Umbergaon,  United Bank of
66. Metallurgical
mill project Gujarat India

SRM Institute of Science


& Technology – LIE
67. Sonepat, Haryana  Axis Bank Education
Report for SRM Education
and Research Institute
S. No Client / Project Location / State Bank Sector
SRM Institute of Science
& Technology – LIE Amaravathi,
68.  Indian Bank Education
Report for SRM University Andhra Pradesh

Shri Rathna Akshaya


Estates Pvt. Ltd – LIE Pallavaram,
 State Bank of Real Estate &
69. Report for the Chennai, Tamil
India Housing
construction of Retail Nadu
Store
TGV-SRAAC Ltd – LIE for
expansion of Godipara,
Chemical &
70. Chloromethane Kurnool, Andhra  IFCI Ltd
Allied products
manufacturing unit Pradesh

Kochi Metro Rail Ltd – LIE


report for Kochi Metro Eranakulam,  Union Bank of Rail /
71.
Rail Kerala India Infrastructure

Flowchem Pharma Pvt.


Ltd – LIE report for Hindupur,  State Bank of Pharma &
72.
Pharma manufacturing Andhra Pradesh India Healthcare

Fatehabad Bio Energy


LLP – LIE report for 9.9 Energy /
Fatehabad,  State Bank of
73. MW Biomass Power Renewable
Haryana India
Project Energy

Bilagi Sugar Mill Ltd – LIE  The Karnataka


report for implementation Bagalkot, State Co- Sugar and
74.
of 60 KLPD Distillery Plant Karnataka operative Apex Distillery
Bank Ltd
AMP Solar Evolution P
Begampur, Tilhar Energy /
Ltd – LIE report on 28
75. Villages, Uttar  IREDA Renewable
MWp DC/20 MW ac Green
Pradesh Energy
Field Solar Power Project
Antariksh Warehousing
and Logistic Parks Pvt.
Ltd – LIE on Construction Bhaproda,
76.  Bank of Baroda Logistics
and Development of Haryana
Indospace Industrial and
Logistic Park
S. No Client / Project Location / State Bank Sector
Telangana Fiber Grid
Corporation Ltd – LIE for  Bank of
77. Telangana Electronics & IT
monitoring of Fiber Grid Maharashtra
Project
H.G. Rewari Bypass Pvt.
Ltd – LIE on Construction
of Rewari Bypass (NH-1))
Rewari District, Road /
78. as Feeder Route in Rewari  Canara Bank
Haryana Infrastructure
District (Design Length-
14.40 km) on Hybrid
Annuity Mode (HAM)
Vinayaka Microns (I)
Private Limited – LIE for
expansion of the existing Hyderabad  State Bank of Chemical &
79.
chemical manufacturing Telangana India Allied Products
facility

Saisudhir Energy Ltd –


LIE for modernization of Energy /
Ananthapur
80. the existing solar power  Canara Bank Renewable
Andhra Pradesh
plant Energy

Hild Energy Pvt. Ltd – LIE


for development of Energy /
81. 150MW Solar Power Rajasthan  Axis Bank Renewable
projects for NTPC under Energy
EPC mode
Apollo Hospitals
Educational & Research
Foundation (AHERF)– LIE Chittoor Pharma &
82.  Axis Bank
for setting up of “Apollo Andhra Pradesh Healthcare
Health & Knowledge City”
(AHKC)
Trishul Build Tech &
Infrastructure Pvt. Ltd)–
LIE for monitoring the
implementation of 5 star Mumbai  Union Bank of Hospitality &
83.
Hotel for M/s. MRG group, Maharashtra India Tourism
Bangalore under
‘Marriott’ brand name
S. No Client / Project Location / State Bank Sector
Jind Bio Energy LLP– LIE
Energy /
for 9.9 MW Biomass Power  State Bank of
84. Haryana Renewable
plant India
Energy

Polymatech Electronics
Pvt. Ltd – LIE for
Oragadam
85. implementation of LED  Bank of Baroda Electronics & IT
Tamil Nadu
lights manufacturing unit

Tanishq Hotels & Resorts


P Ltd – LIE for monitoring
Bangalore  State Bank of Hospitality &
86. the construction of 3 Star
Karnataka India Tourism
Hotel

Narbheram Solar TN
Private Limited – LIE for Energy /
Tuticorin
87. monitoring of 100 MW  IREDA Renewable
Tamil Nadu
Solar power project Energy

Rayalseema Expressway
Private Limited – LIE for
 NIIF
4 laning Road project in
Infrastructure Road /
88. the state of Andhra Andhra Pradesh
Finance Infrastructure
Pradesh having length of
Limited
188 km.

