PROJECT PROPOSAL

Date
Name of Project: Supplier of Labor & Materials for Sound Sytem including installation at Barangay Cogon, City of Naga, Cebu
Source of Fund:
Amount: 388,500.00

PRICE SCHEDULE
Unit of
Item No. Qty Measure Item Description Unit Cost Total Cost

1 1 lot wall mounted (6 sets) speaker with amplifier and mixer with 388,500.00 388,500.00
fabricated hanging bracket for speaker
-
Total Material Cost 388,500.00

EDUARDO C. SISMAR DAISY MAE D. LIBRE


Chairman of Appropriation Barangay Secretary

ELMER P. PARAN
Barangay Captain
Brgy. Cogon, City of Naga, Cebu
PROJECT PROPOSAL
Date
Name of Project: Supplier of Labor & Materials for Sound Sytem including installation at Barangay Cogon, City of Naga, Cebu
Source of Fund:
Amount: 388,500.00

PRICE SCHEDULE
Unit of
Item No. Qty Measure Item Description Unit Cost Total Cost

wall mounted speaker with amplifier and mixer with fabricated


1 1 lot hanging bracket for speaker 388,500.00 388,500.00

1 unit-Yamaha PX-8 -
1 unit-Yamaha MG 12 XU -
6 units-BOS DM 5 SE -
1 roll- Marshall #14
1 set - Kevler UMC-500
Total Material Cost 388,500.00

EDUARDO C. SISMAR DAISY MAE D. LIBRE


Chairman of Appropriation Barangay Secretary

ELMER P. PARAN
Barangay Captain
Brgy. Cogon, City of Naga, Cebu
TECHNICAL SPECIFICATIONS

Item No. Unit of Item Description Brand State of Compliance (Comply/Not


Qty Measure Comply)
1 54 lengths 50mmØx1.5mm SUS-304 Stainless Steel Pipe Generic
2 283 lengths 32mmØx1.5mm SUS-304 Stainless Steel Pipe Generic
3 90 lengths 6mmx2" stainless steel flat bar Generic
4 210 pcs cutting disc #4 tyrolit
5 70 pcs grinding disc #4 Nicazza
6 290 pcs sanding disc #80 Generic
7 290 pcs sanding disc #320 Generic
8 256 pcs scotch brite round Generic
9 230 pcs buffing wheel #4 Generic
Comply
10 45 kgs SS Welding rod 1.6mm Nihon
11 30 pcs Lerox bar Generic
12 2 sht Stainless Steel Plate, 10mm thk Generic
13 53 lengths Stainless steel rod 12mmx3.60m Generic
14 944 pcs stainless hex cap Generic
15 35 tubes chemical anchor Fischer
16 1 pcs chemical gun Fischer

I hereby commit to comply and deliver all the above requirements in accordance with the above stated schedule

A.T. MACROHON CONST. CO. ALBERT T. MACROHON December 30, 1899


Name of Company/Bidder Proprietor Date
Project Supply of Materials for Stainless Steel Railings
Location: Brgy. East Poblacion, City of Naga, Cebu

DELIVERY SCHEDULE

4 6 8 11
Grinding Disc #4 Lerox bar SS Welding Rod
50mmØx1.5mm SUS-304 Stainless hex cap #1.6mm
1 c.d 1 c.d
Stainless Steel Pipe 4 c.d. Chemical Gun
1 C.D
7 c.d. 1 c.d.

1 2 3 5 7 10 13
Cutting Disc #4 Chemical Anchor
32mmØx1.5mm SUS-304 Stainless Steel Plate, 10mm thk Stainless steel rod 12mmx3.60m Sanding Disc #80
Stainless Steel Pipe 3 c.d. 2 c.d.
5 c.d. 4 c.d. 3 c.d.
13 c.d.
5 c.d. Buffing Wheel
Sanding Disc
1.5 c.d.
#320
1.5 c.d.
9 12
6mmx2" stainless steel flat Scotch Brite round
bar 1.5 c.d.
7 c.d.

Total Deliveryt Duration : 30 c.d.


CPM

Prepared By :

CATHERINE FAITH E. SAYAGO


Project Engineer
A.T. Macrohon Construction Company
Project Supply of Materials for Stainless Steel Railings
Location Brgy. East Poblacion, City of Naga, Cebu

DELIVERY TEAM

DURATION

1st Week 2nd Week 3rd Week 4th Week 5th Week
Manpower
7 7 7 7 2

1 - 7 8 - 14 15 - 21 22 - 28 30

Delivery Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Truckboy 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Total 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

Submitted by:

CATHERINE FAITH E. SAYAGO


Project Engineer

A.T. Macrohon Construction Company