Name of Vessel MV.YUE DIAN 59 Date

Flag CHINA Port of Loading BUNATI ANCHORAGE, SOUTH KALIMANTAN, INDONESIA

DWT / GRT 56,688 MT / 32,969 MT Last Port THAILAND

Name of Master CAPT. DAI YONGHAO Next Port

No Activitas Time Date BROB Arrival Departure


1 Arrived 09.18 HRS MARCH 26, 2022 FO 1,1890 MT MT

2 Pilot On Board 09.18 HRS MARCH 26, 2022 DO 48 MT MT

3 Anchorage at Loading Point 09.54 HRS MARCH 26, 2022 FW 285 MT MT

4 Free Pratique Granted 11.30 HRS MARCH 26, 2022 BW 13,730 MT MT

5 Agent & Port Authority on Board 10.30 HRS MARCH 26, 2022

6 NOR Tendered 09.54 HRS MARCH 26, 2022

7 NOR Re-Tendered - - DRAFT Arrival Departure


8 Pilot Off 10.06 HRS MARCH 26, 2022 FWD 4,85 M M

9 NOR Accepted AS PER CHARTER PARTY MID 5,57 M M

10 Commenced Loading 21.45 HRS MARCH 26, 2022 AFT 6,82 M M

11 Completed Loading HRS

12 Completed Shipping Documents HRS

13 Departure / Sailed HRS


14 ETA Next Port

15 Initial Draft Survey 07.00 - 08.00 HRS MARCH 26, 2022

16 Holds Cleanliness Inspection 07.00 - 08.00 HRS MARCH 26, 2022

17 Final Draft Survey HRS MARCH 24, 2022


18 Total Cargo Loaded 56,050 MT
We hereby certify that the above statement of fact are true and correct :
Remarks :

PT. JHONLIN GROUP GABRIEL CAPT. DAI YONGHAO


Shipper as Agent Master of MV YUE DIAN 59
Time Sheet / Statement Of Fact
Working Records
MV HI 02 Page : 1 ( One )

Date / Day Weather Hatch No Working Time Remarks


MARCH 26,2022 Cloudy 09.18 hrs Vessel arrived at bunati pilot station, South Kalimantan, Indonesia
Saturday 09.18 hrs Pilot on board
09.18 - 09.54 hrs Vessel approaching to loading Area
09.54 hrs Vessel dropped anchor at loading area
09.54 hrs NOR Tendered
10.06 hrs Pilot off
10.30 hrs Port authority & Agent on board
10.30 – 11.30 hrs Health quarantine inspection
11.30 hrs Free pratique granted
11.30 - 21.45 hrs Turn time 12 hours
12.45 - 13.45 hrs Initial draft survey by C/officer & Surveyor
15.00 hrs Stevedores on board
18.15 hrs LCT JHONI 50 bring loading equipment a/side at ship S/side
18.15 - 19.00 hrs Moved bulldozer to ship deck, Install fender & Mooring line at ship side
19.00 hrs LCT JHONI 50 cast off
21.00 - 21.35 hrs Maneuvering barge to a/side
21.35 hrs 1st BG. SAMTIMAS 05 / TB. LILY 105 a/side at ship S/Side
21.35 - 21.45 hrs Prepared for loading
21.45 hrs COMMENCED LOADING H1C1,H2C2,H4C3,H5C4 (BG. SAMTIMAS 05)
21.45 - 24.00 hrs Continued loading H1C1,H2C2,H4C3,H5C4 (BG. LIANA XXXX)

MARCH 27,2022 Cloudy 00.00 - 07.15 hrs Continued loading H1C1,H2C2,H4C3,H5C4 (BG. SAMTIMAS 05)
Sunday 07.15 hrs Stopped loading all hatch & Completed discharge BG. SAMTIMAS 05
07.15 - 07.30 hrs Transferred bulldozer from barge to ship on deck by C3
07.30 hrs BG. SAMTIMAS 05 / TB. LILY 105 cast off
07.30 - 18.00 hrs Waiting for the next Cargo barge
18.00 - 18.50 hrs Maneuvering barge to a/side
18.50 hrs 2nd BG. LIANA VIII / TB. JHONI XLII a/side at s/side ship
18.50 - 19.05 hrs Transferred bulldozer from ship's deck to barge by C3
19.05 hrs Resumed loading H1C1,H2C2,H3C3,H4C4(BG. LIANA LIV)
19.05 - 24.00 hrs Continued loading H1C1,H2C2,H3C3,H4C4(BG. LIANA LIV)

