The document outlines 31 observation points from an ISO audit conducted at a Power of One site between June 22nd and 24th. The majority of the observations relate to issues with documentation, procedures, training, and safety practices within the MEP (Mechanical, Electrical, Plumbing) department. Key areas for improvement include competency checking for welders, developing standard operating procedures and work instructions, addressing risks and opportunities, and revising manuals. Other observations note issues with quality control, hazardous materials handling, and a lack of training evaluations across various departments.
The document outlines 31 observation points from an ISO audit conducted at a Power of One site between June 22nd and 24th. The majority of the observations relate to issues with documentation, procedures, training, and safety practices within the MEP (Mechanical, Electrical, Plumbing) department. Key areas for improvement include competency checking for welders, developing standard operating procedures and work instructions, addressing risks and opportunities, and revising manuals. Other observations note issues with quality control, hazardous materials handling, and a lack of training evaluations across various departments.
The document outlines 31 observation points from an ISO audit conducted at a Power of One site between June 22nd and 24th. The majority of the observations relate to issues with documentation, procedures, training, and safety practices within the MEP (Mechanical, Electrical, Plumbing) department. Key areas for improvement include competency checking for welders, developing standard operating procedures and work instructions, addressing risks and opportunities, and revising manuals. Other observations note issues with quality control, hazardous materials handling, and a lack of training evaluations across various departments.
OBSERAVTION POINTS DURING ISO AUDIT AT POWER OF ONE SITE AND H O
(22 JUNE TO 24 JUNE
21) SR OBSERAVTION POINTS (AREA OF IMPROVEMENTS) ACTION TO BE TAKEN BY NO 01 WELDER COMPETENCY NOT CHECKED (SKILL, CERTIFICATE, MEP EXPERIENCE) etc. 02 NO FORMAL FLOW CHART FOR MEP (SOP & WMS FOR ACTIVITIES) MEP 03 RISKS AND OPPORTUNITIES FOR EVERY ACTIVITY OF MEP. MEP 04 INTERACTION BETWEEN PROCESSES FOR MEP. MEP 05 HIRA FOR MEP. MEP/SAFETY 06 MANUAL TO BE REVISED FOR MEP. MEP 07 MEP DOCUMENTS (COMMISSIONING PROCEDURES AND CHECK MEP SHEET, WORK INSTRUCTIONS). 08 WELDING INSPECTION PLAN AND WELDER TRAINING. MEP 09 TENDER REVIEW, FEASIBILITY, ENQUIRY TO MAINTAIN. KEY POINTS. MEP 10 CHECK SHEET NOT AUTHORISED BY RESPONSIBLE PERSON MEP 11 PAINTING QUALITY WAS VERY BAD, PAINT CONTAINER WERE FOUND MEP OPEN. 12 NO STOPPERS WERE PROVIDED FOR PIPES. MEP 13 PAINTING PROCEDURES TO BE DEFINED (NO OF COATS, THICKNESS MEP ETC). 14 WELDING TRAINING BY DISPLAYING DEFECTIVE PIECES. MEP 15 FIRE WATER TANK- FIBER TAPE NOT APPLIED PROPERLY.REASON FOR MEP TAPE APPLICATION NOT DEFINED. 16 LOT OF WASTAGE NUT BOLT, NAILS, RODS ETC. MEP 17 SITE DPR NOT MAINTAINED (PLANQTY, ACHIEVED QTY AND BAL QTY MEP IS NOT MATCHING). 18 DRG REGISTER MAINTAINED BUT MISSING REVISION REMARKS NOT MEP MENTIONED AND IMPACT ON COST, MATERIAL, LABOUR. 19 DRG QUEARIES LOG SHEET TO MAINTAIN. MEP 20 WORK PERMIT CONTRACTOR WISE REQUIRED. MEP 21 NO REPONSIBLE PERSON PRASENTFOR FABRICATION WORK ON SITE. MEP 22 D P TEST TRAINING AND PHOTOS TO BE DISPLAYED. MEP 23 ENTRIES IN PERMITS AND CHECK SHEET WAS DONE BY TICK MARK SAFETY ONLY. TRAINING TO BE GIVEN. 24 PP ISSUE REGISTER REQUIRED IN EXCELL SHEET. SAFETY 25 MAINT CHECK SHEET ARE NOT AVAILABLE. MAINT 26 GEN SET NOISE TO BE MEASURED. MAINT 27 SITE RELATED HIRA AND RISKS, HAZARDS MUST BE KNOWN TO SITE STORES, EXECUTION, PEOPLE. SAFETY 28 AWARENESS REGARDING PLANT HAZARDS NOT KNOWN TO STORES STORES, SAFETY PERSON. AWARENESS TO BE GIVEN REGARDING MSDS. 29 TRAINING EVALUATION AND EFFECTIVENESS IS REQUIRED. ALL DEPARTMENTS 30 ANNUAL PERFORMANS APPRISAL TO BE DONE. HR 31 MEDICAL EXAMINATION OF STAFF IS SUGGESTED. HR