UPS PROTECTION Sdn. Bhd. ( Co. No.

: 540889-K )
Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 1 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

A. GENERAL DATA
Make : SIEMENS Aux. Voltage : 110 VDC
Type : 7UM62 Rated Current : 1/5A
CT Ratio : 1500/1A Serial No. : 1412510669

B. FINAL SETTING
1. Thermal Overload Protection.
Parameters Setting
Threshold 1.00 A
K-factor 1.05
Time constant 600 Sec
Alarm 90 %
Trip 100 %

1. Voltage restraint Over Current Protection.


Parameters Setting
I> 1.25 A
TMS 1
Curve NI
Voltage Restraint 75 V

3. Restricted Earth Fault Protection.


Parameters Setting
Vs 12 A
T(s) 0.5 sec

4. Negative Phase Sequence Protection.


Parameters Setting
I2> 0.095 A
K-factor 30 sec
I2>> 0.95 A
tI2>>> 10 sec

5. Reverse Power Protection.


Parameters Setting
Rated MVA 42.855
Reverse Power 1.5 %
Time Delay 10 sec

Results: PASS / FAIL


Tester SMDS Witness Main Contractor Certification

Name
Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 2 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---
B. FINAL SETTING
6. Over frequency Protection.
Parameters Setting
>f1 1.00 Hz
Time delay 1.05 sec
>f2 600 Hz
Time delay 90 sec
7. Over voltage Protection
Parameters Setting
Over voltage 145 V
Time Delay 2 sec
8. Under excitation Protection (Loss of field protection).
Parameters Setting
I/xd 0.5
Angle a1 90 deg
Time delay 0.50 sec
9. Over excitation Protection (Volt/Hertz)
Parameters Setting
V/f> 1.15
Time delay 20 sec
V/f> 1.4
Time delay 1.0 sec
10. Current differential Protection.
Parameters Setting
Idiff> 0.35
Idiff>> 8.80
11. Circuit Breaker Failure Protection
Parameters Setting
Time delay 0.150 sec
10. Load Shedding Protection.
Parameters Setting
Stage 1 49 Hz
Time delay 0.70 sec
Stage 2 48.70 Hz
Time Delay 0.50 sec
Df/dt 1 Hz/ 1 sec
Time Delay 0 sec

Results: PASS / FAIL


Tester SMDS Witness Main Contractor Certification
Name

Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 3 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

C. TEST RESULTS:

1. Thermal Overload Protection

1.1 Three Phase Injection


Thermal Image for Hot Condition = 50%

Injected Current Threshold Setting Operating Tripping Time, sec Tripping Time, sec
A % Iθ>(A) Temperature (Actual ) ( Design )
1.20 120 1.00 Cold 870.50
3.00 300 1.00 Cold 78.40
3.00 300 1.00 Hot 105.40
2.00 200 1.00 Hot 39.20

2. Voltage Restraint Overcurrent Protection

2.1 Pick-up Check


Setting, Operating value, A
A Red Yellow Blue
1.25

2.2 Operating Time Check


Injected Operating Time, sec Expected Time Injected
Current, Red Yellow Blue (Sec) Restraint Voltage
A (V)
1.625 26.61
2.500 10.00 110
5.000 5.00
1.625 7.26
2.500 4.98 55
5.000 3.36

3 Stator Earth Fault Protection

3.1 Pickup Test


Setting, Vs (V) Pickup Value (V)
12.0

3.2 Operating Time Test


Setting Setting Operating time
Vs (V) V % (s)
12.0 15.6 130
12.0 24.0 200

Results: PASS / FAIL


Tester SMDS Witness Main Contractor Certification

Name

Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 4 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

C. TEST RESULTS:

4 Negative Phase Sequence Protection


-using three phase injection method
4.1 Pick-up Check
Setting (A) Operating Current (A)
I2> 0.095
I2>> 0.950

4.2 Operating Time Check


Operation Injected Current Setting Operating Time Expected Time
A % (A) (sec) (sec)
I2> 0.285 300 0.095 369.34
I2> 0.380 400 0.095 207.75
I2>> 1.900 200 0.950 10.00

5 Reverse Power Protection


5.1 Operational Test
Phase Setting Secondary Injection Calculated Actual
Watt Time delay, Volt (V) Pickup Amp Expected Watt Operating
Operation
sec (A) Amp (A) Time
(sec)
RYB 42.855 10.0 Trip 110 0.015 0.015

5.2 Boundary Angles Test


Phase Setting, Secondary Injection Lead Angle Lag Angle
Watt Volt (V) Amp (A) (Degree) (Degree)
RYB 42,855 110 0.075

6 Over Frequency Protection

6.1 Pick-up Check


Over Frequency Function
Function Setting (Hz) Pick-up (Hz) Drop-Off (Hz)
>f stage 1 59.5
>f stage 2 52.0

6.2 Pick-up Check


Over Frequency Function
Setting Injected Operating time Expected time
Frequency (sec) (sec)
(Hz)
59.50 59.60 10.00
52.00 52.10 20.00

Results: PASS / FAIL


Tester SMDS Witness Main Contractor Certification

Name

Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 5 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

C. TEST RESULTS:

7 Over-voltage Protection
7.1 Pick-up Check/Drop-Off Test
Over-voltage Function
Setting Pick-up (V) Drop-off (V)
145

7.2 Pick-up Check/Drop-Off Test


Over-voltage Function
Setting Injected Operating time Expected time
Voltage (V) (sec) (sec)
145 146.0 2.00
150.0 2.00