MARCH 28,2022 Cloudy 00.00 - 02.10 hrs Continued loading H1C1,H2C2,H3C3,H4C4(BG. LIANA LIV)
Monday 02.10 hrs Stopped loading all hatch & Completed discharge BG. LIANA VIII
02.10 - 02.25 hrs Transferred bulldozer from barge to ship on deck by C3
02.25 hrs BG. LIANA VIII / TB. JHONI XLII cast off
02.25 - 03.25 hrs Maneuvering barge to a/side
03.25 hrs 3rd BG. LIANA XXXXIX / TB. BARA III a/side at s/side ship
03.25 hrs Resumed loading H1C1,H2C2,H4C4(BG. LIANA XXXXIX)
03.25 - 03.40 hrs Transferred bulldozer from ship's deck to barge by C3
03.40 hrs Resumed loading H3C3(BG. LIANA XXXXIX)
06.45 hrs Stopped loading all hatch & Completed discharge BG. LIANA XXXXIX
06.45 - 07.00 hrs Transferred bulldozer from barge to ship on deck by C3
07.00 hrs BG. LIANA XXXXIX / TB. BARA III cast off
07.00 - 07.45 hrs Maneuvering barge to a/side
07.45 hrs 4th BG. SAMTIMAS 02 / TB. JHONI 102 a/side at ship S/side
07.45 hrs Resumed loading H1C1,H3C2,H5C4 (BG. SAMTIMAS 02)
07.45 - 08.00 hrs Transferred bulldozer from ship's deck to barge by C3
We hereby certify that the above time records are true and correct : Continued to Page No. 2

PT.JHONLIN GROUP GABRIEL CAPT.DAI YONGHAO


Shipper as Agent MASTER OF MV YUE DIAN 59
Time Sheet / Statement Of Fact
Working Records
Page : 2 ( Two )

Date / Day Weather Hatch No Working Time Remarks


08.00 hrs Resumed loading H4C3 (BG. SAMTIMAS 02)
16.00 hrs Stopped loading all hatch & Completed discharge BG. SAMTIMAS 02
16.00 - 16.15 hrs Transferred bulldozer from barge to ship on deck by C3
16.15 hrs BG. SAMTIMAS 02 / TB. JHONI 102 cast off
16.15 - 17.00 hrs Maneuvering barge to a/side
17.00 hrs 5th BG. LIANA LV / TB. BARA IV a/side at s/side ship
17.00 hrs Resumed loading H2C1,H3C2,H5C4(BG. LIANA LV)
17.00 - 17.15 hrs Transferred bulldozer from ship's deck to barge by C3
17.15 hrs Resumed loading H4C3(BG. LIANA LV)
23.45 hrs Stopped loading all hatch & Completed discharge BG. LIANA LV
23.45 - 24.00 hrs Transferred bulldozer from barge to ship on deck by C3
24.00 hrs BG. LIANA LV / TB. BARA IV cast off

MARCH 29,2022 Cloudy hrs


Tuesday hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
We hereby certify that the above time records are true and correct : Continued to Page No. 3

PT. JHONLIN GROUP GABRIEL CAPT.DAI YONGHAO


Shipper as Agent MASTER OF MV YUE DIAN 59
Time Sheet / Statement Of Fact
Working Records
Page : 3 ( Three )

Date / Day Weather Hatch No Working Time Remarks


hrs
hrs

We hereby certify that the above time records are true and correct : Last Page

PT. JHONLIN GROUP GABRIEL CAPT.DAI YONGHAO


Shipper as Agent MASTER OF MV YUE DIAN 59
Time Sheet / Statement Of Fact
Working Records
Page : 4 ( Four )