BRFM India Pvt. Ltd – LIE


for monitoring the
execution of 50,000 Bangalore  State Bank of Agriculture &
89.
MT/PA Wheat Flour Mill Karnataka India Food Processing
expansion project

Twenty Fourteen Hotels


India (P) Limited – LIE for
Bangalore Hospitality &
90. Hotel Marriott under  CSB Bank
Karnataka Tourism
construction

Avaada Green HN
Project Private Limited – Sirsa Energy /
91. LIE for 50MW AC Solar PV Haryana  Bank of Baroda Renewable
project Energy
S. No Client / Project Location / State Bank Sector
Mullur Solar Parks
Private Limited – LIE for Energy /
Raichur
92. monitoring of 20MW Solar  IREDA Renewable
Karnataka
Power project Energy

MRN Cane Power (India)


Limited – Final certified
 Karnataka
LIE Report for the Bagalkot
State Co- Sugar &
93. establishment of new 200 Karnataka
operative Apex Distillery
KLPD MRN Cane Distillery
Bank
project of Ethanol plant

Rishabh Energy Private


Energy /
Limited – LIE for Bikaner
94.  IREDA Renewable
monitoring of 10MW Solar Rajasthan
Energy
Power project
Voora Property
Developers Pvt. Ltd – LIE
for construction of Chennai Real Estate &
95.  Indian Bank
residential & commercial Tamilnadu Housing
space named as
“Ocean’27”
Torrent Gas Chennai
Private Limited – LIE for
Chennai and
implementation of City  State Bank of
96. Tiruvallur districts Infrastructure
Gas Distribution (CSD) India
Tamil Nadu
network

Shree Kedarnath Sugar


and Agro Products Ltd –  Karnataka
LIE for certifying the Bagalkot State Co- Sugar &
97.
expansion of sugar plant Karnataka operative Apex Distillery
from 2500 TCD to 5000 Bank
TCD
NVNR (Ramannapet I)
Power Plant Private Ltd
and NVNR (Ramannapet
Energy /
II) Power Plant Private Yadadri
98.  Axis Bank Renewable
Ltd – LIE for setting up of Telangana
Energy
15 MW (each) AC Solar
based power plant under
Group Captive scheme
S. No Client / Project Location / State Bank Sector
Sri Manakula Vinayaga
Educational Trust – LIE
for monitoring interior
99. work and other facilities Pondicherry  Indian Bank Education
like AC & Lab equipments
and Computers and
Accessories
Mylar Sugars Pvt. Ltd –
LIE for expansion of
 The Karnataka
existing 90 KLPD to 240
Bellary State Co- Sugar &
100. KLPD Molasses based and
Karnataka operative Apex Distillery
240 KLPD Grain based
Bank Ltd
Dual Feed
Distillery/Ethanol Plant
Rare SS Properties India
Pvt. Ltd – Construction
monitoring of establishing
a retail store in 2.43
acres of land and Madurai  State Bank of Real Estate &
101.
proposed to built into two Tamilnadu India Housing
Multi-storeyed
Commercial Buildings
with a total extent of
6,30,203 sq.ft.
Shri Keshav Cements and Energy /
Koppal
102. Infra Limited – LIE for 10  Canara Bank Renewable
Karnataka
MW Solar Project Energy
RPP Infra Projects
Limited – LIE for
upgrading of Malliyakarai
– Rasipuram –
Tiruchengode – Erode
Road (SH-79) to Four
Lane with paved
Road /
103. shoulders and Tamilnadu  Indian Bank
Infrastructure
Construction of Two Lane
elevated corridor
including service road on
either side and providing
ramp to Sankagiri
Pallaipalaym Road and
Maintenance of entire
S. No Client / Project Location / State Bank Sector
project stretch of 11.153
km for a period of 7 years
in the state of Tamilnadu
on EPC mode