8 Under-excitation Protection (Loss of Field protection)


8.1 Pick-up Check
Phase Injected Voltage(V) Operating Value (A)
RYB 110

8.2 Angle Check


Phase Injected Voltage Injected Current Operating Angle
(V) (A) (⁰)
RYB 110 1.0 30 - 150

8.3 Operating Time Test


Phase Injected Voltage Injected Current Operating time (sec)
(V) (A) Actual Value Design Value
RYB 110 1.0 0.50

9 Over-excitation Protection (Volt/Hertz)


9.1 Pick-up Check
Setting Pick-up Value (Hz)
V/Hz>1 1.15
V/Hz>2 1.40

9.2 Operating Check


Setting Operation Operating Time (sec)
V/Hz>1 43.00 Trip
V/Hz>2 35.00 Trip
Results: PASS / FAIL
Tester SMDS Witness Main Contractor Certification

Name

Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 6 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

C. TEST RESULTS:

10 Current Differential Protection


10.1 Pick-up Check
Phase Setting, A Operating Value, A
Line Side Neutral Side
RYB Idiff> 0.35
RYB Idiff>> 8.80

10.2 Operating Time Check


Phase Setting, A Inject (A) Operating Value, sec
Line Side Neutral Side
RYB Idiff> 0.35 0.70
RYB Idiff> 0.35 1.05
RYB Idiff>> 8.80 11.44

10.3 Biased Check


Injected Current Phase
(A) RED Yellow Blue
Idiff Ibias Idiff Ibias Idiff Ibias
1.5 X 0.35
2.0 X 0.35
2.5 X 0.35
3.0 X 0.35
4.0 X 0.35

11 Circuit Breaker Failure


11.1 Operating Time Check
Time Setting (Sec) Actual Time (Sec)
0.150

12 Load Shedding Protection


12.1 Operation Check
Function Pick-up Value (Hz) Operating time (sec)
Stage 1 49.000
Stage 2 48.696

12.2 Operation Check


Function Pick-up Value (Hz) Operating time (sec)
df/dt 1 Hz / 1 sec
Results: PASS / FAIL
Tester SMDS Witness Main Contractor Certification

Name

Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 7 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

C. TEST RESULTS:

12 Load Shedding Protection


12.3 Operation Functional Check
LS Stage 1 LS Stage 1
F1 (L2) Breaker F2 (R2) Breaker Generator Breaker
Condition Tripping Expected Tripping
Condition Condition Condition
Condition Condition
Open Open Close Yes Yes
Open Open Open No No
Open Close Open No No
Open Close Close No No
<49.0 Hz
Close Open Close No No
Close Open Open No No
Close Close Open No No
Close Close Close No No
Open Open Close No No
Open Open Open No No
Open Close Open No No
Open Close Close No No
>49.0 Hz
Close Open Close No No
Close Open Open No No
Close Close Open No No
Close Close Close No No
LS Stage 2 LS Stage 2
F1 (L2) Breaker F2 (R2) Breaker Generator Breaker
Condition Tripping Expected Tripping
Condition Condition Condition
Condition Condition
Open Open Close Yes Yes
Open Open Open No No
Open Close Open No No
Open Close Close No No
<48.7 Hz
Close Open Close No No
Close Open Open No No
Close Close Open No No
Close Close Close No No
>48.7 Hz Open Open Close No No
Open Open Open No No
Open Close Open No No
Open Close Close No No
Close Open Close No No
Close Open Open No No
Close Close Open No No
Close Close Close No No

Results: PASS / FAIL


Tester SMDS Witness Main Contractor Certification

Name

Date

UPS PROTECTION Sdn. Bhd. ( Co. No. : 540889-K )


Ground & 1st Floor, Lot 3263, TT3 Commercial Centre, Jalan Canna, 93350 Kuching Sarawak.
Sheet: 8 of 8
Description
GENERATOR PROTECTON RELAY

Site : SMDS Client : SHELL MDS (M) SDN. BHD.


TC Ref : CONSOLIDATED ENGINEERING
--- Main Contractor :
SERVICES
Location : MAIN SUBSTATION Panel : PROTECTION RELAY PANEL
Circuit : GENERATOR G-7601 Equipment No : ---

C. TEST RESULTS:

12 Load Shedding Protection


12.4 Operation Functional Check

LS Stage 1 LS Stage 1
F1 (L2) Breaker F2 (R2) Breaker Generator Breaker
Condition Tripping Expected Tripping
Condition Condition Condition
Condition Condition
Open Open Close Yes Yes
Open Open Open No No
Open Close Open No No
Open Close Close No No
> 1Hz/1sec
Close Open Close No No
Close Open Open No No
Close Close Open No No
Close Close Close No No
Open Open Close No No
Open Open Open No No
Open Close Open No No
Open Close Close No No
< 1Hz/1sec
Close Open Close No No
Close Open Open No No
Close Close Open No No
Close Close Close No No

1. Relay LED checked.


2. Lockout relay operated when tripped.
3. Local CB tripped when relay operated.
4. CB L1 and R1 tripped when CBF operated.
Remarks:

Results: PASS / FAIL


Tester SMDS Witness Main Contractor Certification

Name

Date