Date / Day Weather Hatch No Working Time Remarks


1 02.30 - 02.45 hrs Stopped loading H1 / Transferred bulldozer from FC to barge
1 02.45 hrs Resumed loading H1 ( BG. GRACE ) BY FC ARK SHALOM
Rain 1 03.30 - 05.30 hrs Stopped loading H1 due to heavy rain
Cloudy 1 05.30 hrs Resumed loading H1 ( BG. GRACE ) BY FC ARK SHALOM
1 07.50 - 08.00 hrs Stopped loading H1 / FC ARK SHALOM Shifted from H1 to H2
2 08.00 hrs Started loading H2 ( BG. GRACE ) BY FC ARK SHALOM
2 14.45 hrs Stopped loading H2 / Completed discharge on BG. GRACE
14.45 - 15.00 hrs Transferred bulldozer from barge to FC ARK SHALOM
15.00 hrs BG. GRACE / TB. EMILY Cast off
15.00 - 16.25 hrs Manuevering barge to a/side
16.25 hrs 11th BG. PSB 3302 / TB. PSB 02 a/side at FC ARK SHALOM
9 16.25 hrs Started loading H9 ( BG. PSB 3302 ) BY FC ARK SHALOM
Rain 9 21.30 - 23.15 hrs Stopped loading H9 due to heavy rain
Cloudy 9 23.15 hrs Resumed loading H9 ( BG. PSB 3302 ) BY FC ARK SHALOM
9 23.15 - 24.00 hrs Continued loading H9 ( BG. PSB 3302 ) BY FC ARK SHALOM

SEPT 06, 2021 Cloudy 9 00.00 - 01.00 hrs Continued loading H9 ( BG. PSB 3302 ) BY FC ARK SHALOM
Monday 9 01.00 hrs Stopped loading H9 / Completed discharge on BG. PSB 3302
01.00 - 01.15 hrs Transferred bulldozer from barge to FC ARK SHALOM
01.15 hrs BG. PSB 3302 / TB. PSB 02 Cast off
01.15 - 02.15 hrs Manuevering barge to a/side
02.15 hrs 12th BG. MARINE POWER 3012 / TB. MARINA 12 a/side at FC ARK SHALOM
9 02.15 hrs Resumed loading H9 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
Rain 9 03.00 - 10.00 hrs Stopped loading H9 due to heavy rain
Cloudy 9 10.00 hrs Resumed loading H9 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
9 10.30 - 10.45 hrs Stopped loading H9 / Transferred bulldozer from FC to barge
9 10.45 hrs Resumed loading H9 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
9 12.50 - 13.00 hrs Stopped loading H9 / FC ARK SHALOM Shifted from H9 to H8
8 13.00 hrs Started loading H8 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
8 15.20 - 15.30 hrs Stopped loading H8 / FC ARK SHALOM Shifted from H8 to H9
9 15.30 hrs Resumed loading H9 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
9 15.45 hrs Stopped laoding H9 / Completed discharge on BG. MARINE POWER 3012
15.45 - 16.10 hrs Manuevering FC ARK SHILO to a/side at FC ARK SHALOM
16.10 - 16.20 hrs Transferred bulldozer from FC ARK SHILO to FC ARK SHALOM
16.20 - 16.35 hrs Transferred bulldozer from barge to FC ARK SHALOM
16.35 - 17.20 hrs Unable barge to cast off due to Maintenance partition door barge
17.20 hrs BG. MARINE POWER 3012 / TB. MARINA 12 Cast off
17.20 - 18.10 hrs Manuevering barge to a/side
18.10 hrs 13th BG. BULESKO I / TB. K VI a/side at FC ARK SHALOM
9 18.10 hrs Resumed loading H9 ( BG. BULESKO I ) BY FC ARK SHALOM
9 19.20 - 19.30 hrs Stopped loading H9 / Transferred bulldozer from FC to barge
8 19.30 hrs Resumed loading H8 ( BG. BULESKO I ) BY FC ARK SHALOM
8 20.25 - 20.40 hrs Stopped loading H8 / FC ARK SHALOM Shifted from H8 to H4
4 20.40 hrs Resumed loading H4 ( BG. BULESKO I ) BY FC ARK SHALOM
Rain 22.10 - 23.30 hrs Stopped loading due to heavy rain
Cloudy 4 23.30 hrs Resumed loading H4 ( BG. BULESKO I ) BY FC ARK SHALOM
4 23.30 - 24.00 hrs Continued loading H4 ( BG. BULESKO I ) BY FC ARK SHALOM

We hereby certify that the above time records are true and correct : Continued to Page No. 5
Time Sheet / Statement Of Fact
Working Records
Page : 5 ( Five )

