Professional Documents
Culture Documents
Date
Name of Project: Supplier of Labor & Materials for Sound Sytem including installation at Barangay Cogon, City of Naga, Cebu
Source of Fund:
Amount: 388,500.00
PRICE SCHEDULE
Unit of
Item No. Qty Measure Item Description Unit Cost Total Cost
1 1 lot wall mounted (6 sets) speaker with amplifier and mixer with 388,500.00 388,500.00
fabricated hanging bracket for speaker
-
Total Material Cost 388,500.00
ELMER P. PARAN
Barangay Captain
Brgy. Cogon, City of Naga, Cebu
PROJECT PROPOSAL
Date
Name of Project: Supplier of Labor & Materials for Sound Sytem including installation at Barangay Cogon, City of Naga, Cebu
Source of Fund:
Amount: 388,500.00
PRICE SCHEDULE
Unit of
Item No. Qty Measure Item Description Unit Cost Total Cost
1 unit-Yamaha PX-8 -
1 unit-Yamaha MG 12 XU -
6 units-BOS DM 5 SE -
1 roll- Marshall #14
1 set - Kevler UMC-500
Total Material Cost 388,500.00
ELMER P. PARAN
Barangay Captain
Brgy. Cogon, City of Naga, Cebu
TECHNICAL SPECIFICATIONS
I hereby commit to comply and deliver all the above requirements in accordance with the above stated schedule
DELIVERY SCHEDULE
4 6 8 11
Grinding Disc #4 Lerox bar SS Welding Rod
50mmØx1.5mm SUS-304 Stainless hex cap #1.6mm
1 c.d 1 c.d
Stainless Steel Pipe 4 c.d. Chemical Gun
1 C.D
7 c.d. 1 c.d.
1 2 3 5 7 10 13
Cutting Disc #4 Chemical Anchor
32mmØx1.5mm SUS-304 Stainless Steel Plate, 10mm thk Stainless steel rod 12mmx3.60m Sanding Disc #80
Stainless Steel Pipe 3 c.d. 2 c.d.
5 c.d. 4 c.d. 3 c.d.
13 c.d.
5 c.d. Buffing Wheel
Sanding Disc
1.5 c.d.
#320
1.5 c.d.
9 12
6mmx2" stainless steel flat Scotch Brite round
bar 1.5 c.d.
7 c.d.
Prepared By :
DELIVERY TEAM
DURATION
1st Week 2nd Week 3rd Week 4th Week 5th Week
Manpower
7 7 7 7 2
1 - 7 8 - 14 15 - 21 22 - 28 30
Delivery Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Truckboy 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Total 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Submitted by: