S.No. SI No. of Quantity Reference
Items
1 01-30 Clearing and Grubbing, all as specified. 37'-0"
1
1 / 100.0 x 53.00 = 5300.00 sft 3.62' 2
53'
2 01-32 Compaction of Natural Ground upto 93% Modified AASHTO density all as specified.
1 / 100.00 53.00 = 5300.00 sft
or 492.37 sqm
Making Embankment, with the specified /approved soil obtained from borrow excavation within one
3 01-35 KM, incl compaction in 150mm layers upto 93% Modified AASHTO density, and dressing to required
profile and shape as specified.
1 / 100.00 x 37.00 x 1.34 = 4958.00 cft
2 / 100.00 x 5.32 x 1.34 = 1425.76 cft
0.5/2 / 100.00 x 2.68 x 1.34 = 359.12 cft
6742.88 cft
or 190.96 cum
Length
No
Height
Width
(ft)
(ft)
(ft)
S.No. SI No. of Quantity Reference
Items
5 02-15 Bottoming /Sub base of any thickness as specified, using Granular Sub Base material, laid and
compacted to 100% Modified AASHTO density by appropriate compaction equipment and roller.
1 / 100.00 x 24.00 x 0.67 = 1600.80 cft
or 45.335 cum
Aggregate Base Course, of any thickness as specified, laid and compacted to 100% Modified
6 02-18
AASHTO density, by appropriate compaction equipment and roller.
1 / 100.00 x 24.00 x 0.58 = 1399.20 cft
or 39.625 cum
Providing & laying, premix Asphaltic Base Course of any thickness, as specified, with bitumen 60/70
8 02-82
or 80/100 using JMF (except prime coat).
1 / 100.00 x 24.00 x 0.25 = 600.00 cft
or 16.992 cum
or 38.06 Tons Density of ABC = 2.24T/Cum
Providing and laying, premix Asphaltic Wearing Course of any thickness, as specified, with asphalt
10 02-83
bitumen 60/70 or 80/100, using JMF (except Tack coat).
1 / 100.00 x 24.00 x 0.17 = 400.08 cft
or 11.330 cum
or 26.68 Tons Density of AWC = 2.355 T/Cum
Providing and laying of Pre-Cast Concrete (Edge stones) CC Type ‘B,’ using crushed or broken
11 03-45 stones as in walls, partitions, slabs, sills, copings, channels, steps, string courses, corbels, pier caps,
hinge stones, mantel pieces, louvers, chimney tops etc incl setting in CM 1:4, but except jointing and
pointing.
2 / 100.00 x 0.50 x 1.00 = 100.00 cft
or 2.83 cum