Date / Day Weather Hatch No Working Time Remarks


SEPT 07, 2021 Cloudy 4 00.00 - 01.45 hrs Continued loading H4 ( BG. BULESKO I ) BY FC ARK SHALOM
Tuesday 4 01.45 hrs Stopped loading H4 / Completed discharge on BG. BULESKO I
01.45 - 02.00 hrs Transferred bulldozer from barge to FC ARK SHALOM
02.00 hrs BG. BULESKO I / TB. K VI Cast off
02.30 - 03.30 hrs Manuevering barge to a/side
03.30 hrs 14th BG. PSB 3303 / TB. PSB 03 a/side at FC ARK SHALOM
4 03.30 hrs Resumed loading H4 ( BG. PSB 3303 ) BY FC ARK SHALOM
Rain 4 04.00 - 06.00 hrs Stopped loading H4 due to heavy rain
Cloudy 4 06.00 hrs Resumed loading H4 ( BG. PSB 3303 ) BY FC ARK SHALOM
4 06.45 - 06.55 hrs Stopped loading H4 / Transferred bulldozer from FC to barge
4 06.55 hrs Resumed loading H4 ( BG. PSB 3303 ) BY FC ARK SHALOM
4 11.15 hrs Stopped loading H4 / Completed discharge on BG. PSB 3303
11.15 - 11.30 hrs Transferred bulldozer from barge to FC ARK SHALOM
11.30 hrs BG. PSB 3303 / TB. PSB 03 Cast off
11.30 - 12.25 hrs Manuevering barge to a/side
12.25 hrs 15th BG. ARK CITRINE / TB. ARK NAPTHALI a/side at FC ARK SHALOM
4 12.25 hrs Resumed loading H4 ( BG. ARK CITRINE ) BY FC ARK SHALOM
Bad Weather 4 14.15 - 18.15 hrs Stopped laoding H4 due to FC ARK SHALOM rolling ( High Swell )
Cloudy 4 18.15 hrs Resumed loading H4 ( BG. ARK CITRINE ) BY FC ARK SHALOM
4 21.30 - 21.45 hrs Stopped laoding H4 / FC ARK SHALOM Shifted from H4 to H8
8 21.45 hrs Resumed loading H8 ( BG. ARK CITRINE ) BY FC ARK SHALOM
8 23.30 hrs Stopped loading H8 / Completed discharge on BG. ARK CITRINE
23.30 - 23.45 hrs Transferred bulldozer from barge to FC ARK SHALOM
23.45 hrs BG. ARK CITRINE / TB. ARK NAPTHALI Cast off
23.45 - 24.00 hrs Manuevering barge to a/side

SEPT 08, 2021 Cloudy 00.00 - 00.45 hrs Manuevering barge to a/side
Wednesday 00.45 hrs 16th BG. BENAMI VI / TB. MICHELLE VI a/side at FC ARK SHALOM
8 00.45 hrs Resumed loading H8 ( BG. BENAMI VI ) BY FC ARK SHALOM
Bad Weather 8 01.25 - 04.45 hrs Stopped laoding H8 due to FC ARK SHALOM rolling ( High Swell )
Cloudy 04.45 - 05.00 hrs Transferred bulldozer from FC to barge
8 05.00 hrs Resumed loading H8 ( BG. BENAMI VI ) BY FC ARK SHALOM
8 09.00 hrs Stopped loading H8 / Completed discharge on BG. BENAMI VI
09.00 - 09.15 hrs Transferred bulldozer from barge to FC ARK SHALOM
09.15 hrs BG. BENAMI VI / TB. MICHELLE VI Cast off
09.15 - 10.25 hrs Manuevering barge to a/side

10.25 - 10.40 hrs Transferred bulldozer from FC to barge


8 10.40 hrs Resumed loading H8 ( BG. GRACE ) BY FC ARK SHALOM
Bad Weather 8 15.15 - 17.35 hrs Stopped loading H8 due to FC ARK SHALOM rolling ( High Swell )
Cloudy 8 17.35 hrs Resumed loading H8 ( BG. GRACE ) BY FC ARK SHALOM
8 18.20 - 18.30 hrs Stopped loading H8 / FC ARK SHALOM Shifted from H8 to H7
7 18.30 hrs Resumed loading H7 ( BG. GRACE ) BY FC ARK SHALOM
Bad Weather 7 19.15 - 24.00 hrs Stopped loading H7 due to FC ARK SHALOM rolling ( High Swell )