Visakha Glass Pvt. Ltd –


LIE for setting up of
600TDP Solar Glass
Energy /
Manufacturing plant of Mundra  State Bank of
104. Renewable
various thickness ranging Gujarat India
Energy
from 1.60 mm to 4.00 mm
required for Solar
Photovoltaic (PV) Modules
L&T Finance Limited –
LIE for 4 laning
construction of Sannur to
Bikanakette section from
existing Km 698.850 to  L&T Finance Road /
105. Madhya Pradesh
existing Km 744.190 Ltd Infrastructure
(Design 45.01 Km) of NH-
169 under Bharatmala
Pariyojana on Hybrid
Annuity Model (HAM)
Hindage Oilfield Service
Limited – LIE on Date of
Commencement of
Mumbai
Commercial Operation of
106. Maharashtra  Axis Bank Infrastructure
the Vessel – “Prem Pride”
– Chartering of Floating
Storage and Offloading
Vessel
Jigajinagi Jagtap Solar
Power Private Limited – Energy /
Bijapur
107. LIE for monitoring of 3  IREDA Renewable
Karnataka
MW capacity Solar PV Energy
Project
Jolle Hospitality Group –
LIE for 5 Star Hotel
Hospitality &
108. project with 91 rooms, Karnataka  Canara Bank
Tourism
Club House and Banquet
Hall
S. No Client / Project Location / State Bank Sector
Swelect Renewable
Energy Pvt. Ltd – LIE for
development of 11 MW AC
Thiruchirapalli, Energy /
Solar Power Plant under
109. Tamil Nadu  Axis Bank Renewable
3rd Party Energy Sales
Energy
Model and Under Captive
Use Scheme through Intra
State Open Access System
Sri Matha Spinning Mills
Pvt. Ltd and Sri Sankari
Dindigul, Energy /
Yarns Private Limited –
110. Tamil Nadu  Axis Bank Renewable
LIE for 2*3 MW (AC) Solar
Energy
PV Power plant under
implementation
VM7 Expressway Private
Limited – LIE on
Greenfield Eight laning of
Vadodara Mumbai
Expressway (Gandeva to
Gujarat  Union Bank of Road /
111. Ena Section) from Km
India Infrastructure
190.00 to Km 217.50 in
the State of Gujarat
(Length 27.50 Kms) under
Bharat Mala Pariyojana
on Hybrid Annuity Basis
Hild Energy Private
Limited – LIE on
Energy /
development of 50 MW
112. Odisha  Axis Bank Renewable
Solar Power projects of
Energy
Mahanadi Coal Fields
Limited
SPR Construction Pvt Ltd
– LIE for construction of
“Market of India-
Chennai, Real Estate &
113. Wholesale Market” – a  Indian Bank
Tamil Nadu Housing
project within the
integrated Smart City
Township “SPR City”
Aanjaney Rail Pvt. Ltd –
LIE on implementation of Burdwan,  Punjab
114. Metallurgical
Railway parts West Bengal National Bank
manufacturing unit
S. No Client / Project Location / State Bank Sector
Baidyanath Bio Fuels
Pvt. Ltd – LIE for
Nagpur,  Bank of Sugar &
115. development of 250 KLPD
Maharashtra Maharashtra Distillery
Grain based Distillery /
Ethanol plant
Azure Power Forty Pvt.
Energy /
Ltd – LIE for monitoring of
116. Assam  IREDA Renewable
15 MW / 25 MW capacity
Energy
Solar PV Projects
Rajapalayam Mills Ltd –
LIE for modernization of
existing Spinning Division
by installation of 166
117. additional looms &  Axis Bank Textile
installation of fabric
dyeing/finishing
infrastructure for 50,000
m/day
SJVN Limited – LIE on 210 Energy /
 State Bank of
118. MW Luhri-Hydro Power Himachal Pradesh Renewable
India
Project Energy
Safeway Concessions –
LIE for TOT 1 (9 bundle
SPVs) consist of nine Andhra Pradesh,  State Bank of Infrastructure –
119.
stretched of road projects Gujarat India Road
across two states with a
total length of 680.64 km.
DP Jain TOT Roads Pvt.
Ltd- LIE on Palanpur-
Radhanpur-Samkhiyali  Bank of Infrastructure –
120. Gujarat
Road project of NH-27 on Maharashtra Road
Tolling-Operate-Transfer
(TOT) basis
Raj Kesari Rocks Private
Limited - LIE on
manufacture of Udaipur,  State Bank of
121. Metallurgical
Engineered Stone i.e. Rajasthan India
Artificial Marble / Quartz
stone slabs project
Radiance Ka Sunshine - Energy /
Raichur,
122. LIE for monitoring of  IREDA Renewable
Karnataka
49.75 MW Capacity Solar Energy
S. No Client / Project Location / State Bank Sector
power project

Amrapali Stalled Projects


Investment and
Reconstruction
Establishment (ASPIRE) – Noida &
Real Estate &
123. LIE for 18 stalled / Greater Noida  Bank of Baroda
Housing
incomplete housing Uttar Pradesh
projects of Amrapali
Group involving around
45,000 housing units
Sudha Somany Ceramics
Private Limited – Chittoor, Building
124.  Axis Bank
LIE for expansion of Andhra Pradesh Material
Vitrified Tiles plant
Sidhant Beverages - LIE
for setting up of Bottling
Plant for manufacture of
IMFL (Indian Made Foreign Hooghly,  Punjab Sugar &
125.
Liquor) and BII (Scotch) West Bengal National Bank Distillery
with an installation
capacity of 2.00 lakhs
cases per month
Steam House India Ltd -
LIE for Steam  Axis Finance
126. Gujarat
manufacturing and Ltd
distribution projects