SEPT 09, 2021 Bad Weather 7 00.00 - 09.15 hrs No activity due to FC ARK SHALOM ROLLING ( High Swell )
Thursday Cloudy 7 09.15 hrs Resumed loading H7 ( BG. GRACE ) BY FC ARK SHALOM
7 09.45 hrs Stopped loading H7 / Completed discharge on BG. GRACE
We hereby certify that the above time records are true and correct : Continued to Page No. 6
Time Sheet / Statement Of Fact
Working Records
Page : 6 ( Six )

Date / Day Weather Hatch No Working Time Remarks


09.45 - 10.00 hrs Transferred bulldozer from barge to FC ARK SHALOM
10.00 hrs BG. GRACE / TB. EMILY Cast off
10.00 - 10.45 hrs Manuevering barge to a/side
10.45 hrs 18th BG. ARK AMETHYST / TB. ARK REUBEN a/side at FC ARK SHALOM
7 10.45 hrs Resumed loading H7 ( BG. ARK AMETHYST ) BY FC ARK SHALOM
7 11.25 - 11.40 hrs Stopped laoding H7 / FC ARK SHALOM Shifted from H7 to H2
2 11.40 hrs Resumed loading H2 ( BG. ARK AMETHYST ) BY FC ARK SHALOM
2 14.30 - 14.45 hrs Stopped loading H2 / Transferred bulldozer from FC to barge
Bad Weather 14.45 - 24.00 hrs No loading activity due to high swell & strong wind ( Bad Weather )

SEPT 10, 2021 Bad Weather 00.00 - 06.10 hrs No loading activity due to high swell & strong wind ( Bad Weather )
Friday Cloudy 2 06.10 hrs Resumed loading H2 ( BG. ARK AMETHYST ) BY FC ARK SHALOM
2 07.45 hrs Stopped loading H2 / Completed discharge on BG. ARK AMETHYST
07.45 - 08.00 hrs Transferred bulldozer from barge to FC ARK SHALOM
08.00 hrs BG. ARK AMETHYST / TB. ARK REUBEN Cast off
08.00 - 08.45 hrs Manuevering barge to a/side
08.45 hrs 19th BG. BALENO I / TB. FAREL 09 a/side at FC ARK SHALOM
Rain 08.45 - 10.00 hrs No activity due to heavy rain
Cloudy 2 10.00 hrs Resumed loading H2 ( BG. BALENO I ) BY FC ARK SHALOM
Bad Weather 2 14.30 - 16.00 hrs Stopped loading H2 / FC ARK SHALOM ROLLING & High Swell ( Bad Weather )
Cloudy 2 16.00 hrs Resumed loading H2 ( BG. BALENO I ) BY FC ARK SHALOM
2 17.00 - 17.15 hrs Stopped loading H2 / FC ARK SHALOM Shifted from H2 to H6
6 17.15 hrs Started loading H6 ( BG. BALENO I ) BY FC ARK SHALOM
6 18.15 hrs Stopped loading H6 / Completed discharge on BG. BALENO I
18.15 - 18.30 hrs Transferred bulldozer from barge to FC ARK SHALOM
18.30 hrs BG. BALENO I / TB. FAREL 09 Cast off
18.30 - 19.30 hrs Manuevering barge to a/side
19.30 hrs 20th BG. BULESKO I / TB. K VI a/side at FC ARK SHALOM
6 19.30 hrs Resumed loading H6 ( BG. BULESKO I ) BY FC ARK SHALOM
Bad Weather 6 20.30 - 24.00 hrs Stopped loading H6 / FC ARK SHALOM ROLLING & High Swell ( Bad Weather )

SEPT 11, 2021 Bad Weather 00.00 - 13.00 hrs No activity due to FC ARK SHALOM ROLLING & High Swell ( Bad Weather )
Saturday Cloudy 6 13.00 hrs Resumed loading H6 ( BG. BULESKO I ) BY FC ARK SHALOM
6 14.45 - 15.00 hrs Stopped loading H6 / Transferred bulldozer from FC to barge
6 15.00 hrs Resumed loading H6 ( BG. BULESKO I ) BY FC ARK SHALOM
Bad Weather 6 15.30 - 17.30 hrs Stopped loading H6 / FC ARK SHALOM ROLLING & High Swell ( Bad Weather )
Cloudy 6 17.30 hrs Resumed loading H6 ( BG. BULESKO I ) BY FC ARK SHALOM
6 18.15 hrs Stopped loading H6 / Completed discharge on BG. BULESKO I
18.15 - 18.30 hrs Transferred bulldozer from barge to FC ARK SHALOM
18.30 hrs BG. BULESKO I / TB. K VI Cast off
18.30 - 19.20 hrs Manuevering barge to a/side
19.20 hrs 21st BG. PSB 3303 / TB. PSB 03 a/side at FC ARK SHALOM
6 19.20 hrs Resumed loading H6 ( BG. PSB 3303 ) BY FC ARK SHALOM
Bad Weather 6 19.20 - 24.00 hrs Stopped loading H6 / FC ARK SHALOM ROLLING & High Swell ( Bad Weather )

SEPT 12, 2021 Bad Weather 00.00 - 03.00 hrs No activity due to FC ARK SHALOM ROLLING & High Swell ( Bad Weather
Sunday Cloudy 6 03.00 hrs Resumed loading H6 ( BG. PSB 3303 ) BY FC ARK SHALOM
6 03.20 - 03.35 hrs Stopped loading H6 / Transferred bulldozer from
We hereby certify that the above time records are true and correct : Continued to Page No. 7
Time Sheet / Statement Of Fact
Working Records
Page : 7 ( Seven )

Date / Day Weather Hatch No Working Time Remarks


6 03.35 hrs Resumed loading H6 ( BG. PSB 3303 ) BY FC ARK SHALOM
6 07.15 hrs Stopped loading H6 / Completed discharge on BG. PSB 3303
07.15 - 07.30 hrs Transferred bulldozer from barge to FC ARK SHALOM
07.30 hrs BG. PSB 3303 / TB. PSB 03 Cast off
07.30 - 08.30 hrs Intermediate draft survey by C/Officer & Surveyor
07.30 - 08.45 hrs Manuevering barge to a/side
08.45 hrs 22nd BG. MARINE POWER 3012 / TB. MARINA 12 a/side at FC ARK SHALOM
08.45 hrs Resumed loading H6 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
09.45 - 10.00 hrs Stopped loading H6 / FC ARK SHALOM Shidted from H6 to H8
10.00 hrs Resumed loading H8 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
10.30 - 12.00 hrs Stopped loading H8 due to heavy rain
12.00 hrs Resumed loading H8 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
12.50 - 13.10 hrs Stopped loading H8 / FC ARK SHALOM Shifted from H8 to H6
13.10 hrs Resumed loading H6 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
15.05 - 15.20 hrs Stopped loading H6 / FC ARK SHALOM Shifted from H6 to H2
15.20 hrs Resumed loading H2 ( BG. MARINE POWER 3012 ) BY FC ARK SHALOM
17.00 hrs COMPLETED LOADING MV. GREAT PERSEUS
17.00 - 18.00 hrs Final draft survey by C/Officer & Surveyor
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
We hereby certify that the above time records are true and correct : Last page
Time Sheet / Statement Of Fact
Working Records
Page : 8 ( Eight )

Date / Day Weather Hatch No Working Time Remarks


hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
We hereby certify that the above time records are true and correct : Continued to Page No. 9
Time Sheet / Statement Of Fact
Working Records
Page : 9 ( Nine )

Date / Day Weather Hatch No Working Time Remarks


hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
We hereby certify that the above time records are true and correct : Last Page
12.00 DEC 6, 2020

16.15 DEC 6, 2020

p.m DEC 9, 2020

18.30 - 19.30 LT / N0VEMBER 30, 2020

18.30 - 19.30 LT / N0VEMBER 30, 2020

10.00 - 11.00 LT / DECEMBER 6, 2020


45,000 MT
21.30 - 23.31 hrs Waiting export permit document from the custom
21.50 hrs BG. VIRGO SEJATI 27 / TB. VIRGO SEJATI 388 cast off
23.31 hrs Completed export permit document from custom
23.31 - 24.00 hrs Clearance out process at harbor master
24.00 hrs Completed the port clearance out

OCT 14, 2020 Cloudy 00.00 - 01.15 hrs Delivery ship's document & port clearance to vessel
WEDNESDAY 01.15 hrs Ship's document & Port clearance on board
02.10 hrs Pilot on board for vessel departure
02.36 hrs Vessel sailing
03.05 hrs Pilot off